Laserfiche WebLink
ROADS <br />EXPIWDI TURES : <br />BUDGET <br />ACTUAL <br />ESTIMATE <br />56-57 <br />56-57 <br />57"58 <br />NORMAL MAINTENANCE <br />STRIPING <br />* <br />$ <br />500.00 <br />WEED CUTTING <br />* <br />300.00 <br />PATCHING <br />* <br />10,340.52 <br />109500,00 <br />CULVERT CLEANING <br />* <br />1,135.00 <br />1,200.00 <br />GRADING <br />* <br />613.71 <br />11000.00 <br />SIGNS <br />1,000.00 <br />960.65 <br />350.00 <br />TOTAL NORMAL MAINTENANCE * <br />$13,049.88 <br />$13,850.00 <br />MAXIMUM MAINTENANCE <br />EL MONTE <br />* <br />3?1.46 <br />E <br />STONEBR00$ <br />* <br />775.00 <br />ST <br />MARION <br />*I <br />33.91 <br />M <br />MAGDALENA <br />*A <br />952.68 <br />TED <br />TOTAL MAXIMUM MAINTENANCE * <br />2,133.05 <br />7,500.00 <br />DRAINAGE <br />* <br />00.00 <br />1,850.00 <br />EMERGENCY FUND <br />* <br />* <br />19500-00 <br />MISCELLANEOUS <br />' <br />414.98 <br />500.00 <br />INSPECTION <br />* <br />600.00 <br />500.00 <br />(SUB TOTAL (2) <br />$19,156.00 '.$169197.91 <br />$259700.00) <br />NEW CONSTRUCTION <br />5,535400 <br />0.00 <br />6,000,00 <br />TOTAL <br />$24,691.00 <br />$16,197.91 <br />$31,700.00 <br />CARRY OVER FOR NEW <br />CONSTRUCTION <br />5.420.30 <br />TOTAL 195? -58 ROAD BUDGET . . . . . . <br />. . . . . . <br />. .$3?,120.30 <br />(2) Excluding $1,000.00 Engineering <br />(*) Not budgeted - In detail in 56-57. <br />