TOWN OF Los ALTOS HILLS June 5, 1995
Staff Report to the Planning Commission
RE: SITE DEVELOPMENT PERMIT FOR A NEW RESIDENCE;LANDS
OF KAWASAKI;27078 FREMONT ROAD. . ,
FROM: Suzanne Davis,Planner cb
RECOMMENDATION That the Planning Commission: -
Approve the requested Site.Development Permit as,submitted, subject to the
attached conditions of approval.
BACKGROUND
The subject property is located on the east side of Fremont Road three lots south
of Old Trace Lane. The property was created as part of an eight lot subdivision
(Tract 7482 -Featherhill Farms)recorded in April 1984. The map includes a
provision requiring.a type II(step on contour) foundation. There is a 10 foot
wide utility and pathway easement along the frontage of the property.
DISCUSSION
Site Data:
Net Lot Area: 1.10 acres
Average Slope: 13.7%
Lot Unit Factor: 1.01
Floor Area and Development Area:
Area Max. Prop. Exist. Incrs. Left
Devel. 13,749 7,875 -0- 7,875 +5,874
Floor 5,873 3,570 -0- 3,570 +2,303
The applicants are requesting approval of a single story residence. The
maximum height of the housewill be 16 feet as measured from the existing
grade. The house will be stepped to fit the contours, and the height as measured
from lowest to highest point will be about 18 feet. Exterior materials will consist
of medium stucco siding and chimney, metal or vinyl clad windows and flat tile
roofing (either clay or concrete tile). Proposed colors are included on the plans
(see sheet 3 of attachment 4). There are two small skylights planned.
•
Planning Commission
June 5, 1995
Lands of f Kawasaki
Page 2
The four required on-site p:rking spaces are provided in the driveway. Staff
recommends that the drive ay be modified to allow four cars to park while
providing a functional bac up area. While the present design would allow four
cars to be parked without e croaching into the setbacks, there would not be
adequate backup area if fo vehicles were parked at the same time. The
applicants plan to build a g:rage in the future. Until the garage is built,four
uncovered spaces will need to be maintained. Since the applicants may wish to
remove an area of the drive ay once an equivalent nitimber of spaces are
provided in a garage or ca ort,the additional parking area could be done with a
material such las gravel or ushed fines. These materials would be less costly to
install and easier to remove A condition of approval has been induded
requiring the driveway to b• modified to park four vehicles and provide an
adequate backup area. Staf can review and approve the changes prior to
acceptance of plans for buil.,ing plan check.
There are a number of trees on the property,including pines,eucalyptus,oak,
pepper and fr4it trees. The ouse and driveway have been designed to preserve
most of the existing trees. F e ur pine trees will need to be removed to construct
the new residence. The En onmental Design Committee recommends that the
trees to be removed be repl.ced with four Coast Live Oaks (1:1 ratio). The
replacement trees can be loc.ted when the landscape plan is reviewed.
The Engineering Departme t has reviewed the plans and has recommended
conditions of approval as specified in Attachment 1. Grading volumes total 570
cubic yards (45I 0 cu. yds. of ut and 120 Cu. yds. of fill). Most of the excess 330
cubic yards of cut will need o be exported;some of the material may be
distributed on the site.
The Town Geologist has co ducted a review of the plans and geotechnical
reports and has visited the site. The recommendation for approval of the project
is subject to conditions (see ttachment 2). The Fire Department has no
recommended conditions.
The Pathways Committee vi ited the site and recomm nds that the existing path
along Fremont Road be reha ilitated to type IIB standards.
The proposed project will leave 2,303 square feet of floor area and 5,874 square
feet of development area remaining for future additions or improvements. The
project as proposed meets the requirements of the Zoning and Site Development
Ordinances, a 4 staff is reco mending approval. Staff is available to answer
any questions that the Com ission or community may have:
Planning Commission
June 5, 1995
Lands of Kawasaki
Page 3
ATTACHMENTS:
1. Recommended conditions of approval
2. Letter from William Cotton&Associates dated March 17, 1995 (three pages)
3. Pathways Committee recommendation dated April 1, 1995 (one page)
4. Revised development plans: grading plan,site plan,roof plan,floor plans,
elevations (six sheets)
cc: Shumpei &Jane Kawasaki
579 Vista Avenue
Palo Alto,CA 94306
Bill H. Bocook,Architect
4041 El Camino Way
Palo Alto,CA 94306
Planning Commission
June 5, 1995
Lands of Kawasaki
Page 4
ATTACHMENT 1
t e . • ►1I $ • L • t !M_ e . / • ►4
FOR NEW RESIDENCE
LANDS OF KAWASAKI-27078 FREMONT ROAD
A. PLANNING DEPA TMENT:
1. The drivewa shall be modified to allow four 10' x 20' parking
spaces and a I equate backup area. Revised plans shall be submitted
and approve by the Planning and Engineering Departments, prior
to acceptance f plans for building plan check. Any other changes or
modification to the approved plans shall be approved by the
Planning Dir ctor or the Planning Commission, depending upon
the scope of t e changes.
2. The propertowner shall inform the Town of any damage and
Shall repair a y damage caused by the construction of the project to
pathways,private driveways,public and private roadways prior to
final inspection and release of occupancy permits and shall provide
the Town with photographs of the existing conditions of the
roadways an pathways prior to acceptance of plans for building plan
check.
3. Prior to final inspection the final landscape planting plan shall be
submitted fo approval by the Site Development Committee. A
mMinimum of our 15-gallon oaks shall be included to replace the
pine trees to e removed. The Site Del elopment Committee may
equire a de osit, a landscape maintenance agreement, or other
security to a sure that the approved landscape is planted and
mMaintained. utdoor lighting shall be reviewed with the landscape
plan.
4. Prior to begi 'ng any grading operation or construction, any
significant tre s in the area of construction are to be fenced at the
ripline. The ening shall be of a material and structure to clearly
delineate the ripline. Town staff must inspect and approve the
fencing prior lo issuance of any building permits. The fencing must
remain throu:hout the course of construction. No storage of
equipment,v:hicles or debris shall be allowed within the driplines
of these trees.
Planning Commission
June 5, 1995
Lands of Kawasaki
Page 5
5. Other than thefour pinesapprovedfor removal,if any tree six
inches in diameter or larger is removed to accommodate
construction or if a.tree is damaged or destroyed during
construction,it may be required to be replaced. The replacement
tree(s) shall be equal in size to the removed or damaged tree(s),as
determined by.the Planning Director.
6. A grading and construction operation plan shall be submitted by
the property owner for review and approval by the City Engineer
and Planning Director prior, to submittal of plans for building plan
check.. The grading/construction operation plan shall address truck
traffic issues regarding dust, noise, and vehicular and pedestrian
traffic safety on Fremont arid Arastradero Roads and surrounding
roadways; storage of construction materials; placement of sanitary
facilities; parking for construction vehicles; and parking for
construction personnel. A debris box (trash dumpster) shall be
placed on site for collection of construction debris. Arrangements
must be made with the Los Altos Garbage Company for the debris
box, since they have a franchise with the Town and no other hauler
is allowed within the Town limits.
7. Skylights shall be designed and constructed to reduce emitted light.
No lighting may be placed within the skylight wells.
8. Paint color shall be chosen by the applicant and approved by staff
in conformance with the Town's adopted color board. Color
samples shall be submitted to the Planning Director for approval
prior to painting the exterior of the residence.
9. Fire retardant roofing is required for the.residence.
B. ENGINEERING DEPARTMENT:
10. As recommended by. William Cotton & Associates in their report
dated Marche.17, 1995, the applicant shall comply with the
following:
a. The project geotechnical consultant shall further evaluate the . . •
expansive earth materials and pier embedment and
reinforcement, revise design recommendations as needed,
and submit the results of the'supplemental geotechnical
evaluations for review by the Town Geologist and
Engineering Department, prior to acceptance of plans for
building plan check.
Planning Commission
June 5, 1995
Lands of Kawasaki
Page 6
b. The p oject geotechnical consultant shall summarize the
result of their plan review in a letter and submit it to the
Town Engineer for approval, prior to acceptance of plans for
buildi plan check.
c. The p oject geotechnical consultant shall describe the results
of ins ections and as-built conditions of the project in a letter
to be ubmitted to the Town Engineering Department prior
to fina inspection.
For further d tails on the above requirements, please reference the
letter from ' liam Cotton&Associates dated March 17, 1995.
11. he site drai age associated with the proposed development must
•e designed as surface flow wherever possible to avoid
concentration of runoff. The proposed drainage shall be designed
to maintain t e existing flow patterns. Final drainage and grading
shall be ins•ected by the Engineering Department and any
deficiencies corrected to the satisfaction of the Engineering
Department •rior to final inspection.
12. Any, and all, changes to the existing grading and drainage plan
hall first be .pproved by the Town Engineering Department. No
grading shall take place during the grading moratorium between
November 1 .nd April 1 except with prior approval from the City
Engineer. o grading shall take place within ten feet of any
property line -xcept to allow access to Fremont Road.
13. An erosion a d sediment control plan shall be submitted for review
P4 nd approval by the Engineering Department prior to acceptance of
lans for buildi g plan check. The contractor and the property owner
hall comply with all appropriate requirements of the Town's
NPDES perm t relative to grading and erosion/sediment control.
kny areas on the site that have the native soil disturbed shall be
rotectedfor rosion control during the rainy season and shall be
planted pri r to final inspection.
14. 1 public util ty services shall be undergrounded.
15. The location, levation and height of the new residence, decking
and driveway shall be certified in w�iting by a registered civil
engineer or •licensed landsurveyor as being in the locations,
elevations an heights approved by the Town and as shown on the
Site Development Plan.
Planning Commission
June 5, 1995
Lands of Kawasaki
Page 7
16. The existing pathway on Fremont Road shall be upgraded to type
IIB standards to the satisfaction of the Town Engineering
Department prior to final inspection. The driveway shall be
roughened where it crosses the path to the satisfaction of the
Engineering Department, and no irrigation or planting may be
placed within five feet of the path.
17. All appropriate sanitary sewer connection fees shall be paid to the
Town prior to acceptance,of plans for building plan check. The
new residence shall connect to sanitary sewer prior to final
inspection.
18. Upon completion of the construction, a final inspection shall be
required to be set with the Planning and Engineering Departments
two weeks prior to final building inspection approval.
CONDITION NUMBERS 1, 2, 6, 10 AND 13 SHALL BE COMPLETED AND
SIGNED OFF BY THE PLANNING DIRECTOR AND THE CITY ENGINEER
PRIOR TO.ACCEPTANCE OF`CONSTRUCTION PLANS FOR PLAN CHECK
BY THE BUILDING DEPARTMENT.
PROTECTIVE TREE FENCING SHALL BE INSPECTED AND APPROVED
BY THE PLANNING DEPARTMENT PRIOR TO ISSUANCE OF BUILDING
PERMITS.
Properties residing-within the Los Altos School District boundaries must pay
School District fees before receiving their building permit from Los Altos
Hills. The applicant must take a copy of Worksheet#2 to both the elementary
and high school district offices, pay the appropriate fees and provide the Town
with a copy of their receipts.
NOTE: The Site Development permit 'is valid for one year from the approval
date (until.June 5, 1996). All required building permits must be obtained within
that year and work on items not requiring a building permit shall be commenced
within one year and completed within two years.
tiL.w.r,,MhIGAL CONSIJLIan o a
,. William Cotton 330 Village Lane
V, Los Gatos, California 85030
and ASsociteS (408) 354-5542 ,
•
March 17, 1995
FILE curt' ; L3025-------
.....---------
TO:
-----
TO: Susan Manta •,.•. _.__ .. � ---.. . .... ,_�'� �,r..R�rti -'�
I Go rcv�jg-d'
Town Planner �-
TQWN OF LOS • LTOS HILLS. �'"'"``"•
.r�.w4 '
26379 Fremont R•ad ��W"' /17/9 5
Los Altos Hills, I alifornia 94022 - k 444- lowri".' f
SUBJECT: Preliminary Geo ogic and Geotechnical Revie
RE: Kawasaki-New Residence
27078 Fre ont Road (Lot 8)
#23-95-Z -SD-GD
At your request, we ha e completed a preliminary geologic and geotecnnical
• review of the subject application- using:
• Geologic Investi:ation (report) prepared by Terrasearch, Inc.,
dated July 20, 19 3; •
• Soil Investigatio (report) prepared by Terrasearch, Inc., dated
October 6, 1982;
, r'vt - • Architectural P1 ns and Sections (5 sheets, various scales)
#2)/(q•C----1----2=6- prepared by Boco k,dated February 24, 1995 and
• Topographic S ey Map (1 sheet, 20-scale) prepared by Lea &
Suxg Engineering dated July 19,1994.
•
In addition,we have revi wed pertinent technical documents from our office files
and performed a site reconnaiss ce.
DISCUSSION
Our revie7 of the refer ed documents indicates that the applicant is proposing
to construct a single-family resid nce, attached garage,driveway,and retaining walls on
an undeveloped lot. The propo ed driveway will provide access to the residence from
Fremont Road.
SITE CONDITIONS
The propoed building s_te is located on a gentle to moderately steep (6 to 9
inclination), north est-facing slope. At the time of our site visit,the ground surface at
the site was soft due to the recent rains and periodic tilling. Drainage at the subject
property is generally characterized by sheetflow to the northwest that is intercepted
along Fremont Road.
I.
---•-•- ..... . ...... .. _.......-....I.-.._.. -...�. i nr.inkinme+ - et-al inineTIAN PNnINRFAINC;
Susan Manca March 17, 1995.
Page 2 L3025
The Town Geologic Map indicates that the site is underlain by semi-consolidated
sedimentary bedrock of the Santa Clara Formation. The bedrockis overlain by
potentially expansive silty and sandy clay (soil and colluvium). Data from the
referenced soil investigation suggests that the colluvium is approximately 3 feet in depth.
CONCLUSIONS AND RECOMMENDED ACTIQN
The proposed development is con I trained by the presence of potentially
expansive earth materials, creep of surficial materials on moderately steep slopes, and
susceptibility to strong seismic shaking. According to the referenced documents by
Terrasearch, surficial materials at the site iremoderatelyto highly expansive. The
project geotechnical consultant has recommended that "non-expansive soils be utilized
for finishing the pads". The propertyowner should be aware that any appurtenant
structures constructed on potentially expansive materials (i.e., on-site soils) will likely
undergo movement and resulting distress. The consultant has recommended that the
residence be supported on a pier and grade beam foundation. However, the
geotechnical design criteria prepared in 1982 should.be reviewed and updated.
Consequently, the following conditions should.be satisfactorily completed prior to
issuance of grading or building permits: ,.
1. Geotechnical Update and Supplemental Evaluations-the project
geotechnical consultantshould complete the following geotechnical
evaluations and provide appropriate updates to design •
recommendations as necessary:
•. Expansive Earth Materials: !The referenced documents indicate
that site soils are moderately to highly expansive (PI values of
35 and 48), but that site soils may be utilized as fill. The
consultant should clarify whether native soils are suitable for i
use as fill beneath the proposed driveway. In addition, the
consultant should clarify whether foundation piers and
gradebeams are to be designed to resist uplift pressures from
expansive soil materials.
• Pier Embedment and Reinforcement: The consultant should
identify the depth to competent foundation bearing materials for
the piers,and recommend minimum pier embedment depths into
competent materials considering the current standard of practice
for foundation design. Recommendations for minimum pier
reinforcement, required from a geotechnical standpoint,should
be provided.
The results of these supplemental geotechnical evaluations should
be summarized by the consultant in a letter and submitted to the
Town for review and approval by the Town Engineer and
Geotechnical Consultant prior to issuance of grading or building
permits.
2. Geotechnical Plan Review - The project geotechnical consultant
should review and approve all geotechnical aspects of the final
development plans (i.e., site preparation and grading,site drainage
improvements and design parameters for foundations,and retaining
William Cotton and Associates
•
Susan Manca March 17, 1995
• Page 3 L3025
walls) to ensure that his recommendations have been properly
incorporated.
• The results of t e plan review should be summarized by the
geotechnical con_ultant in a letter and submitted to the Town
Engineer for revi-w and approval prior to issuance of grading or
biding permits.
fi .
3. C. . • + +• = - i :. .. + -The geotechnical consultant shall
ins' ect, test (as n-eded), and approve all geotechnical aspects of
the project cons ction. The inspections should include, but not
necessarily be li ted to: site preparation and grading, site surface
and subsurface rainage improvements, and excavations for
foundations and r-taming walls prior to the placement of steel and
concrete.
The results of the-e inspections and the as-built conditions of the
project shall be de-cribed by the geotechnical consultant in a letter
andl submitted to t e Town Engineer for review prior to final project
appoval.
Respectfully submitted,
WILLIAM COTTON AND ASSOCIATES, INC.
TOWN GEOTECHNICAL CONSULTANT
• Ted Sayre
Senior Engineering Geologist
CEG 1795
Patrick 0. Shires
Principal Geotechnical Engineer
GE 770
POS:TS:rb
•
William Cotton and Associates
Town of Los Altos Hills
4/1/95
l`G
To: Planning Commission & Staff .. `:'L)
1995
Cc: Katy Stella
From: Les Earnest, Pathways Committee Chair '� �'--
Subject: Pathway requests
13020 Cumbra Vista; Lands of Conradson: Construct II-B path in 12 foot
easement along the I-280 frontage from the North boundary of property
to the first point where the boundary changes direction, then along a 10%
descending slope to the boundary with 13019 Cumbra Vista. Also
provide a 10 foot easement over driveway from the end of Cumbra Vista
and along the South boundary of the property to the pathway easement
described above and construct a II-B path on the part beyond the
driveway.
25879 Fremont Road; Lands of Wong: Restore II-B path along Fremont.
27078 Fremont Road; Lands of Kawasaki: Restore II-B path along
Fremont as needed.
14127 Miranda Road; Lands of Curley: Restore II-B paths along Fremont
and Miranda.
26879 Moody Road; Lands of Yanez: Construct II-B path in easement,
parallel to Moody Road.
24025 Oak Knoll Circle; Lands of Loh!: No request.
27951 Purissima Road; Deer Creek Subdivision: Construct II-B path
along Purissima and in a 10 foot easement along the North side of the
property from Purissima to the corner then along the East side of the
property to a point 10 feet beyond the boundary between 12829 and
12849 Canario Way, where a future pathway may connect to Canario Way.
The slope of the path shall not exceed 10%, in general, a bridge or culvert
crossing Deer Creek shall be constructed and the easement going uphill
from the creek for a distance of 200 feet shall be 20 feet wide to
accomodate switchbacks.
26707 Tanglewood; Lands of Lloyd: Pathway easement over Tanglewood
Lane for future pathway connection to Chaparrel Way.
Note: where construction or upgrading of paths to the II-B standard is
recommended, this is to include irrigation at least 5 feet away from path
and a non-slip surface on any crossing driveways. Where there is "no
request" we recommend that in lieu fees be collected where possible.