My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/05/1989 (2)
LOSALTOSHILLS
>
City Clerk
>
City Council Minutes
>
1989
>
04/05/1989 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2015 3:19:46 PM
Creation date
6/16/2015 3:19:44 PM
Metadata
Fields
Template:
Minutes
Date
1989-04-05
Description
Regular Meeting Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
41, <br /> F. OLD BUSINESS: <br /> 1. Status Report from Sun Country Cable <br /> John Dolan, Executive Vice President - Sun Country Cable, Inc. , <br /> presented an overview of a status report sent to the Acting City <br /> Manager on 3/31/89 (on file at Town Hall) . In part, Mr. Dolan made the <br /> following points. A customer service representative had been hired and <br /> agreement had been reached with the Purissima Water District on the <br /> use of the Page Mill Road water tank site for the headend. Field <br /> engineering had been completed and pole applications had been <br /> submitted to Pacific Telephone. Mr. Dolan anticipated the construction <br /> of the cable system to begin in late April or early May and stated <br /> that they would begin building the underground plant then construct <br /> the aerial plant as soon as pole clearances were received. It appeared <br /> the pole clearance applications would take an additional sixty days <br /> from the anticipated early May proposed date for construction. Sun <br /> Country had hired CH2M Hill, an engineering firm, to work on the <br /> applications required by the County for the permits for the headend. <br /> The timeframe estimated by CH2M Hill is between 90 and 180 days. Mr. <br /> Dolan stated that work would proceed based on the assumption that the <br /> system would be built while the headend was going through the zoning <br /> process in order to keep delays to an absolute minimum. <br /> Dan Alexander, Purissima Hills Water District Board Member, offered <br /> the assistance of Bill McCann, General Manager of the Purissima Water <br /> District, in showing the Council the location of the proposed headend. <br /> Claire Lewis, Canario Way, inquired about the areas to be cabled first <br /> and the fee structure. <br /> van Tamelen inquired if access tv with Foothill College was being <br /> discussed and Mr. Dolan said that conversations were taking place with <br /> George Beers of Foothill College. <br /> MOTION SECONDED AND CARRIED: Moved by Siegel , seconded by van Tamelen <br /> and passed unanimously to instruct staff to request the Site <br /> Development Committee to review the proposed location of the headend <br /> as it aesthetically related to the site and to make a recommendation <br /> to the Council . Council further directed that a representative from <br /> Sun Country Cable be included on any site visits and a report be <br /> forthcoming on cable tv at the first meeting in July. <br /> G. NEW BUSINESS: <br /> 1. Report from Mayor on water reduction measures and consideration <br /> of introduction of ordinance <br /> 5- 4/5/89 <br />
The URL can be used to link to this page
Your browser does not support the video tag.