Laserfiche WebLink
• • <br /> Town of Los Altos Hills EXHIBIT I <br /> Proposed Schedule of Fees,Deposits,Charges for Service,and Other Assessments <br /> Effective Date: August 1,2007 <br /> Category/Process AMOUNT OF <br /> Item/Descriptlon Fee I Deposit <br /> I DEVELOPMENT PROCESS-PLANNING <br /> A FEES AND CHARGES FOR SERVICES <br /> 1 Staff service rate-Planning Department <br /> Planning Director $200 per hour <br /> Senior Planner $145 per hour <br /> Associate Planner $130 per hour <br /> Assistant Planner $120 per hour <br /> 2 Consultant rate <br /> Including without limitation City Attorney,Town Geologist, Applicable rate charged to Town+5% <br /> engineering consultant,and Town Arborist administration charge <br /> 3 General <br /> General plan amendment $1,100 $1,380 <br /> Review of initial study $430 <br /> Preparation of initial study $1,800 $3,600 <br /> Preparation of negative declaration $430 $700 <br /> Preparation of draft HER by staff $5,000 $10,000 <br /> Review of draft EER prepared by outside consultant $830 $1,100 <br /> 4 Subdivision applications <br /> Tentative map: 4 lots or fewer $1,450 per resulting number of lots $6,900 <br /> More than 4 lots S 1,450 per resulting number of lots $9,675 <br /> Time extension $285 $285 <br /> Appeal $430 $560 <br /> Amendment $760 $830 <br /> Final map: 4 lots or fewer $1,100 $2,750 <br /> Morethan4lots $1,100 $6,900 <br /> Final map certificate of correction $725 $860 <br /> Pathway in-lieu fee $50 per lineal foot of the average <br /> width of the property or$5,400,whichever <br /> is greater,for each lot without a path <br /> (one-time charge per lot) <br /> Roadway improvements $16 per lineal foot <br /> Recreation in-lieu fee See LAH Municipal Code <br /> Sec 9-1.1403 <br /> Storm drainage fee-development area within public public $.65 per square foot <br /> right-of-way or easements <br /> Lot line adjustment $1,100 per resulting number lots $2,775 <br /> Lot merger $1,100 per resulting number lots $2,775 <br /> Town inspection of public improvments(does not include inspection $145 10%of total <br /> requirements of other public agencies) improvement cost <br /> 5 Annexation <br /> Number of lots: 4 lots or fewer $1,450 per number of lots $6,885 <br /> More than 4 lots $1,450 per number of lots $9,660 <br /> Time extension $280 $280 <br /> •Additional deposits maybe collated if deemed necessary. <br /> Page 1 <br />