Laserfiche WebLink
SCHEDULED ITEM IVO. 1: <br />PUBLIC HEARING ON FLOOD CONTROL WORK FOR ADOBE CREEK FROM TEPA WAY TO <br />BL MONTE ROAD. <br />Staff reviewed that this public hearing was called to consider the Flood <br />Controls proposal to concrete line a section of Adobe Creek between Tepa <br />Way and E1 Monte Road. Correspondence relative to this project was noted <br />from Mrs. F. Fava, 26691 Moody Road; Messrs. R. B.; Oliver, 25466 Adobe <br />Lane; N. McIlwraith, 13431 Wildcrest Drive; and L. C. Fowler of S. C. County <br />Flood Control. <br />Mr. Fowler reviewed the plans presented at the last Council meeting noting <br />that the proposed concrete channel would be interwoven around the existing <br />trees and could be colored earthen if desired. He stated if the plan was <br />o.cceptable and pigmentation was desired by the Toxin to effect a more natural <br />visual effect, that Town financial participation ($15,000) would be required <br />for this option. He advised that alternatives available to the proposed <br />channel which would be 101 wide at the bottom, 81 deep and 121 wide at the <br />top (Note: larger than previously stated) would be: <br />1. Leave the area as is, continuing to subject those homes in the <br />area to flooding. <br />2. Construct an earthen trapezoidal channel which would require <br />additional R.O.W. to safely carry the flood flaw; removal of 4 <br />homes and more than double the cost of the proposed $300,000 <br />Project. He noted this type of channel would necessitate concrete <br />drop structures in selected locations and there would not be any <br />allowance for natural vegetation that might interfere with the flow. <br />3. Construct a smaller concrete lined trapezoidal channel estimated <br />at $400,000. <br />4. Create a semi flood plain for $500,000 but erosion would continue <br />to create problems. <br />5. Install box culverts - either a 121 pipe with inherent handling <br />n.coblems due to its mass o�: t:wo 8I pipes at a cost of $520,000. <br />5. Construct an open vertical box at $325,000. <br />T-07aaing the presentation, floor comments were heard from Mies. F. Fava; <br />M. c-- Boissevain, 27181 Sherlock Road; M. Gaspich, 25473 Elena Road; <br />W. Roscoe, 12234 Tepa Way; R. E. Stutz, 25310 Elena; F. J. Schnoor, <br />?L=: Adobe Lane; J. C. Schaefer, 25631 Moody Road; F. J. Costello, Jr., <br />2GC'S0 Moody Road, G. N. Browning, 13860 Page Mill Road; H. L. Byrd, 25640 <br />Goode Road and Sanford Hiller of the Sierra Club. <br />Council discussion noted that since the area is developed,a flood plain <br />application was not feasible because there is not adequate R.O.W. available. <br />kw Alternate approaches suggested would be "as required" clearing of the <br />existing creek bed and adding armor plate in certain areas especially <br />subject to eros,on. <br />.2- <br />