HomeMy WebLinkAbout6.2 '
TOWN OF Los ALTOS HILLS July 12, 1995
Staff Report to the Planning Commission
RE: CONDITIONS, OF APPROVAL RE: LANDSCAPING, COLORS,
REQUIRED CERTIFICATIONS, AND OUTDOOR LIGHTING
FROM: Curtis Williams,Planning Director
RECOMMENDATION That the Planning Commission:
Provide direction, if any,regarding language of the conditions of approval.
BACKGROUND
Staff typically includes a number of recommended conditions of approval with
each project reviewed by the Commission and Council. Some are also standard
conditions which apply to Site Development Committee and staff approvals.
The Planning Director has reviewed the;standard conditions and is proposing
several changes to the current language.
DISCUSSION
•
Attached are revised conditions of approval related to landscaping and
landscape maintenance; paint colors; certification of setbacks, elevations, and
height; and outdoor lighting. Staff feels that these conditions needed revision to
better reflect Code requirements, Council policy, or actual practice. Changes are
denoted by strikethru for deletions to current standard language, and bold for
added language.
The changes include:
1. Landscaping - Requires that landscape for screening purposes or for
erosion control be installed prior to final inspection and occupancy, rather
than just posting a bond to complete the work after occupancy. This is a
very important means to ensure that landscaping is planted in a timely
manner, as final inspection and occupancy provide a substantial incentive
for the property owner. Part (b) also allows staff to require additional
landscaping at the time of Planning's final inspection.
2. Landscape Maintenance - Rather than requiring a one year landscape
maintenance bond for a nominal amount, this condition is revised to
require a two-year bond for all landscaping required for screening
purposes or for erosion control. The bond must be posted prior to final
inspection/occupancy and wouldbe set in an amount equal to the cost of
materials and installation for those items. One-half of the deposit could be
refunded after one year, with the remainder to be refunded after two years
Planning Commission: July 12, 1995
Conditions of pproval I
Page 2
I
of adequate mainten nce. This will be a more meaningful incentive for
the property owner to maintain landscaping and better reflects reality that
it takes two years forost significant vegetation to become established.
3. Paint Colors - This condition has been revised to reflect the Council's
recent policy adoption regarding the color board and reflectivity values,
and assures that painting per approved colors occurs prior to final
inspection. .
4. Building/Grading Certifications - The suggested condition requires that
certification of setbalks and elevations occur ;not later than the time of
foundation inspections, and that height certifications be submitted not
later thn the time of framing inspections. The current language requires
those certifications only prior to final inspection, which is in reality too
late to change setbacks and height if there is an error, without substantial
time andicost expense. It still remains the responsibility of the applicant
to provide those certi ications by qualified professionals.
5. Outdoor Lighting- This condition has been changed only to require that,
if building plans aro to show electrical installation to support new
lighting, then the lighting specifications must be submitted and approved
by the Panning Department prior to plan check. Staff occasionally finds
situations where electrical lines are going int the ground, anticipating
lighting but no lighting has been approved.
The above revised conditions have been incorporated into conditions of approval
for items on this Commission agenda, as applicable. Staff feels that the revisions
will better assure implemen ation •
of approved plans and consistency with Code
requirements. I
Staff is available to respond to questions from the Commission and the
community.
ATTACHMENT:
1. Conditions of Approval
/pccondapps.rep
Planning Commission: July 12, 1995
Conditions of Approval
Page 3 r
ATTACHMENT 1
TOWN OF LOS ALTOS HILLS
CONDITIONS OF APPROVAL
•
Landscaping
a. Subsequentto framing and/or grading and/or
installation of hardscape, a landscape planting plan shall be reviewed by the Site
Development Committee. Particular attention shall be given to plantings which
will be adequate to break up the view of the new residence from surrounding
properties. • . - - -- ' _ _ _ . _ - . - - . - - -- -- - - - . . .
All landscaping required for screening purposes or for erosion control must
be installed prior to final inspection. Outdoor lighting shall be reviewed and
approved with the landscape plan. -
b. Additional landscaping may be required. Staff will visit the site prior to
final inspection to determine if any additional plantings will be needed to screen
the new addition or to restore areas disturbed by grading or construction.
Landscape Maintenance
A$ landscape maintenance deposit, equal to the cost of materials and
installation for all landscaping required for screening purposes or for erosion
control,shall be posted prior to final inspection. P -: -' -: : . - _ . _
•- . _ .. ' - - _ - . . An inspection ofithe landscape to ensure adequate
establishment and maintenance shall be made cix months one year after the
installation. Fifty percent(50%) of the bond shall be returned following the date
of the inspection, if maintenance is adequate. The remainder will be released
one year later two years after installation if the plantings remain viable.
Painting
Paint colors shall be chosen by the applicant and approved by staff in
conformance with the Town's adopted color board, and shall exhibit a light
reflectivity value of 50 or less. Roofs shall use materials which have a light
reflectivity value of 40 or less. White trim area should be minimized,
particularly on large surfaces such as doors, columns,railings, and trellises. A
color sample shall be submitted to the Planning Department for approval prior to
painting of the exterior of the residence. All applicable structures shall be
painted in conformance with the approved color(s) prior to final inspection.
•
Planning Commission: July 12, 1995 •
Conditions of Approval
Page 4
Building Certification
At the time of foundation inspection for a building and prior to final
inspection fo> grading andardscape improvements;tThe location, and
elevation ani-keight of the I ew residence, decking, driveway and pool shall be
certified in writing by a registered civil engineer or licensed land surveyor as
being in/at the approved location, and elevation . - : •'•':- . : : : . -: - .
- -
Town-and-shown on the approved Site Development plan. At the time of
framing inspection for a bwilding and prior to final inspection for grading and
hardscape improvements, thee height of the building'or other structures shall
be similarly certified as beijg at the height shown on the approved Site
Development plan. • - - . . '. - . . - _ - - . - - . .. -
prior to final inspection. j
Outdoor Lighting
Any additional outdoor lighting not shown on the plans requires approval by the
Planning Department prior o installation. Lighting specifications shall be
submitted for Planning Department approval prior to acceptance of plans for
building plan 1icheck, if such plans will indicate electrical installation to
support new lighting. Lighting shall be down shielded, low wattage, and shall
not encroach or reflect on adjacent properties. The souirce of thelighting shall not
be visible from off the site. No lighting may be placed within setbacks except for
two driveway or entry lights.
•