My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
91-05
LOSALTOSHILLS
>
City Clerk
>
Resolutions
>
2005
>
91-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2014 2:44:16 PM
Creation date
11/6/2014 2:44:15 PM
Metadata
Fields
Template:
Resolutions
Number
91-05
Date
2005-09-15
Description
Approving Cost of Additonal Landscaping at Town Hall
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> JENSEN CORPORATION LANDSCAPE CONTRACTORS LICENSE#259540 <br /> 10950 N.BLANEY AVENUE, CUPERTINO, CALIFORNIA 95014 (408)446-1118 FAX(408)446-4881 <br /> 7 <br /> September 12,2005 <br /> Mr.Tony Vierra <br /> TBI Construction <br /> Sent Via E-Mail <br /> Re: Los Altos Town Hall Path Extension Landscape-REVISED <br /> Dear Tony, <br /> This is to confirm our revised quotation for the above referenced project per schematic drawings as prepared by Jensen <br /> Corporation. The landscape would carry-on the look of the main Town Hall landscape,except that it would be drip <br /> irrigated to avoid water on the path. <br /> TOTAL-Landscape and Irrigation—REVISED $23,458.00 <br /> Includes_: <br /> Rake existing bark mulch for reinstallation at completion <br /> 5 gallon shrubs-Approx. 10 ea. <br /> 1 gallon ground cover spaced at.5 If on-center(triangular spaced) <br /> Soil preparation of individual plant holes <br /> Pre-emergent and bark mulch(replenish bark where needed) <br /> Automatic drip irrigation to connect to existing system <br /> Boring under DO path and repair where necessary <br /> Path lights(6 ea)connected to existing transformer <br /> Formally alternate area landscape and irrigation <br /> Exclusions: <br /> New irrigation controller <br /> New lighting transformer/controller <br /> Trees <br /> All drainage work <br /> All hardscape <br /> Landscape maintenance <br /> Alternates Adds: <br /> #1 Town Path Lighting +$4,675.00 <br /> Includes upsizing 1 ea.light transformer and addition of 8 ea.new path lights <br /> The lights are the same as used for Town Hall <br /> #2 New Area of Landscape&Irrigation Around Solar Panels=Approx.4,450 sf +$15,800.00 <br /> Includes: Clearing and Grubbing existing area,soil preparation, 1 gallon <br /> ground cover spaced at 5 if on center,8 ea.—5 gallon shrubs near house on side <br /> facing Town Hall and solar panels,pre-emergent weed control,bark mulch <br /> } to match Town Hall,Spray irrigation with as-built design plan tied into Town <br /> Hall system (Must be able to do project in conjunction with Town Trail landscape) <br /> N.I.C.landscape maintenance,lighting,new controller <br /> Sincerely, <br /> Mike Dalke <br /> Estimator <br /> National Award Winning Landscape Contractors <br />
The URL can be used to link to this page
Your browser does not support the video tag.