HomeMy WebLinkAbout4.5 TOWN OF Los ALTOS HILLS April 26, 1995
Staff Report to the Planning Commission
RE: SITE DEVELOPMENT PERMIT FOR A NEW RESIDENCE AND
POOL;LANDS OF WARD; 11881 FRANCEMONT DRIVE.
FROM: Suzanne Davis, Planner SD
RECOMMENDATION That the Planning Commission:
Approve the requested Site Development Permit as submitted, subject to the
attached conditions of approval. •
BACKGROUND
The subject property is parcel 3 of the Bellucci Subdivision (Francemont Estates).
The lot is located on west side of Francemont Drive. The area closest to the street
is relatively flat,while the rest of the land slopes up,with some areas exceeding
55%. The house and pool will be constructed on the lower part of the lot.
There are a number of subdivision improvements which have not yet been
completed. While the applicant can receive approval of the proposed projects
(new residences and pools are also proposed on parcels 1 and 2),no building
permits can be issued until the required improvements are completed to the
satisfaction of the Town Engineering Department (see condition#17).
DISCUSSION
Site Data:
Net Lot Area: 1.62 acres
Average Slope: 20.9%
Lot Unit Factor: 1.24
Floor Area and Development Area:
Area Max. Prop. Exist. Incrs. Left
Devel. 13,531 10,204 -0- 10,204 +3,327 .
Floor 6,764 5,864 -0- 5,864 +900
The applicant is requestingapproval of a two-story residence and a swimming
pool. The second story will cover just under 40% of the first floor. The second
floor has been set back, and the architectural features include variations in
elevations, roof planes and exterior building massing.
Planning Commission
April 26, 1995
Lands of Ward/parcel 3
Page 2
The size of the second story includes an additional 154 square feet which is
counted because there is a first floor space which exceeds 17 feet (areas where the
floor to ceiling height exceed 17 feet are counted twice). The maximum height of
the house will be 26 feet as measured from the natural grade. Exterior materials
will consist of stucco siding,wood windows and doors and tile roofing with four
small skyligllts. A portion of the second story has built up membrane roofing.
The proposed project will leave 900 square feet of MFA and over 3,300 square
feet of development area for future additions or improvements.
Three of the required parking spaces are provided in the attached three-car
garage,with a fourth space adjacent to the garage. The garage has been
staggered and the uncovered parking space has been offset from the garage so
that the fourspaces are not in a single row. There is a portion of the driveway in
the front setback near the entry to the proposed residence. This paving within
the setback is not needed for turnaround or maneuvering of vehicles,but it will
provide additional on-site parking.
There are some Oaks on the site,but they are not within the proposed
construction area. The Oaks and other existing trees will be maintained. There is
a conceptual landscape plan included with the development plans to show
proposed plantings for screening of the new residence and pool. The final
landscape plan will be reviewed by the Site Development Committee once the
house is framed.
The Engineering Department has reviewed the plans and has recommended
conditions of approval as specified in Attachment 1. This property also has some
fill since part of the lot is within the 100 year flood plain. The elevations show
the original grades prior to the fill being placed on the site, and the finished
grade. Grading volumes for the project total 510 cubic yards (50 cu. yds. of cut
and 460 cu. yids. of fill). The excess 410 cubic yards of fill will need to be
imported tcYthe site. Some fill will be available from the excess cut on parcel 1,
but it appears that it will be necessary to bring in additional fill to complete the
grading.
The Town Geologist has reviewed the plans and geotechnical reports and has
visited the site. The Town Geologist has recommended approval of the project
subject to conditions (see Attachment 3). The Fire Department had no
recommendations.
The Pathway Committee recommends that a type IIB path be constructed along
Francemont Drive. This will be done as part of the subdivision improvements, so
the condition of approval requires the applicant to rehabilitate the path as
needed (see condition#16).
Planning Commission
April 26, 1995
Lands of Ward/parcel 3
Page 3
The project as proposed meets the requirements of the Zoning and Site
Development Ordinances, and staff is recommending approval. Staff is available
to answer any questions that the Commission or community may have.
ATTACHMENTS:
1. Recommended conditions of approval
2. Letter from William Cotton &Associates dated December 19, 1994 (four
pages)
3. Letter from William Cotton &Associates dated March 8, 1995 (four pages)
4. Pathways Committee recommendation dated January 25, 1995 (one page)
5. Revised development plans: topographic survey, site plan, elevations, floor
plans,roof plan and conceptual landscape plan (five sheets)
cc: Jim Ward &Associates
99 El Camino Real
Menlo Park, CA 94027
The WB Group
4151 Middlefield Road, Suite 115
Palo Alto,CA 94303-4743
Tom Scherer Architect
413 Capitola Avenue
Capitola, CA 95010
Planning Commission
April 26, 1995
Lands of Ward/parcel 3
Page 4
ATTACHMENT 1
RECOMMENDED CONDITIONS FOR SITE DEVELOPMENT PERMIT
FOR NEW RESIDENCE AND POOL
LANDS OF WARD - 11881 FRANCEMONT DRIVE
A. PLANNING DEPARTMENT:
1. Any changes or modifications to the approved plans shall be
approved by the Planning Director or the Planning Commission,
depending upon the scope of the changes.
2. The property owner shall inform the Town of any damage and
shall repair any damage caused by the construction of the project to
pathways, private driveways, public and private roadways prior to
final inspection and release of occupancy permits and shall provide
the Town with photographs of the existing conditions of the
roadways and pathways prior to acceptance of plans for building plan
check.
3. Prior to final inspection the final landscape planting plan shall be
submitted for approval by the Site Development Committee. The
Site Development Committee may require a deposit, a landscape
maintenance agreement, or other security to assure that the
Shall
landscape is planted and maintained. Outdoor lighting
shall be reviewed with the landscape plan.
4. Two copies of a grading and construction operation plan shall be
submitted by the property owner for review and approval by the
City Engineer and Planning Director prior to submittal of plans for
building plan check. The grading/construction operation plan shall
address truck traffic issues regarding dust, noise, and vehicular and
Pedestrian traffic safety on Francemont Drive, Moody Road and
'surrounding roadways; storage of construction materials;
Placement of sanitary facilities; parking for construction vehicles;
and parking for construction personnel. A debris box (trash
dumpster) shall be placed on site for collection of construction
debris. Arrangements must be made with the Los Altos Garbage
Company for the debris box, since they have a franchise with the
Town and no other hauler is allowed within the Town limits.
5. Skylights shall be designed and constructed to reduce emitted light.
No lighting may be placed within the skylight wells.
Planning Commission
April 26, 1995
Lands of Ward/parcel 3
Page 5
6. Paint color shall be chosen by the applicant and approved by staff
in conformance with the Town's adopted color board. A color
sample shall be submitted to the Planning Director for approval
prior to painting the exterior of the residence.
7. Fire retardant roofing is required for the residence.
8. Standard swimming pool requirements:
a. Lights shall be designed so that the source is not visible from
off-site.
b. Drainage outfall structures shall be constructed and located to
the satisfaction of the Town Engineering Inspector.
c. Fencing or a locking pool cover is recommended for safety.
d. Equipment shall be enclosed on all four sides and roofed for
noise mitigation.
9. Prior to beginning any grading operation or construction, any
significant trees in the area of construction are to be fenced at the
dripline. The fencing shall be of a material and structure to clearly
delineate the dripline. Town staff must inspect the fencing and the
trees to be fenced prior to issuance of any building permits. The fence
must remain throughout the course of construction. No storage of
equipment,vehicles or debris shall be allowed within the driplines
of these trees.
B. ENGINEERING DEPARTMENT:
10. All conditions recommended by William Cotton & Associates'
report dated March 8, 1995, are conditions of this permit. A letter
of compliance prepared by the geotechnical consultant (regarding
the construction plans) shall be submitted .to the Town prior to
acceptance of plans for building plan check. The Town Geologist shall
review and comment on the proposed ground water monitoring
program prior to implementation.
11. The site drainage associated with the proposed development must
be designed assurface flow wherever possible to avoid
concentration of runoff. The proposed drainage shall be designed
to maintain the existing flow patterns. Final drainage and grading
shall be inspected by the Engineering Department and any
deficiencies corrected to the satisfaction of the Engineering
Department prior to final inspection.
Planning Commission
April 26, 1995
Lands of Ward/ parcel 3
Page 6
12. Any, and all, changes to the existing grading and drainage plan
shall first be approved by the Town Engineering Department. No
grading shall take place during the grading moratorium between
November 1 and April 1 except with prior approval from the City
Engineer. No grading shall take place within ten feet of any
property line except to allow access to Francemont Drive.
13. An erosion and sediment control plan shall be submitted for review
and approval by the Engineering Department prior to acceptance of
plans for building plan check. The contractor and the property owner
shall comply with all appropriate requirements of the Town's
NPDES permit relative to grading and erosion/sediment control.
Any areas on the site that have the native soil disturbed shall be
protected for erosion control during the rainy season and shall be
replanted prior to final inspection.
14. All public utility services shall be undergrounded.
15. The location, elevation and height of the new residence, decking,
driveway and pool shall be certified in writing by a registered civil
e1ngineer or licensed land surveyor as being in the locations,
elevations and heights approved by the Town and as shown on the
Site Development Plan.
16. The existing type IIB pathway on Francemont Drive shall be
rehabilitated and the driveway shall be roughened where it
intersects the pathway. This work shall be done to the satisfaction
of the Town Engineering Department prior to final inspection. An
additional 10 foot wide pathway easement shall be granted.,to the
Town over the portion of the property where the jeep path is
located, to the satisfaction of the City Engineer. The applicant shall
hlave the legal description and plat exhibits prepared by a
registered civil engineer or licensed land surveyor and the Town
shall prepare the grant document. The applicant shall submit the
signed and notarized document and exhibits to the Town prior to
acceptance of plans for building plan check.
17. All subdivision improvements for the Bellucci Subdivision (Parcel
Map No. 608 M 31, 32 & 33 and Tract Map No. 8207) and the
Fri ancemont Subdivision (Parcel Map No. 606 M 14 & 15) shall be
constructed and approved by the City Engineer prior to acceptance of
plans for building plan check.
• Planning Commission
April 26, 1995
Lands of Ward/parcel 3
Page 7
18. A map revision, or other suitablemethod for amending the flood
insurance rate map, shall be obtained for this property prior to final
approval.
19. The Lambert Sanitary Sewer Reimbursement Agreement in the
amount of $2,046.56 shall be paid to the Town prior to acceptance of
plans for building plan check. The new residence shall connect to
sanitary sewer service prior to final approval.
20. This property (Parcel No. 3) shall be included in a landslide
maintenance agreement which sets forth maintenance and
monitoring responsibilities as well as any other requirements
deemed appropriate by the Town. This agreement shall be
approved by the Town and signed by the applicant and all
necessary property owners prior to acceptance of plans for building
plan check.
21. Upon completion of the construction, a final inspection shall be
required to be set with the Planning and Engineering Departments
two weeks prior to final building inspection approval.
CONDITION NUMBERS 2, 4, 10, 13, 16 17, 19 AND 20 SHALL BE
COMPLETED AND SIGNED OFF BY THE PLANNING DIRECTOR AND
THE CITY ENGINEER PRIOR TO ACCEPTANCE OF CONSTRUCTION
PLANS FOR PLAN CHECK BY THE BUILDING DEPARTMENT.
PROTECTIVE TREE FENCING SHALL BE INSPECTED AND APPROVED
BY THE PLANNING DEPARTMENT PRIOR TO ISSUANCE OF BUILDING
PERMITS.
Properties residing within the Los Altos School District-boundaries must pay
School District fees before receiving their building permit from Los Altos
Hills. The applicant must take a copy of Worksheet#2 to both the elementary
and high school district offices, pay the appropriate fees and provide the Town
with a copy of their receipts.
NOTE: The Site Development permit is valid for one year from the approval
date (until April 26, 1996). All required building permits must be obtained
within that year and work on items not requiring a building permit shall be
commenced within one year and completed within two years.
-William Cotton uSuLYYtl..
- '�M/ iam 330 Village Lane
Los Gatos, California 95030
and Associates (408) 354-5542
December 19, 1994
L3304
TO: Suzanne Davis '
Planner` ?
TOWN OF LOS ALTOS HILLS
26379 Fremont Roadalca
Los Altos Hills, California 94022
SUBJECT: Geologic and Geotechnical Review
RE: Ward,Parcel 3- Adobe Creek Subdivision
Francemont Drive
File #205-94-ZP-SD-GD
At your request, we have completed a geologic and geotechnical review of
applications for proposed site residential development using:
• S'oi1 Report prepared by Nielsen Geotechnical, dated November
16, 1994;
• Site Development Plans (Sheets A1-A5, and C1) prepared by
Woodson/Barksdale Architects and Giuliani & Kull, dated
November 17, 1994;
• - Report on the Consultation for the Adobe Creek Subdivision,
prepared by Jo Crosby & Associates, dated February 2, 1993;
• Engineering Geologic Investigation (report) for Parcels 1, 2 and 3
Francemont Estates, prepared by Louis A. Richardson, dated July
31, 1992; and
• Geotechnical Engineering Evaluation (report)prepared by William
McMorrow, dated August 20, 1992.
In addition,we have reviewed pertinent technical documents from our office files
(Adobe Creek Subdivision L1456 and Menlo Development L3313) and completed a
recent site reconnaissance.
DISCUSSION
The applicant proposes to construct a single family residence and swimming
pool in the central portion of Parcel 3 of the Adobe Creek Subdivision/Francemont
Estates. The southern edge of the house is located immediately adjacent to the toe of a
large Dormant Landslide. We previously reviewed a proposed development application
for this parcel (review report dated July 7, 1993) and recommended that a formal
groundwater monitoring and mitigation program be established prior to issuance of
building or grading permits.
ENGINEERING GEOLOGY • ENVIRONMENTAL EARTH SCIENCES • FOUNDATION ENGINEERING
Suzanne Davis December 19, 1994
Page 2 L3304
Our Adobe Creek Subdivision review report dated March 12, 1993 addressed
details of a recommended groundwater monitoring program, and future dewatering
measures that may need to be implemented to ensure the stability of the Dormant
Landslide. We recommended that a formal monitoring and mitigation program be
established prior to issuance of grading or building permits on individual lots. We
understand that_threegroundwater monitoring wells have been installed within the
landslide.
SITE CONDITIONS
The subject property is generally characterized by gentle to very steep (1° to 35°
inclination) northeast-facing hillside and valley floor topography. Approximately 3 to 5
feet of recently placed fill is present over most of the proposed building site. The
referenced July 1992 report by Louis A. Richardson concluded that fill at the property
came from several different sources,was highly variable in consistency,contained debris
such as wood, concrete an old car parts, and should not be considered an engineered
unit. The referenced November 1994 soil report by Nielsen Geotechnical concludes that
the current fill on Parcels 1, 2 and 3 is well compacted based on the results of 9
exploratory borings. Wood or other debris was not encountered in these borings. It is
our understanding, based on information provided by. John Nielsen (personal
communication on December 12, 1994), that site fills have been reworked by large
grading equipment since 1992.
Site fill materials at the building site are underlain by deep unconsolidated
alluvial deposits (gravel, sand silt and clay). The July 1992 report by Louis Richardson
concluded that anticipated ground shaking could produce differential compaction of
these underlying deposits. A portion of a large Dormant Landslide is located in the
western half of the property. The western portion of the property is generally
characterized by steep (i.e., 15° to 25° inclination),northeast-facing slopes. Past grading
in this area has resulted in several unpaved access roadways and a somewhat level pad
area in the southwestern corner of the property. Cut and fill slopes associated with the
grading are inclined from 8° to 38°. Portions of the roadways direct runoff toward the
proposed development. Drainage from the remaining portions of the property is
characterized by uncontrolled sheet flow to the northeast. The potentially active trace
of the Berrocal fault has been mapped approximately 400 feet northeast of the subject
property.
The referenced consultation report by Jo Crosby and Associates concludes that
the Dormant Landslide has the potential for renewed movement and the stability of this
feature is very sensitive to the level of groundwater. The consultant concludes that the
site is safe for development (i.e., with respect to deep landsliding) if groundwater levels
do not rise above the elevation of the lower building pad levels within the landslide
mass.
Current FEMA maps indicate that the building site is located within the limits of
the 100-year flood along the nearby Adobe Creek. We have not received documentation
to verify what extent of channel improvement or additional fill at the building pad (if
any) may be required to address potential flooding hazards.
William Cotton and Associates
Suzanne Davis December 19, 1994
Page 3 L3304
CONCLUSIONS AND RECOMMENDED ACTIONS
Proposed site development is constrained by potential landsliding, potential
flooding, undocumented fill, expansive soils, anticipated strong to violent seismic
shaking and the potential for seismically induced differential compaction of the
underlying alluvial deposits.
Based on our review of the latest project soil report by Nielsen Geotechnical, it
appears that exiting fill conditions can be adequately addressed by current foundation
recommendations. The potential impacts of seismically induced differential compaction
should be specifically addressed by the current project geotechnical consultant. In
addition, the consultant should evaluate any adverse impacts that abandoned access
roads or steep graded areas, located upslope of the house site, may present to the
proposed development. The adequacy of foundation design recommendations must be
re-evaluated if any additional site fill is needed to mitigate flood conditions. _The
applicant should be fully aware of the potential for cracking of asphalt and concrete
paving at this site as stated on page 14 of the referenced soil report by Nielsen
Geotechnical. Our current review does not include approval of specific geotechnical
design for the swimming pool. Design criteria for the pool should be addressed after
development of final site grading plans.
Formal organization of a groundwater monitoring and mitigation program should
be completed prior to issuance of building or grading permits. One of the two annual
well inspections for the Dormant Landslide should be completed in the months of
February or March when groundwater levels are likely to reach their high point. The
existing three monitoring wells within the landslide should be equipped with locking
caps and appropriate protective barriers to prevent accidental damage or vandalism to
the well heads.
The proposed development plan appears feasible with the implementation of
appropriate engineering design measures. However,we recommend that the following
items be satisfactorily addressed prior to issuance of permits for residential
construction:
1. Supplemental Geotechnical Evaluations - It is important that the project
geotechnical consultant (Nielson Geotechnical)be informed of any additional
fill requirements at the house site that may result from required flood
mitigation. After resolution of flooding issues, the consultant should review
any modifications to the site grading plan and evaluate whether previously
recommended foundation design criteria are still appropriate. The issues of
potential seismically induced differential compaction, presented in the July
1992 report by Louis Richardson, should also be addressed. Estimates of
total and differential settlement should be provided. The consultant should
verify that proposed lot gradients and drainage design reflect the intent of
recommendations by Jo Crosby and Associates (report of February 2, 1993)
to reduce the infiltration of surface water. In addition, the consultant should
evaluate any adverse impacts that abandoned access roads or steep graded
slopes, located south and southwest of the house site, may present to the
proposed development. Appropriate mitigation measures should be
recommended if deemed necessary.
William Cotton and Associates
Suzanne Davis December 19, 1994
Page 4 L3304
The results of these supplemental evaluations should be submitted to the
Town for review by the Town Geotechnical Consultant prior to issuance of
building or grading permits.
2. Formal Organization of Monitoring Program-The groundwater monitoring
program, descriptions of possible future mitigation measures, drainage
easements and property assessments for the Dormant Landslide should be
established to the satisfaction of the Town utilizing the concepts outlined by
Jo Crosby and Associates. In addition, we recommend that one of the two
annual well inspections be completed in the months of February or March
when relatively high groundwater conditions may prevail. The monitoring
program should be established prior to issuance of grading or building
permits for development on individual lots. We suggest that the applicant
install locking caps and protective barriers as soon as possible at the existing
three wells to reduce the potential for damage.
We recommend that the Town geotechnical Consultant be provided an
opportunity to review specific requirements of the proposed monitoring program prior to
implementation.
Respectfully submitted,
WILLIAM COTTON AND ASSOCIATES,INC.
TOWN GEOTECHNICAL CONSULTANT
Ted Sayre
Senior Engineering Geologist
CEG 1795
Patrick O. Shires
Principal Geotechnical Engineer
GE 770
POS:TS:rb
•
William Cotton and Associates
'`1illiam Cotton 330 Village Lane
VH VH Los Gatos, California 95030
, and Associates (408) 354-5542
i' ^ 6n/rearch 8, 1995
L3274
�A' 1Q �9 L3284
TowNofLos� 95 L3304
TO811
440
TO: Susan Manca
Planner
TOWN OF LOS ALTOS HILLS
26379 Fremont Road
Los Altos Hills, California 94022
SUBJECT: Supplemental Geologic and Geotechnical Review
RE: Ward, 202-94-ZP-SD-GD, Parcel 1
Ward, 203-94-ZP-SD-GD, Parcel 2
Ward, 205-94-ZP-SD-GD, Parcel 3
Adobe Creek Subdivision
Francemont Drive
At your request, we have completed supplemental geologic and geotechnical
reviews of the subject applications for proposed site residential development using:
• Supplemental Geotechnical Information (report) prepared by
Nielsen Geotechnical, dated February 13, 1995;
• Site Development Plans-Parcel 1 (Sheets Al, Cl, A2 and A3)
prepared by Woodson/Barksdale Architects and Giuliani & Kull,
dated November 17, 1994;
• Site Development Plans-Parcel 2 (Sheets Al, Cl, A2, A3'and A4)
prepared by Woodson/Barksdale Architects and Giuliani & Kull,
dated November 17, 1994;
•
• Site Development Plans-Parcel 3 (Sheets A1-A5, and C1)
prepared by Woodson/Barksdale Architects and Giuliani & Kull,
dated November 17, 1994;
• Report on the Consultation for the Adobe Creek Subdivision,
prepared by Jo Crosby & Associates, dated February 2, 1993; and
• Geotechnical Engineering Evaluation (report)prepared by William
McMorrow, dated August 20, 1992.
•
ENGINEERING GEOLOGY • ENVIRONMENTAL EARTH SCIENCES • FOUNDATION ENGINEERING
Susan Manca March 8, 1995
Page 2
In addition,we have reviewed pertinent technical documents from our office files
(Adobe Creek Subdivision L1456 and Menlo Development L3292) and completed a
recent site reconnaissance.
DISCUSSION
The applicant proposes to construct a single family residence and swimming
pool on each of the Parcels 1, 2 and 3 of the Adobe Creek Subdivision/Francemont
Estates. We previously reviewed proposed development applications for these parcels
(review reports dated December 19, 1994) and recommended that supplemental flood
evaluations, geotechnical evaluations and formal establishment of a groundwater
monitoring program be completed prior to issuance of grading or building permits on
individual lots. We currently understand that the Santa Clara Valley Water District is
not requiring additional improvements to the Adobe Creek channel to address potential
flooding issues.
The referenced consultation report by Jo Crosby and Associates concludes that
the Dormant Landslide extending into the southern portions of the three parcels has the
potential for renewed movement and the stability of thisfeature is very sensitive to the
level of groundwater in the hillslope. The consultant concludes that the site is safe for
development (i.e., with respect to deep landsliding) if groundwater levels do not rise
above the lower building pad levels within the landslide mass. The consultant
recommends that the three existing wells within the landslide be monitored on a regular
basis and dewatering measures be implemented to control the groundwater if monitoring
wells indicate rising water levels.
CONCLUSIONS AND RECOMMENDED ACTIONS
The request for supplemental geotechnical evaluations in our previous review
has been satisfactorily addressed by the referenced report by Nielsen Geotechnical.
However, formal organization of a groundwater monitoring and mitigation program
should be completed prior to issuance of building or grading permits. As a minimum,we
recommend thatannual well inspections for the Dormant_,Landslide be completed in the
months.of January and March/April when groundwater levels are likely increasing or
have reached their high point. A reading in January may point out the need for initiation
of dewatering before critical levels are reached later in the rain season. The existing three
monitoring wells within the landslide should be equipped with locking caps and
appropriate protective barriers to prevent accidental damage or vandalism to the well
heads.
We recommend geotechnical approval of the subject applications for proposed
construction on Parcels 1,2 and 3 with the following conditions:
1. Swimming Pool Design - Geotechnical design criteria for proposed
swimming pools should be updated, as necessary, after the project
geotechnical consultant has observed the drilling of foundation piers for
proposed residences. Design criteria for pool shells should be re-
evaluated if unanticipated adverse subsurface conditions are identified.
William Cotton and Associates
Susan Manca March 8, 1995
Page 3
The use of pressure-relief valves should be considered for all proposed
swimming pools. A letter from the project geotechnical consultant
addressing recommended pool design criteria should be submitted to the
Town for appropriate technical review prior to issuance of building
permits for pool construction.
2. Formal Organization of Monitoring Program - The groundwater
monitoring program, descriptions of possible future mitigation measures,
drainage easements and property assessments for the Dormant Landslide
should be established to the satisfaction of the Town utilizing the
concepts outlined by Jo Crosby and Associates. As a minimum, annual
well inspections for the Dormant Landslide should be completed in the
months of January and March/April. The monitoring program should be
established prior to issuance of grading or building permits for
development on individual lots. We suggest that the applicant install
locking caps and protective barriers as soon as possible at the existing
three wells to reduce the potential for damage.
We recommend that the Town Geotechnical Consultant be provided an
opportunity to review specific requirements of the proposed monitoring
program prior to implementation.
3. Parcel 3 Drainage Improvements - As recommended by the project
geotechnical consultant, the two narrow unpaved access roads directly
south of Parcel 3 should be cleaned of forest debris and fine-graded so
that these roads serve as interceptor benches that direct runoff to
Francemont Drive (rather than onto Parcel 3). The consultant shall
confirm that these measures have been adequately completed prior to
final (as-built) approval of improvements on Parcel 3.
4. Geotechnical Plan Review - The applicant's geotechnical consultant
shall review and approve all geotechnical aspects of the detailed building
and grading plans (i.e., site preparation and grading, site drainage
improvements and design parameters for foundations and driveway) to
ensure that his recommendations have been properly incorporated.
The results of the plan review should be summarized by the geotechnical
consultant in a letter and submitted to the Town Engineer for review and
approval prior to issuance of building permits for residential construction
on individual parcels.
5. Geotechnical Field Inspection - The geotechnical consultant shall
inspect, test (as needed), and approve all geotechnical aspects of the
project construction. The inspections should include, but not necessarily
be limited to: site preparation and grading, site surface and subsurface
drainage improvements, and excavations for foundations and retaining
walls prior to the placement of steel and concrete. The consultant shall
inspect the drilling of a representative number of foundation piers on
each lot and document the materials encountered. The final depths of all
piers should be documented. This data should be included in the final
as-built inspection report.
•
William Cotton and Associates
Susan Manca March 8, 1995
Page 4
The results of these inspections and the as-built conditions of the project
shall be described by the geotechnical consultant in a report and
submitted to the Town Engineer for review prior to final (as-built) project
approval.
Respectfully submitted,
WILLIAM COTTON AND ASSOCIATES, INC.
TOWN GEOTECHNICAL CONSULTANT
Ted Sayre
Senior Engineering Geologist
William R. Cotton
Principal Engineering Geologist
CEG 882
WRC:TS:rb
•
William Cotton and Associates
•
Town of Los Altos Hills
1/2 5/9 5
To: Planning g Commission & Staff
From: Les Earnest, Pathways Committee Chair
Subject: Pathway requests
12800 Clausen Court; Lands of Jabbour: Restore II-B path along
Voorhees Drivel and Clausen Court if damaged during construction.
27781 Edgerton Road; Lands of Shockley: No request.
Parcel 1, Francemont Drive; Lands of Ward: Construct II-B path along
Francemont Drive and Moody Road.
Parcel 2, Francemont Drive; Lands of Ward: Regrade the old lodge
entrance road so that it drains into Adobe Creek instead of forming a
pond. Provide a native path easement over that route, next to Adobe
Creek. Construct II-B path along the rest of the Moody Road frontage.
Parcel 3, Francemont Drive; Lands of Ward: Construct II-B path along
Francemont. To the extent that it lies within the property, provide a 12
foot easement for the existing path from the end of Francemont
diagonally uphill to join the dirt road that loops through the back of the
lot. Pathway easements should continue in both directions on this road.
If it is to be a fire road, as seems sensible, a wider easement would be
appropriate for this segment.
13981 Fremont Pines Lane; Lands of Abramo: Construct II-B path along
Fremont Road and Fremont Pines Lane.
26370 Ginny Lane; Lands of Hong: No request
27935 Roble Bllanco; Lands of Noghrey: No request.
26010 Torello Lane; Lands of Zatparvar: Construct II-B path and adjacent
drainage ditch along Fremont Road.
Note: where construction or upgrading of paths to the 11-B standard is
recommended, this is to include irrigation at least 5 feet away from path
and a non-slip surface on any crossing driveways. Where there is "no
request" we recommend that in lieu fees be collected where possible.