Laserfiche WebLink
2017 PAVEMENT REHABILITATION AND DRAINAGE IMPROVEMENT PROJECT <br /> BID SUMMARY <br /> O'GRADY PAVING,INC. O'GRADY PAVING,INC. <br /> ENGINEER'S ESTIMATE <br /> BID AMOUNT ADJUSTED AMOUNT <br /> Item Unit of Estimated <br /> Item Description Unit Price Amount Unit Price Amount Unit Price Amount <br /> No. Measure Quantity <br /> 1 Mobilization LS 1 $50,000.00 $50,000.00 $50,000.00 $50,000.00 $50,000.00 $50,000.00 <br /> 2, Traffic Control. - ' LS *.1 $70,000.00 °' $70,000:00 =:$145,000.00..";•$145,000°00,=x$75,000°00 $75,000.00 <br /> 3 4"Full Grind SF 254,938 $1.00 $254,938.00 $1.30 $331,419.40 $1.10 $280,431.80 <br /> 4 6'Wedge Grind LF 9,250 $2.00. "$18,500.00, $2.25 $20,812.50' $2.25 $20,812.50, <br /> 5 10'Conform Grind SF 780 $1.50 $1,170.00 $4.00 $3,120.00 $4.00 $3,120.00 <br /> 6 4"Digout(4'wide minimum) ".''. °,' SF, 2,452 $8.00 ' $19,616.00, + ; $11.00•`' $26,972.00: 1 : ;$11.00 $26,972.00 <br /> 7 Type II Microsurfacing SF 394,791 $0.30 $118,437.30 $0.40 $157,916.40 $0.30 $118,437.30 <br /> 8 2"A.C.Overlay TON 1,164 $120°00 ,, $139,680:00 $130:00 - $151,320.00"`° $120.00 $139,680.00 <br /> 9 4"A.C.Paving TON 6,692 $120.00 $803,040.00 $130.00 $869,960.00 $120.00 $803,040.00 <br /> Perform up to 8''A.C.Overlay <br /> 10 TON 47 $120.00 $5,640.00 $430.00 $20,210.00 $430°00 ° $20,210.00 <br /> (Newbridge Drive) <br /> 11 Adjust Manholes EA 26 $900.00 $23,400.00 $1,000.00 $26,000.00 $1,000.00 $26,000.00 <br /> 12 Adjust Monuments EA 3"73 $500:00, $36,500:00 $600.00," : '$43;800.00 _'' "$600°00 " .$43,800°00 <br /> 13 Adjust clean-out EA 1 $500.00 $500.00 $600.00 $600.00 $600.00 $600.00 <br /> Remove and,Install Stop/Limit Line <br /> 14 - - EA X32 $150 00 $4 800 00 $150 00 - $4;800.00_ $150 00 �a. $4,800,00 <br /> (Extruded Thermoplastic) . <br /> 15 Remove and Install Detail 21(Extruded LF 3,845 $1.75 $6,728.75 $2.00 $7,690.00 $2.00 $7,690.00 <br /> Thermoplastic) <br /> Remove and Install Detail 22(Extruded <br /> 16 LF <br /> 3,920 $2.00 $7,840.00 $2.50, $9,800.00,. ` $2.50 $9,800°00 <br /> Thermoplastic), <br /> 17 Remove and Install Detail 23 LF 180 $3.00 $540.00 $2.00 $360.00 $2.00 $360.00 <br /> 18 Remove and Install Blue Reflectors EA 54 $30.00 $1,620.00 $25.00'- $1,350.00 $25.00. $1,350.00 <br /> 19 Remove and Install"STOP AHEAD" EA 3 $200.00 $600.00 $200.00 $600.00 $200.00 $600.00 <br /> (Extruded Thermoplastic) <br /> Remove and Install Yellow Ladder <br /> 20. SF 200 $3.00' $600.00, $4.00 $800°00 $4.00 $800°00 <br /> Crosswalk(Extruded Thermoplastic) ^ <br /> 21 Install White Crosswalk(Extruded SF 316 $3.00 $948.00 $3.00 $948.00 $3.00 $948.00 <br /> Thermoplastic) <br /> Remove andReplace°4,'Wide Concrete • <br /> 22 LF '150 $200.00 $30,000°00 - $150.00 $22; 500.00, $150°00 ;$22,500°00 <br /> Valley Gutter ° <br /> 23 Remove and Replace 3'wide Concrete LF 26 $200.00 $5,200.00 $150.00 $3,900.00 $150.00 $3,900.00 <br /> Rolled Curb <br /> Remove existing A°C.Dike and Construct <br /> 24 LF. .160 $150.00 $24,000.00 $120.00' $19,200°00 ." $120.00 $19,200.00 <br /> concrete curb(type,A1-6) <br /> 25 Remove and Replace Concrete Apron SF 350 $40.00 $14,000.00 $25.00 $8,750.00 $25.00 $8,750.00 <br /> Remove and Install 2.5'wide Concrete <br /> 1' <br /> 26 LF 150 ' $150.00 $22,500.00 •$125°00 $18,750.00„ $125:00 $18,750.00„ <br />� Curb and Gutter <br /> Remove Existing A.C.Dike and Replace <br /> 27 with Type D A.C.Dike(Include backfill LF 5,547 $20.00 $110,940.00 $12.00 $66,564.00 $12.00 $66,564.00 <br /> behind dike) <br /> ,Remove Existing A.0 Dike and Replace >: .� • <br /> 28 with Type A A.C.Berm(Include backfill LF 427 $2.0:00, : .$8,540°00 " $30.00`, $12,810°00 f $30.00 $12,810.00 <br /> behind <br /> 29 Install Catch Basin Type 2 EA 1 $7,000.00 $7,000.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 <br /> Install 16"diameter.PE3408 High Density.' ° <br /> 30 LF .'18, $400°00 � $7,200.00 $500.00 $9,000.00 ,,'$500.00 . $9,000.00 <br /> Polyethylene(HDPE)Pipe-DR 11 <br /> 31 Controlled Density Fill CY 8 $200.00 $1,600.00 $600.00 $4,800.00 $600.00 $4,800.00 <br /> 32 Paint Curb White LF' , ,-160 ,$3:00 $480.00" , _ $2.00 ,, $320.00 -_p. r= $2°00 ,r ' _ $320°00 <br /> Resolution 44-17 Page 2 <br />