Laserfiche WebLink
Department and approved prior to commencement of this project. The approved plan shall be <br />stamped and signed by the project engineer and shall supersede the previously approved <br />grading drainage plan. <br />9. No grading shall take place during the grading moratorium (October 1 and April 30) except <br />with prior approval from the City Engineer. No grading shall take place within ten feet of any <br />property line. <br />10. An encroachment permit shall be obtained from the Public Works Department for all work <br />proposed in the public right-of-way. No work within the public right-of-way shall commence <br />without an encroachment permit. <br />11. Any, and all areas on the project site that have the native soil disturbed shall be protected for <br />erosion control during the rainy season and shall be replanted prior to final inspection. <br />12. All irrigation systems must be located at least three feet from the Town's pathways and outside <br />of the public right of way and public utility easements. The Town staff shall inspect the site <br />and any deficiencies shall be corrected to the satisfaction of the Engineering Department prior <br />to final inspection. <br />Project approval may be appealed if done so in writing within 21 days of the date of the approval. <br />Please refer to the Conditions of Project Approval set forth herein. If you believe that these <br />Conditions impose any fees, dedications, reservation or other exactions under the California <br />Government Code Section 66000, you are hereby notified that these Conditions constitute written <br />notice of a statement of the amount of such fees, and/or a description of the dedications, <br />reservations, and other exactions. You are hereby further notified that the 90 -day approval period <br />in which you may protest such fees, dedications, reservations, and other exactions, pursuant to <br />Government Code Section 66020(a), has begun. If you fail to file a protest within this 90 -day <br />period complying with all of the requirements of Section 66020, you will be legally barred from <br />later challenging such exactions. <br />Upon completion of the construction, a final inspection shall be required to be set with the <br />Planning and Engineering Departments prior to final building inspection approval. <br />NOTE: The Site Development permit is valid for one year from the approval date (until July 7, <br />2023). All required building permits must be obtained within that year and work, on items not <br />requiring a building permit shall be commenced within one year and completed within two years. <br />Resolution PC 11-22 Page 3 <br />