My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
37-08
LOSALTOSHILLS
>
City Clerk
>
Resolutions
>
2008
>
37-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 4:17:58 PM
Creation date
10/14/2014 2:43:44 PM
Metadata
Fields
Template:
Resolutions
Number
37-08
Date
2008-06-11
Description
Adopting a Revised Fee Schedule to be Effective on August 15, 2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• EXHIBIT I <br /> IIIP <br /> Town of Los Altos Hills <br /> Proposed Schedule of Fees,Deposits,Charges for Service,and Other Assessments - <br /> Effective Date: August 15,2008 <br /> Category/Process CURRENT PROPSED <br /> Item/Description FEE I (UNIT FEE <br /> I DEVELOPMENT PROCESS-PLANNING* <br /> A FEES AND CHARGES FOR SERVICES <br /> 1 Staff service rate - Planning Department <br /> Planning Director $ 200.00 per hour $ 205.00 <br /> Senior Planner $ 145.00 per hour « $ 150.00 <br /> Associate Planner $ 130.00 per hour , $ 135.00 <br /> Assistant Planner $ 120.00 per hour $ 125.00 <br /> 2 Consultant rate <br /> i. <br /> Including without limitation City Attorney,Town Geologist,engineering Applicable rate Applicable rate <br /> consultant,and Town Arborist charged to Town+ charged to Town+ <br /> 5%administration 10%administration <br /> charge charge <br /> 3 General <br /> General plan amendment $ 1,100.00 $ 1,130.00 <br /> Review of initial study $ 430.00 $ 445.00 <br /> Preparation of initial study $ 1,800.00 $ 1,850.00 <br /> Preparation of negative declaration $ 430.00 $ 540.00 <br /> Preparation of draft EIR by staff $ 5,000.00 Any direct and <br /> indirect costs incurred <br /> by the Town <br /> Review of draft DR prepared by outside consultant $ 830.00 $ 1,500.00 <br /> 4 Subdivision applications <br /> Tentative mar lots or fewer $ 1,450.00 per resulting $ 1,490.00 <br /> number of lots <br /> More than 4lots $ 1,450.00 per resulting $ 1,490.00 <br /> number of lots <br /> Time extension $ 285.00 $ 295.00 <br /> Appeal $ 430.00 $ 445.00 <br /> Amendment $ 760.00 $ 785.00 <br /> Final map: 4 lots or fewer $ 1,100.00 $ 1,130.00 <br /> More than 4 lots $ 1,100.00 $ 1,130.00 <br /> Final map certificate of correction $ 725.00 $ 745.00 <br /> Pathway in-lieu fee $ 50.00 per lineal foot of <br /> the average width <br /> of the property or <br /> $5,400,whichever <br /> is greater,for each <br /> lot without a path <br /> (one-time charge <br /> per lot) <br /> Roadway improvements $ 16.00 per lineal foot <br /> Recreation in-lieu fee See LAH 4. <br /> Municipal Code <br /> Sec 9-1.1403 <br /> Storm drainage fee-development area within public $ 0.65 per square foot it <br /> right-of-way or easements <br /> *Additional deposits may be collected if administratively deemed necessary. <br /> Effective date: August 15,2008 Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.