Laserfiche WebLink
Al <br /> 3 <br /> Staff Report to the Planning Conunission <br /> April 6,2006 <br /> Page 2 of 2 <br /> 5. Sec. 10-1.502 Development Area <br /> (5) Photovoltaic Power Generation Facilities. <br /> A. Photovoltaic Power Generation Facilities that are connected to the Grid and that <br /> are 500 square feet or less are exempt from the requirements of this section. <br /> Photovoltaic Power Generation Facilities greater than 500 sq. ft. in area are <br /> subject to the requirements of this section, unless the Planning Commission <br /> determines that the offsite visual impacts of the facility are adequately mitigated. . <br /> 6. Section 10-2.301.Permits <br /> (8) The construction, placement, or installation of any structure supporting <br /> Photovoltaic Power Generation Facilities that is not more than six (6') feet in height <br /> and not more than nine hundred(900) square feet in development area; <br /> (9) The construction, placement or installation of Photovoltaic Power Generation <br /> Facilities on an existing structure that are less than eighteen (18") inches higher than <br /> the existing structure. <br /> The changes above have been incorporated into the draft ordinance in Attachment 2. <br /> CEQA STATUS <br /> The proposed ordinance amendment is exempt from California Environmental Quality <br /> Act(CEQA) pursuant to Section 15061(b)(3) of the CEQA Guidelines. <br /> ATTACHMENTS <br /> 1. Draft PV/Energy Efficiency Ordinance prepared by the Environmental Initiatives <br /> Committee dated February 29, 2006 <br /> 2. Proposed amendments to the Zoning and Site Development Ordinance Sections 10- <br /> 1.226, 10-1.239, 10-1.247, 10-1.702, 10-1.502, and 10-2.301 <br /> 3. Planning Commission staff report and attachments dated March 16, 2006 <br />