HomeMy WebLinkAbout4.3 t
TOWN OF LOS ALTOS HILLS April 26, 1995
Staff Report to the Planning Commission
RE: SITE DEVELOPMENT PERMIT FOR A NEW RESIDENCE AND
POOL; LANDS OF WARD; 11801 FRANCEMONT DRIVE.
FROM: Suzanne Davis, Planner
RECOMMENDATION That the Planning Commission:
Approve the requested Site Development Permit as submitted, subject to the
attached conditions of approval.
BACKGROUND
The subject property is parcel 1 of the Bellucci Subdivision(Francemont Estates).
The lot is located on the southwest corner of Moody Road and Francemont Drive.
There is a storm drain and conservation easement along the northerly property
line where Adobe Creek runs through the lot.
There are a number of subdivision improvements which have not yet been
completed. While the applicant can receive approval of the proposed projects
(new residences and pools are alsoproposed on parcels 2 and 3), no building
permits can be issued until the required improvements are completed to the
satisfaction of the Town Engineering Department (see condition#16).
DISCUSSION
Site Data:
Net Lot Area: 1.10 acres
Average Slope: 10.3%
Lot Unit Factor: 1.09
Floor Area and Development Area:
Area Max. Prop. Exist. Incrs. Left
Devel. 16,227, 12,556 -0- 12,556 +3,671
Floor 6,524 6,122 -0- 6,122 +402
The applicant is requesting approval of a two-story residence and a swimming
pool. The second story will,cover 30% of the first floor. The second floor has
been pushed back from the front of the house to reduce the bulk and mass of the
building and to present a lower profile from the street. The maximum height of
4.
Planning Commission
April 26, 1995 .
Lands of Ward/parcel 1
Page 2
the house will be 27 feet as measured from the existing grade. The property has
several feet of fill which was required since the lot is within a flood plain. The
elevations show the original grades prior to the fill being placed on the site and
the finished grade. Exterior materials will consist of stucco siding,wood
windows and doors and tile roofing. There are also four small skylights planned.
Three of the required parking spaces are provided in the attached three-car
garage,with the fourth space in the circular turnaround. The proposal will leave
400 square feet of MFA and close to 3,700 square feet of development area
remaining for future additions or improvements.
One wall on,the north side of the house has been located immediately adjacent to
the conservation easement. Staff had recommended that the house be at least
five feet from the easement to allow a walkway to be installed and/or for ease of
access around the house without encroaching into the conservation easement.
The applicant believes that there will be no need to have a walkway on the north
side of the house since adequate access has been provided to the rear yard area.
The rear entry will open onto a terrace and pool area, and other than the one wall
adjacent to the conservation easement, there is ample space around the house for
circulation an id walkways. This is a reasonable argument, however, there should
also be an adequate distance between the house and conservation easement to
allow for grading and backfill of the foundation and for proper grading for
drainage around the foundation. The Commission will need to decide whether
the proposed placement of the house is acceptable.
The applicant has included a conceptual landscape plan with the development
plans to show proposed plantings for screening of the new residence and pool.
The final landscape plan will be reviewed by the Site Development Committee
once the house is framed.
The Engineering Department has reviewed the plans and has recommended
conditions of approval as specified in Attachment 1. Grading volumes total 570
cubic yards (500 cu. yds. of cut and 70 cu. yds. of fill). The excess 430 cubic yards
of cut will need to be exported from the site. Most of this material can be moved
to parcel 2 and used for fill. The project engineer will attempt to balance the cut
and fill for the three parcels so that trucking of material in or out of the area will
not be necessary.
There is a con iderable amount of the driveway and a portion of the proposed
turnaround area within the setbacks. The applicant has proposed this design to
keep the garage away from the street and to provide a more formal front entry to
the house. If the Commission feels that the amount of paving within the setbacks
is not acceptable, the applicant should be directed to change the design
accordingly. It should be noted that there is no decking or patio area proposed
within setbacks on this site. A condition of approval should be added if the
•
Planning Commission
April 26, 1995
Lands of Ward/parcel 1
Page 3
Commission decides to require any changes to the driveway or other aspects of
the project.
The Santa Clara Valley Water District has reviewed the plans and has found the
proposed construction acceptable. The applicant will be required to have
SCVWD review and approve the construction drawings prior to acceptance of
plans for building plan check.
The Town Geologist has conducted a review of the plans and geotechnical
reports and has visited the site. The recommendation for approval of the project
issubject to conditions (see Attachment 3). The Fire Department has no
recommended conditions.
The Pathways Committee visited the site and recommends that a type IIB path be
constructed along Moody Road and Francemont Drive. This will be done as part
of the subdivision improvements, so the condition of approval requires the
applicant to rehabilitate the paths as needed (see condition#15).
The project as proposed meets the requirements of the Zoning and Site
Development Ordinances, and staff is recommending approval. Staff is available
to answer any questions that the Commission or community may have.
ATTACHMENTS:
1. Recommended conditions of approval
2. Letter from William Cotton &Associates dated December 19, 1994 (four
pages)
3. Letter from William Cotton & Associates dated March 8, 1995 (four pages)
4. Letter from Santa Clara Valley Water District received December 21, 1994
(one page)
5. Pathways Committee recommendation dated January 25, 1995 (one page)
6. Revised development plans: topographic survey, site plan, elevations, floor
plans, roof plan and conceptual landscape plan (five sheets)
cc: Jim Ward & Associates
99 El Camino Real
Menlo Park, CA 94027
The WB Group
4151 Middlefield Road, Suite 115
Palo Alto, CA 94303-4743
Tom Scherer Architect
413 Capitola Avenue
Capitola, CA 95010
Planning Commission
April 26, 1945
Lands of Ward/parcel 1
Page 4
ATTACHMENT 1
RECOMMENDED CONDITIONS FOR SITE DEVELOPMENT PERMIT
FOR NEW RESIDENCE AND POOL
LANDS OF WARD- 11801 FRANCEMONT DRIVE
A. PLANNING DEPARTMENT:
1. Any changes or modifications to the approved plans shall be
approved by the Planning Director or the Planning Commission,
depending upon the scope of the changes.
2. The property owner shall inform the Town of any damage and
shall repair any damage caused by the construction of the project to
pathways, private driveways, public and private roadways prior to
final inspection and release of occupancy permits and shall provide
the Town with photographs of the existing conditions of the
roadways and pathways prior to acceptance of plans for building plan
check.
3. Prior to final inspection the final landscape planting plan shall be
submitted for approval by the Site Development Committee. Any
plantings proposed within the conservation and storm drain
easement shall be local riparian species. The Site Development
Committee may require a deposit, a landscape maintenance
agreement, or other security to assure that the approved landscape
is planted and maintained. Outdoor lighting shall be reviewed
with the landscape plan.
4. A grading and construction operation plan shall be submitted by
the property owner for review and approval by the City Engineer
and Planning Director prior to submittal of plans for building plan
check. The grading/construction operation plan shall address truck
traffic issues regarding dust, noise, and vehicular and pedestrian
traffic safety on Francemont Drive, Moody Road and surrounding
roadways; storage of construction materials; placement of sanitary
facilities; parking for construction vehicles; and parking for
construction personnel. A debris box (trash dumpster) shall be
placed on site for collection of construction debris. Arrangements
must be made with the Los Altos Garbage Company for the debris
box, since they have a franchise with the Town and no other hauler
is allowed within the Town limits.
• Planning Commission
April 26, 1995
Lands of Ward/parcel 1
Page 5
5. Skylights shall be designed and constructed to reduce emitted light.
No lighting may be placed within the skylight wells.
6. Paint color shall be chosen by the applicant and approved by staff
in conformance with the Town's adopted color board. A color
sample shall be submitted to the Planning Director for approval
prior to painting the exterior of the residence.
7. Fire retardant roofing is required for the residence.
8. Standard swimming pool requirements:
a. Lights shall be designed so that the source is not visible from
off-site.
b. Drainage outfall structures shall be constructed and located to
the satisfaction of the Town Engineering Inspector.
c. Fencing or a locking pool cover is recommended for safety.
d. Equipment shall be enclosed on all four sides and roofed for
noise mitigation.
B. ENGINEERING DEPARTMENT:
9. All conditions recommended by William Cotton & Associates'
report dated March 8, 1995, are conditions of this permit. A letter
of compliance prepared by the geotechnical consultant (regarding
the construction plans) shall be submitted to the Town prior to
acceptance of plans for building plan check. The Town Geologist shall
review and comment on the proposed groundwater monitoring
program prior to implementation.
10. The site drainage associated with the proposed development must
be designed as surface flow wherever possible to avoid
concentration of runoff. The proposed drainage shall be designed
to maintain the existing flow patterns. A private storm drain
maintenance agreement and private storm drain easements for
parcels 1 and 2 shall be approved by the Town and signed by both
property owners prior to acceptance of plans for building plan check.
Final drainage and grading shall be inspected by the Engineering
Department and any deficiencies corrected to the satisfaction of the
Engineering Department prior to final inspection.
11. Any, and all, changes to the existing grading and drainage plan
shall first be approved by the Town Engineering Department. No
grading shall take place during the grading moratorium between
November 1 and April 1 except with prior approval from the City
Planning Commission
April 26, 1995
Lands of Ward/parcel 1
Page 6
Engineer. No grading shall take place within ten feet of any
property line except to allow access to Francemont Drive.
12. 'An erosion and sediment control plan shall be submitted for review
and approval by the Engineering Department prior to acceptance of
plans for building plan check. All necessary erosion control and creek
protection measures shall be in place to the satisfaction of the
Engineering Department prior to issuance of any building permits. The
contractor and the property owner shall comply with all
appropriate requirements of the Town's NPDES permit relative to
grading and erosion/sediment control. Any areas on the site that
have the native soil disturbed shall be protected for erosion control
during the rainy season and shall be replanted prior to final
inspection.
13. All public utility services shall be undergrounded.
14. The location, elevation and height of the new residence, decking,
driveway and pool shall be certified in writing by a registered civil
engineer or licensed land surveyor as being in the locations,
elevations and heights approved by the Town and as shown on the
Site Development Plan.
15. ,The existing type IIB pathway on Francemont Drive and Moody
Road shall be rehabilitated and the driveway shall be roughened
where it intersects the pathway. This work shall be done to the
satisfaction of the Town Engineering Department prior to final
inspection. An additional pathway easement shall be granted to the
Town along the SCVWD maintenance road between Adobe Creek
and Moody Road. The applicant shall have the legal description
and plat exhibits prepared by a registered civil engineer or licensed
land surveyor and the Town shall prepare the grant document. The
applicant shall submit the signed and notarized document and
exhibits to the Town prior to acceptance of plans for building plan check.
16. All subdivision improvements for the Bellucci Subdivision (Parcel
Map No. 608 M 31, 32 & 33 and Tract Map No. 8207) and the
Francemont Subdivision (Parcel Map No. 606 M 14 & 15) shall be
'constructed and approved by the City Engineer prior to acceptance of
plans for building plan check.
17. A map revision, or other suitable method for amending the flood
insurance rate map, shall be obtained for this property prior to final
approval.
Planning Commission
April 26, 1995
Lands of Ward/parcel 1
Page 7
18. The Lambert Sanitary Sewer Reimbursement Agreement in the
amount of $2,046.56 shall be paid to the Town prior to acceptance of
plans for building plan check. The new residence shall connect to
sanitary sewer service prior to final approval.
19. All construction debris and other deleterious materials shall be
removed from the project site, to the satisfaction of the Engineering
Department,prior to acceptance of plans for building plan check.
20. This property (Parcel No. 1) shall be included in a landslide
maintenance agreement which sets forth maintenance and
monitoring responsibilities as well as any other requirements
deemed appropriate by the Town. This agreement shall be
approved by the Town and signed by the applicant and all
necessary property owners prior to acceptance of plans for building
plan check.
21. Santa Clara Valley Water District (SCVWD) has approved the
proposed improvements for this project per a letter from Richard
M. Anderson, dated December 20, 1994. All conditions of the
SCVWD permit shall also become conditions of this site
development permit. A copy of the permit issued by SCVWD shall
be submitted to the Town prior to acceptance of plans for building plan
check.
22. Upon completion of the construction, a final inspection shall be•
required to be set with the Planning and Engineering Departments
two weeks prior to final building inspection approval.
CONDITION NUMBERS 2, 4, 9, 10, 11, 13 17, 20, 21 AND 22 SHALL BE
COMPLETED AND SIGNED OFF BY THE PLANNING DIRECTOR AND
THE CITY ENGINEER PRIOR TO ACCEPTANCE OF CONSTRUCTION
PLANS FOR PLAN CHECK BY THE BUILDING DEPARTMENT.
EROSION CONTROL AND CREEK PROTECTION MEASURES SHALL BE
INSPECTED AND APPROVED BY THE ENGINEERING DEPARTMENT
PRIOR TO ISSUANCE OF BUILDING PERMITS.
Properties residing within the Los Altos School District boundaries must pay
School District fees before receiving their building permit from Los Altos
Hills. The applicant must take a copy of Worksheet #2 to both the elementary
and high school district offices, pay the appropriate fees and provide the Town
with a copy of their receipts.
William Cotton 330 Village Lane
• j Los Gatos, California 95030
and Associates (408) 354-5542
December 19, 1994
L3274
TO: Suzanne Davis .---
Plnner '-"- C E I
TOWN OF LOS ALTOS HILLS "
26379 Fremont Road
Los Altos Hills, California 94022 p E C 2, 11994
SUBJECT: Geologic and Geotechnical Review ���N OF LOS ALTOS
RE: Ward,Parcel 1 -Adobe Creek Subdivision
LLS
Francemont Drive
File #20-94-ZP-SD-GD
At your request, we have completed a geologic and geotechnical review of
applications for proposed site residential development using:
• Soil Report prepared by Nielsen Geotechnical, dated November •
16, 1994;
• Site Development Plans (Sheets Al, Cl, A2 and A3) prepared by
Woodson/Barksdale Architects and Giuliani & Kull, dated
November 17, 1994;
• Report on the Consultation for the Adobe Creek Subdivision,
prepared by Jo Crosby & Associates, dated February 2, 1993;
• Engineering Geologic Investigation (report) for Parcels 1, 2 and 3
Francemont Estates, prepared by Louis A. Richardson, dated July
31 1992; and
• Geotechnical Engineering Evaluation (report)prepared by William
McMorrow, dated August 20, 1992.
In addition,we have reviewed pertinent technical documents from our office files
(Adobe Creek Subdivision L1456 and Menlo Development L3292) and completed a
recent site reconnaissance.
DISCUSSION
The applicant proposes to construct a single family residence and swimming
pool in the central portion of Parcel 1 of the Adobe Creek Subdivision/Francemont
Estates. We pre iously reviewed a proposed development application for this parcel
(review reported dated September 17, 1992) and recommended that site development
not be approved until a scope of groundwater monitoring and remediation,necessary to
ensure the stability of the adjacent Dormant Landslide,was satisfactorily defined.
ENGINEERING GEOLOGY • ENVIRONMENTAL EARTH SCIENCES • FOUNDATION ENGINEERING
•
•
Suzanne Davis December 19, 1994
Page 2 L3274.
Our review report dated March 12, 1993 addressed details of a recommended
groundwater monitoring program and future dewatering measures that may need to be
implemented to ensure the stability of the adjacent landslide. We recommended that a
formal monitoring and mitigation program be established prior to issuance of grading or
building permits on individual lots. We understand that three groundwater monitoring
wells have been installed within the landslide.
SITE CONDITIONS
The subject property is generally characterized by gently sloping (2° to 6°
inclination) valley floor topography. Approximately 3 to 5 feet of recently placed fill is
present over most of the parcel. The referenced July 1992 report by Louis A. Richardson
concluded that fill at the property came from several different sources, was highly
variable in consistency, contained debris such as wood, concrete an old car parts, and
should not be considered an engineered unit. The referenced November 1994 soil report
by Nielsen Geotechnical concludes that the current fill on Parcels 1, 2 and 3 is well
compacted based on the results of 9 exploratory borings. Wood or other debris was not
encountered in these borings. It is our understanding,based on information provided by
John Nielsen (personal communication on December 12, 1994), that site fills have been
reworked by large grading equipment since 1992.
Site fill materials are underlain by deep unconsolidated alluvial deposits (gravel,
sand silt and clay). The July 1992 report by Louis Richardson concluded that
anticipated ground shaking could produce differential compaction of these underlying
deposits. The consultant also concluded that a portion of a large Dormant Landslide
underlies the southwestern corner of Parcel 1 (i.e., buried by fill and alluvium). The
potentially active trace of the Berrocal fault has been mapped approximately 400 feet
northeast of the subject property.
The referenced consultation report by Jo Crosby and Associates concludes that
the Dormant Landslide has the potential for renewed movement and the stability of this
feature is very sensitive to the level of groundwater. The consultant concludes that the
site is safe for development (i.e.,with respect to deep landsliding) if groundwater levels
do not rise above the lower building pad levels within the landslide mass. The
- consultant recommends that the three existing wells within the landslide be monitored
on a regular basis and dewatering measures be implemented to control the groundwater
if monitoring wells indicate rising water levels.
Current FEMA maps indicate that the property is located entirely within the
limits of the 100-year flood along the adjacent Adobe Creek. We have not received
documentation to verify what extent of channel improvement or additional fill at the
building pad (if any)may be required to address potential flooding hazards.
CONCLUSIONS AND RECOMMENDED ACTIONS
Proposed site development is constrained by potential landsliding, potential
flooding, undocumented fill, expansive soils, anticipated strong to violent seismic
shaking and the potential for seismically induced differential compaction of the
underlying alluvial deposits.
William Cotton and Associates
Suzanne Davis; December 19, 1994
Page 3 L3274
Based on our review of the latest project soil report by Nielsen Geotechnical, it
appears that existing fill conditions can be adequately addressed by current foundation
recommendations. The potential impacts of seismically induced differential compaction
should be specifically addressed by the current project geotechnical consultant. The
adequacy of foundation design recommendations must be re-evaluated if any creek
channel modifications, or placement of additional site fill, is needed to address flood
conditions. The applicant should be fully aware of the potential for cracking of asphalt
and concrete playing at this site as stated on page 14 of the referenced soil report by
Nielsen Geotechnical. Our current review does not include approval of specific
geotechnical design for the swimming pool. Design criteria for the pool should be
addressed after development of final site grading plans.
Any necessary improvements to the Adobe Creek channel should meet
requirements of the Santa Clara Valley Water District and be reviewed and approved by
them and the Town Engineer.
Formal organization of a groundwater monitoring and mitigation program should
be completed prior to issuance of building or grading permits. One of the two annual
well inspections for the Dormant Landslide should be completed in the months of
February or March when groundwater levels are likely to reach their high point. The
existing three monitoring wells within the landslide should be equipped with locking
caps and appropriate protective barriers to prevent accidental damage or vandalism to
the well heads.
If creek improvements do not encroach in a significant manner toward the house
site, then the proposed development plan appears feasible with the implementation of
appropriate engineering design measures. However, we recommend that the following
items be satisfactorily addressed prior to issuance of permits for residential
construction:
1. Flood Evaluation - Any necessary improvements to the Adobe Creek
channel,;or changes to the building pad elevation, should be reflected on
the grading plan for Parcel 1. The depth of fill and proximity of final
creekbanks to the house footprint may impact proposed residential
foundation design criteria. Channel improvements should meet
requirements of the Santa Clara Valley Water District and be reviewed
and app bowed by them and the Town Engineer.
2. Supplemental Geotechnical Evaluations - It is important that the
project 'geotechnical consultant be informed of any additional fill
requirements or encroachment of creekbanks toward the house site that
may result from required flood mitigation. After resolution of flooding
issues, the consultant should review any modifications to the site grading
plan an evaluate whether foundation design criteria adequately address
the proximity, and the potential for long-term instability, of local creek
banks. The issue of potential seismically induced differential
compaction, presented in the July 1992 report by Louis Richardson,
should also be addressed. Estimates of total and differential settlement
should be provided. The consultant should verify that proposed lot
gradient and drainage design reflect the intent of recommendations by Jo
Crosby and Associates (report of February 2, 1993) to reduce the
infiltration of surface water.
William Cotton and Associates
v"
Suzanne Davis December 19, 1994
L3274
Page 4
The results of these supplemental evaluations should be submitted to the
Town for review by the Town Geotechnical Consultant prior to issuance
of building or grading permits.
3. Formal Organization of Monitoring Program - The groundwater
monitoring program,descriptions of possible future mitigation measures,
drainage easements and property assessments for the Dormant Landslide
should be established to the satisfaction of the Town utilizing the
concepts outlined by Jo Crosby and Associates. In addition, we
recommend that one of the two annual well inspections be completed in
the months of February or March when relatively high groundwater
conditions may prevail. The monitoring program should be established
prior to issuance of grading or building permits for development on
individual lots. We suggest that the applicant install locking caps and
protective barriers as soon as possible at the existing three wells to reduce
the potential for damage.
We recommend that the Town geotechnical Consultant be provided an
opportunity to review specific requirements of'the proposed monitoring program prior to
implementation.
Respectfully submitted,
WILLIAM COTTON AND ASSOCIATES,INC.
TOWN GEOTECHNICAL CONSULTANT
Ted Sayre
Senior Engineering Geologist
CEG 1795
Patrick O. Shires
Principal Geotechnical Engineer
GE 770
POS:TS:rb
•
William Cotton and Associates
171 William C tho n 330 Village Lane ,:c.;"?,' .
Los Gatos, California 95030
and Associates (408) 354-5542
/t/ 3March 8, 1995
qS L3274
� Q 1 n L3284
r
01 NO fzOs A, L3304
os1//40
TO: Susan Manca
Planner
TOWN OF LOS ALTOS HILLS
26379 Fremont Road
Los Altos Hills, California 94022
SUBJECT: Supplemental Geologic and Geotechnical Review
RE: Ward, 202-94-ZP-SD-GD, Parcel 1
Ward, 203-94-ZP-SD-GD, Parcel 2
Ward, 205-94-ZP-SD-GD, Parcel 3
Adobe Creek Subdivision
Francemont Drive
At your request, we have completed supplemental geologic and geotechnical
reviews of the subject applications for proposed site residential development using:
• Supplemental Geotechnical Information (report) prepared by
Nielsen Geotechnical, dated February 13, 1995;
• Site Development Plans-Parcel 1 (Sheets Al, Cl, A2 and A3)
prepared by Woodson/Barksdale Architects and Giuliani & Kull,
dated November 17, 1994;
• Site Development Plans-Parcel 2 (Sheets Al, Cl, A2, A3 and A4)
prepared by Woodson/Barksdale Architects and Giuliani & Kull,
dated November 17, 1994;
• Site Development Plans-Parcel 3 (Sheets Al-A5, and C1)
prepared by Woodson/Barksdale Architects and Giuliani & Kull,
daied November 17, 1994;
• Report on the Consultation for the Adobe Creek Subdivision,
prepared by Jo Crosby & Associates, dated February 2, 1993; and
• Geotechnical Engineering Evaluation (report)prepared by William
McMorrow, dated August 20, 1992.
•
ENGINEERING GEOLOGY • ENVIRONMENTAL EARTH SCIENCES • FOUNDATION ENGINEERING
•
Susan Manca March 8, 1995
Page 2
In addition,we have reviewed pertinent technical documents from our office files
(Adobe Creek Subdivision L1456 and Menlo Development L3292) and completed a
recent site reconnaissance.
DISCUSSION
The applicant proposes to construct a single family residence and swimming
pool on each of the Parcels 1, 2 and 3 of the Adobe Creek Subdivision/Francemont
Estates. We previously reviewed proposed development applications for these parcels
(review reports dated December 19, 1994) and recommended that supplemental flood
evaluations, geotechnical evaluations and formal establishment of a groundwater
monitoring program be completed prior to issuance of grading or building permits on
individual lots. We currently understand that the Santa Clara Valley Water District is
not requiring additional improvements to the Adobe Creek channel to address potential
flooding issues.
The referenced consultation report by Jo Crosby and Associates concludes that
the Dormant Landslide extending into the southern portions of the three parcels has the
potential for renewed movement and the stability of this feature is very sensitive to the
level of groundwater in the hillslope. The consultant concludes that the site is safe for
development (i.e., with respect to deep landsliding) if groundwater levels do not rise
above the lower building pad levels within the landslide mass. The consultant
recommends that the three existing wells within the landslide be monitored on a regular
basis and dewatering measures be implemented to control the groundwater if monitoring
wells indicate rising water levels.
CONCLUSIONS AND RECOMMENDED ACTIONS
The request for supplemental geotechnical evaluations in our previous review
has been satisfactorily addressed by the referenced report by Nielsen Geotechnical.
However, formal organization of a groundwater monitoring and mitigation program
should be completed prior to issuance of building or grading permits. As a minimum,we
recommend that annual well inspections for the Dormant Landslide be completed in the
months of January and March/April when groundwater levels are likely increasing or
have reached their high point. A reading in January may point out the need for initiation
of dewatering before critical levels are reached later in the rain season. The existing three
monitoring wells within the landslide should be equipped with locking caps and
•
appropriate protective barriers to prevent accidental damage or vandalism to the well
heads.
We recommend geotechnical approval of the subject applications for proposed
construction on Parcels 1,2 and 3 with the following conditions:
1. Swimming Pool Design - Geotechnical design criteria for proposed
swimming pools should be updated, as necessary, after the project
geotechnical consultant has observed the drilling of foundation piers for
proposed residences. Design criteria for pool shells should be re-
evaluated if unanticipated adverse subsurface conditions are identified.
William Cotton and Associates
Susan Manca March 8, 1995
Page 3
The use of pressure-relief valves should be considered for all proposed
swimming pools. A letter from the project geotechnical consultant
addressing recommended pool design criteria should be submitted to the
Town for appropriate technical review prior to issuance of building
permits for pool construction.
2. Formal Organization of Monitoring Program - The groundwater
monitoring program, descriptions of possible future mitigation measures,
drainage easements and property assessments for the Dormant Landslide
should be established to the satisfaction of the Town utilizing the
concepts outlined by Jo Crosby and Associates. As a minimum, annual
well inspections for the Dormant Landslide should be completed in the
months of January and March/April. The monitoring program should be
established prior to issuance of grading or building permits for
development on individual lots. We suggest that the applicant install
locking caps and protective barriers as soon as possible at the existing
three wells to reduce the potential for damage.
We recommend that the Town Geotechnical Consultant be provided an
opportunity to review specific requirements of the proposed monitoring
program prior to implementation.
3. Parcel 3 Drainage .Improvements - As recommended by the project
geotechnical consultant, the two narrow unpaved access roads directly
south of Parcel 3 should be cleaned of forest debris and fine-graded so
that these roads serve as interceptor benches that direct runoff to
Francernont Drive (rather than onto Parcel 3). The consultant shall
confirm that these measures have been adequately completed prior to
final (as-built) approval of improvements on Parcel 3.
4. Geotechnical Plan Review - The applicant's geotechnical consultant
shall review and approve all geotechnical aspects of the detailed building
and grading plans (i.e., site preparation and grading, site drainage
improvements and design parameters for foundations and driveway) to
ensure that his recommendations have been properly incorporated.
The results of the plan review should be summarized by the geotechnical
consultant in a letter and submitted to the Town Engineer for review and
approval prior to issuance of building permits for residential construction
on individual parcels.
5. Geotechnical Field Inspection - The geotechnical consultant shall
inspect, test (as needed), and approve all geotechnical aspects of the
project construction. The inspections should include, but not necessarily
be limited to: site preparation and grading, site surface and subsurface
drainage improvements, and excavations for foundations and retaining
walls prior to the placement of steel and concrete. The consultant shall
inspect the drilling of a representative number of foundation piers on
each lot and document the materials encountered. The final depths of all
piers should be documented. This data should be included in the final
as-built inspection report.
William Cotton and Associates
Susan Manca March 8, 1995
Page 4
The results of these inspections and the as-built conditions of the project
shall be described by the geotechnical consultant in a report and
submitted to the Town Engineer for review prior to final (as-built) project
approval.
Respectfully submitted,
WILLIAM COTTON AND ASSOCIATES,INC.
TOWN GEOTECHNICAL CONSULTANT
Clec`(2,4-It—
Ted Sayre
Senior Engineering Geologist
WL147N•CAM-,
William R. Cotton
Principal Engineering Geologist
CEG 882
WRC:TS:rb
William Cotton and Associates
Santa CloraValley Water District 6
�• k 1-4-1-"A4- 1-P- 0-61D 5750 ALMADEN EXPRESSWAY
1C3r<IZCR SAN JOSE, CA 95118.3686
TELEPHONE (408)265-2600
FACSIMILE (408)266-0271
P-AbcLteA`At- -k-V -CE
408)266-0271
L( AN AFFIRMATIVE ACTION EMPLOYER
December 20, 1994 RECEIVED
DEC 211994
Ms. Susan Roberts TOWN OF LOS ALTOS KILLS
Giuliani c Kull, Incorporated
20431 Stevens Creek Boulevard, Suite 230
Cupertino, CA 95014
00,
Dear Ms.. Roberts: 1
The District has reviewed the improvement plans for the development of two parcels( Ns 351-
37-009 ald 0 0), located south of Moody Road and west of Francemont Drive, received by us
on December 15, 1994.
The proposed construction is acceptable to the District. We will need final plans for issuance of
a permit.
Two sets of final improvement plans should be sent for our review and issuance of a permit prior
to the start of construction.
Any questions may be referred to me at (408) 265-2607, extension 2319.
Sincerely,
1R;Lv&I'd bte•0,4/
Richard M. Anderson
Assistant Engineer
Design Coordination Division
' Town of Los Altos Hills
1/2 5/9 5
To: Planning Commission & Staff
From: Les Earnest, Pathways Committee Chair
Subject: Pathway requests
12800 Clausen Court; Lands of Jabbour: Restore 11-B path along
Voorhees Drive and Clausen Court if damaged during construction.
27781 Edgerton Road; Lands of Shockley: No request.
Parcel 1, Francemont Drive; Lands of Ward: Construct II-B path along
Franceinont Drive and Moody Road.
Parcel 2, Francemont Drive; Lands of Ward: Regrade the old lodge
entrance road so that it drains into Adobe Creek instead of forming a
pond. Provide a native path easement over that route, next to Adobe
Creek. Construct II=B path along the rest of the Moody Road frontage.
Parcel 3, Francemont Drive; Lands of Ward: Construct II-B path along
Francemont. To the extent that it lies within the property, provide a 12
foot easement for the existing path from the end of Francemont
diagonally uphill to join the dirt road that loops through the back of the
lot. Pathway easements should continue in both directions on thas road.
If it is to be a fire road, as seems sensible, a wider easement woui.d be
appropriate for this segment.
13981 Fremont Pines Lane; Lands of Abramo: Construct Il-B path along
Fremont Road and Fremont Pines Lane.
26370 Ginny Lane; Lands of Hong: No request
27935 Roble Blanco; Lands of Noghrey: No request.
26010 Torello Lane; Lands of Zatparvar: Construct Il-B path and adjacent
drainage ditch along Fremont Road.
Note: where construction or upgrading of paths to the 11-13 standard is
recommended, this is to include irrigation at least 5 feet away from path
and a non-slip surface on any crossing driveways. Where there is "no
request:" we recommend that in lieu fees be collected where possi,ale.