Laserfiche WebLink
Sh( .Reride <br />5121M7 <br />Page 2 <br />In order to successfully remove the existing driveway & install a new driveway (probably <br />pavers), it is important that the Project Arborist be involved at demolition & installation. <br />The existing asphalt must be carefully cracked &/or removed so as not to scrape away <br />more than the top 3" of existing base rock. The machine operator should start at the end <br />closest to the home & work their way backwards towards the street so as not to drive over <br />the newly exposed soil once the asphalt is removed. No further excavations are allowed <br />as there are existing feeder roots in the soil that would be removed. The current Health of <br />these trees will not allow for further soil/rock removals. <br />Additional base rock may then be added (sand, too), the rock slightly compacted & then <br />the proposed pavers can be installed. Pavers will allow for water & air circulation with <br />the Oak roots, which is beneficial. <br />Please contact me should you have any further questions <br />Respectfully, <br />Michael P. Young <br />