Laserfiche WebLink
plan at the December Town Hall Committee meeting that would include costs and estimated <br /> water usage/fees. <br /> 5.1a Approval of Facilities Exterior Material-Hardiplank <br /> A sample of the material to be used on the skin of the new Town Hall was available for the <br /> Committee to review. <br /> The Committee approved the use of the material but requested additional color selections. <br /> Duxbury concurred and noted that the final color of the building was still under review. <br /> 5.2 Discussion of Project Update—Peter Duxbury, Duxbury Architects <br /> Included with discussion of Agenda item 5.1. <br /> 5.3 Discussion of Final Solar Power Plant Design <br /> Mayor Pro Tem Kerr presented an overview of the Green Energy Project for the New Town <br /> Hall. He explained that the photovoltaic system for the New Town Hall had been revised to <br /> use an alternate solar panel. The result of the change was a more efficient system with a larger <br /> generation capacity. The revised plan with the new panels would provide a larger power plant <br /> in the existing foot print. The revised system would use the same number of pole mounted <br /> solar arrays'so there would be no visual impact. The pole mounts would be hidden from the <br /> road. Kerr reviewed the new total cost for the system that included the Green Energy Loan, <br /> Packard Foundation Grate and rebates. The new contract value that included the change order <br /> was within the budgeted amount for the project and would not require any funding from the <br /> Town's General Fund. <br /> 5.3a Presentation of New Town Hall Project Solar Panels—SunPower <br /> Kerr introduced representatives from Eco-Energies, the Green Energy Project contractor and <br /> Dick Swanson, founder of SunPower, the designers of the solar panels to be installed in the <br /> new revised plan. Swanson presented a brief company overview of SunPower. The <br /> Committee reviewed the sample panels. Committee consensus was a preference for the all <br /> black panel (black) trim. Swanson noted that SunPower's solar cells are more efficient and <br /> more aesthetically pleasing in their appearance. <br /> Kerr noted that this was exceptional technology and the source was a local firm. He noted that <br /> EcoEnergies were the risk taker in using this new product. EcoEnergies explained they would <br /> be installing them on another facility to evaluate them and adjust for any problems prior to <br /> their installation at Town Hall. They are responsible for the warranty of.the system. Eco- <br /> Energies provides a five year warranty and the solar panels have a twenty-five year warranty. <br /> MOTION SECONDED AND CARRIED: Moved by Warshawsky, seconded by Radford and <br /> passed unanimously to recommend approval of the change order for the revised photovoltaic <br /> design to the City Council. <br /> • 3 <br /> November 10,2004 <br /> Special City Council/Planning Commission <br /> New Town Hall Committee Meeting Minutes <br />