Laserfiche WebLink
Planning Commission <br />AT&T Wireless <br />December 9, 2004 <br />Page 2 <br />Conditions #10 and #12 require monitoring and reporting of radio frequency on a regular <br />basis to demonstrate compliance with regulatory limitations. As indicated in the attached <br />Statement of Hammett & Edison, Inc., Consulting Engineers, the maximum power <br />density level measured on August 12, 2004 was equal to 0.42% of the most restrictive <br />public limit on radio frequency exposure (see Attachment #4). Based on this information, <br />the site complies with the FCC guidelines limiting public exposure to radio frequency <br />energy. <br />Extension of the use permit will allow continued operation of the facility for an additional <br />period of time, at which point subsequent Commission review will be required. Staff <br />suggests a 5 -year review period, rather than the 3 -year review originally specified, <br />because the Town has not received any complaints about the site and does not anticipate <br />any problems with its continued use as a wireless communications facility. <br />CONCLUSION <br />No change is proposed to the existing facility. Since this facility was found to comply <br />with the required CUP findings when it was originally approved, and no complaints or <br />other problems related to the facility have been identified since that time, the Commission <br />should consider recommending approval of the extension to the City Council. <br />ATTACHMENTS: <br />1. Letter dated October 26, 2004 from AT&T Wireless requesting renewal -of the CUP <br />2. Conditions of Approval from the original approval, dated October 20, 1993 <br />3. Photos showing landscape screening <br />4. Statement of Hammett & Edison, Inc., dated September 21, 2004 <br />5. Site plans <br />cc: Marsha Converse, Property Management <br />Suite 1500 <br />651 Gateway Blvd. <br />South San Francisco, CA 94080 <br />