My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
45-22
LOSALTOSHILLS
>
City Clerk
>
Resolutions
>
2022
>
45-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2022 3:48:21 PM
Creation date
5/2/2022 3:48:21 PM
Metadata
Fields
Template:
Resolutions
Number
45-22
Date
04/21/22
Description
City Council of the Town Approving a Site Plan Design for the Dedicated Art Sculpture in the Roundabout of the Town Hall Parking Lot and Authorizing the City Manager to Engage with a Contractor for Related Installation Work not to Exceed $60,000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESOLUTION 45-22 <br />A RESOLUTION OF THE CITY COUNCIL OF THE TOWN OF LOS <br />ALTOS HILLS APPROVING A SITE PLAN DESIGN FOR THE <br />DEDICATED ART SCULPTURE IN THE ROUNDABOUT OF THE <br />TOWN HALL PARKING LOT AND AUTHORIZING THE CITY <br />MANAGER TO ENGAGE WITH A CONTRACTOR FOR RELATED <br />INSTALLATION WORK NOT TO EXCEED $60,000 <br />WHEREAS, on January 16, 2020, the City Council adopted resolution 02-20 which accepted a <br />donation of $100,00 from Karen Druker. The donation was restricted to the acquisition of a <br />sculpture in public spaces in Town; and <br />WHEREAS, on July 30, 2020, the Town entered into an agreement with Stoller Studio, Inc. for a <br />stainless steel sculpture which covered fabrication, transportation, and installation oversight by the <br />artist; however, the agreement did not include site design and construction work for the installation <br />of the sculpture; and <br />WHEREAS, staff recommends that the sculpture be installed in the roundabout of the Town Hall <br />parking lot. This location has received support from the Town's Public Art Committee; and <br />WHEREAS, using estimates from landscape contractors, staff predicts that the cost of installing <br />the sculpture to be around $51,808.00. <br />NOW THEREFORE, the City Council of the Town of Los Altos Hills hereby approves of a site <br />plan design for the dedicated art sculpture in the roundabout of the Town Hall parking lot, <br />appropriates $60,000 from the unreserved general fund for the related installation work, and <br />authorizes the City Manager to engage with a contractor not to exceed $60,000 for the related <br />work. <br />The above and foregoing Resolution was passed and adopted by the City Council of the Town of <br />Los Altos Hills at a regular meeting held on 21St of April 2022 by the following vote: <br />AYES: Tyson, Swan, Mok, Schmidt, Tankha <br />NOES: None <br />ABSTAIN: None <br />ABSENT: None <br />AT EST: <br />Deborah L. Padovan, City Clerk <br />By: <br />George Tyson, ayor <br />Resolution 45-22 <br />Page l <br />
The URL can be used to link to this page
Your browser does not support the video tag.