Laserfiche WebLink
Councilmember Kerr explained that since the installation of the Cingular cell tower, at <br /> Town Hall, energy consumption had increased. The proposed solar expansion would <br /> accommodate power for the cell tower and EOC antennas. <br /> Following discussion, staff was directed to include solar trackers as an option for the <br /> solar expansion. The item would return to Council for discussion and their consideration <br /> once staff had a project cost from the contractors. <br /> 8.3.3 Pine Lane Sanitary Sewer Diversion Project <br /> City Engineer Louie provided a brief overview of the Pine Lane Sanitary Sewer Diversion <br /> Project to Council. The design of Phase I of the project, the construction of 1,100 feet of <br /> 8 inch pipe connecting the Los Altos Hills and Palo Alto sewer system, was located in the <br /> County portion of Foothill Expressway. The design has been reviewed by the County and <br /> comments were being incorporated into the project. For Phase-11, the City of Palo Alto <br /> has requested that the Town upsize their existing pipe to accommodate the project or <br /> construct a new line parallel to the sewer main on Foothill Expressway. Staff had <br /> scheduled a meeting with Palo Alto officials to discuss this request. <br /> 8.4 City Clerk <br /> 8.4.1 Report on Council Correspondence <br /> No Report <br /> 9. PRESENTATIONS FROM THE FLOOR <br /> OPENED PRESENTATIONS FROM THE FLOOR <br /> No public comments. <br /> CLOSED PRESENTATIONS FROM THE FLOOR <br /> 10. PUBLIC HEARINGS <br /> 10.1 Consideration of Amendment to Add Territory to Existing Underground <br /> District IA Boundary at Purissima Road from Samuel Lane to Minorca Court, <br /> Viscaino Road from Purissima Road to Roble Ladera Road and Viscaino <br /> Place <br /> Mayor Warshawsky explained that before Council for their consideration was a proposed <br /> resolution to add territory to the existing Rule 20A Underground District No. IA. <br /> City Engineer Henry Louie commented that after review of the preliminary engineering <br /> evaluation done by staff and PG&E of the Town's underground pilot project, it was being <br /> recommended that the District area be amended to include Viscaino Place. This would <br /> accommodate the existing overhead facilities and structures in the area. Louie noted that <br /> 9 <br /> City Council Meeting Minutes <br /> October 12,2006 <br />