Laserfiche WebLink
5.3 Update on General Plan Review <br /> Councilmember O'Malley reported that the Planning Director had prepared copies of the <br /> Town's General Plan for the Ad Hoc Committee. He expected the Committee, with a <br /> membership comprised of Former Mayor Elayne Dauber and Former Planning <br /> Commissioners Carol Gottlieb, Janet Vitu, Dot Schreiner, Planning Commissioner <br /> Chairman Carl Cottrell and himself, to complete the initial revision of the General Plan <br /> that would consist of the correction of inaccuracies and the identification of issues by <br /> January or February 2006. O'Malley noted that the second step in the process to update <br /> the General Plan would be undertaken by a more formal Committee chartered by Council <br /> with the General Plan update. <br /> 5.4 Update on Byrne Preserve Repairs (Photo Presentation) <br /> Public Works Director/City Engineer Henry Louie presented a PowerPoint presentation to <br /> Council that consisted of before and after photos of'the repair work that had been <br /> completed in Byrne Preserve. Louie noted the bridge repairs included bracing and <br /> replacement of the railing, the Ginzton trail had been cleared and signage had been <br /> repaired. He reviewed the design detail plans for the bridge repairs and added that he <br /> believed the restoration work had added two years to the life expectancy of the bridges. <br /> Councilmember O'Malley had visited the bridge and commended Louie on the work. <br /> 5.5 Update on Status of Major/Priority Path Projects <br /> • Public Works Director/City Engineer Henry Louie reported that following the adoption of <br /> the pathway CIP projects, staff had been working with Caltrans and Foothill College on <br /> the Moody/El Monte Road Pathway Corridor. Foothill staff had provided the Town with <br /> a copy of their traffic circulation study and would be providing a topography map for the <br /> area along Adobe Creek. Louie noted that the Town was working with the Santa Clara <br /> Valley Water District to determine what the preferred materials were for the proposed <br /> pathway. The traffic circulation study had been forwarded to Caltrans for their review <br /> and comment. If any additional study is required by Caltrans, staff would provide Council <br /> with an update. <br /> 5.6 Proposal for Plants and Plant Maintenance at Town Hall <br /> Mayor Kerr recused himself from consideration of this item due to a potential conflict of <br /> interest and stepped down from the dais. <br /> Councilmember Mordo offered that he had brought this item before Council after <br /> receiving a proposal from Sandy Humphries for the plant service. He noted that he <br /> favored addition of plants to the facility but if staff was not supportive because of the <br /> expense, he understood. <br /> • <br /> 3 <br /> City Council Regular Meeting Minutes <br /> August 18,2005 <br />