My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.1
LOSALTOSHILLS
>
Planning Commission
>
Planning Commission Packets
>
1998
>
June 23, 1998
>
4.1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2016 1:06:45 PM
Creation date
12/9/2016 1:06:42 PM
Metadata
Fields
Template:
Staff Report
Date
1998-06-23
Item Number
4.1
Description
Site Development Permit for a Second Story Addition, New Carport & Remodel of an Existing Residence; Lands of Danver; 13474 Robleda Road; File #34-98-ZP-SD
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Planning Commission <br /> Lands of Danver <br /> June 23, 1998 <br /> Page 4 <br /> The carport has been included as development area, but has not been counted as floor <br /> area since it is open on two sides. The EDP Committee questioned the feasibility of the <br /> approach and backup for the carport. The plans have been reviewed by the Engineering <br /> Department, and the backup area does meet minimum Town standards. The carport is <br /> being cut into the site and the area between the carport and the east property would be <br /> graded out, so that the approach and backup space will be flatter and more functional for <br /> maneuvering of vehicles. <br /> Grading and Drainage - <br /> The Engineering Department has reviewed the plans and has recommended conditions of <br /> approval, as specified in Attachment 1. The proposed project would require only <br /> minimal grading to cut the carport into the site and level the backup area. The land slopes <br /> down in this area, so the excavation is limited as a result. Grading volumes include 98 <br /> cubic yards of cut and 58 cubic yards of fill. The surplus material would be removed <br /> from the site. A three to 3'V2 foot high wood retaining wall would be constructed around <br /> the backup area. <br /> Drainage improvements include new roof leaders that will tie into the existing drainage <br /> system, and a new energy dissipater where a drainage pipe daylights. Final drainage and <br /> grading will be reviewed by the Engineering Department, and any deficiencies will be <br /> required to be corrected,prior to final inspection. <br /> The property will remain on a septic system since the closest sewer lateral is more than <br /> 400 feet away. Any necessary permits will be required to be issued from the Santa Clara <br /> County Health Department prior to acceptance of plans for building plan check (condition <br /> #19). <br /> Fire Department Review <br /> The Santa Clara County Fire Department has reviewed the proposed project and has <br /> requested that the property address be clearly visible from Robleda Road and that the <br /> driveway meet Fire Department standards for access. The closest hydrant does not have <br /> an adequate flow capacity, so residential fire sprinklers or a new hydrant will be required <br /> (see Attachment 2). The Fire Department recommendations are included as conditions in <br /> Attachment 1. <br /> Committee Review <br /> The Pathways Committee has no request for pathway improvements or easements (see <br /> Attachment 4). Since no pathway improvements are required and the project is adding <br /> more than 900 square feet of habitable floor area, a pathway fee has been requested <br /> pursuant to Section 10-2.608 of the Site Development Ordinance. The fee of$7.00 per <br />
The URL can be used to link to this page
Your browser does not support the video tag.