Loading...
HomeMy WebLinkAbout3.2 TOWN OF Los ALTOS HILLS ' October 25, 1995 Staff Report to the Planning Commission RE: REQUEST FOR A SITE DEVELOPMENT PERMIT FOR AN ADDITION AND REMODEL OF AN EXISTING RESIDENCE; LANDS OF BASIJI; 27880 FAWN CREEK COURT. FROM: Suzanne Davis,Planner jD APPROVED BY: Curtis S.Williams,Planning Direc RECOMMENDATION That the Planning Commission: Approve the requested Site Development Permit, subject to the recommended conditions. BACKGROUND The property is located on the southerly,side of Fawn Creek Court with a tip of the lot adjacent to Page Mill Road. The property is almost triangular in shape, and was created as part of a six lot subdivision (Tract 7762) which was recorded in September 1985. There are a number of easements over the property which combined with the setback requirements greatly limit the area where development can be done. Matadero Creek bisects the property through one of two conservation easements. There is a,ten foot wide sanitary sewer easement over the first ten feet, and a Santa Clara Valley Water District easement over all but 50 feet of the conservation easement closest to the house. A 10 foot wide storm drain and utility easement runs along the north(rear) property line. There is also a view and scenic easement primarily over Fawn Creek Court,but which encroaches about five feet onto the property, along a portion of the front property line. Attachment 2 shows the various easements on the property. CODE REQUIREMENTS In accordance with Section 10-2.301 of the Site Development Ordinance, the proposed project has been referred to the Planning Commission for review as it indudes additions exceeding 900 square feet, and the height will exceed 15 feet. Planning Commission • October 25, 1995 Lands of Basiji Page 2 DISCUSSION Site Data: Net Lot Area: 1.48 acres Average Slope: 14.6% Lot Unit actor: 1.33 I i , Floor Area and Development Area: Area Max. Prop. Exist. Incrs. Left Devel. 17,656 10,808 8,840 +1,968 +6,846 Floor 7,674 5,350 4,252 +1,098 +2,324 Architecture &Site The applicants are requesting approval of a Site Development Permit for a major addition and remodel of an existing one-story residence. I The proposed addition is 1,098 square feet, and will be made at the rear of the house. A terrace and some walkways will also be added. One path that will encroach into the conservation easement will be gravel. The addition is proposed approximately five feet from the conservation easement at the closest point. Staff has included a condition requiring a minimum of five feet between the house and the conservation easement. Another condition specifies thatthe path alongside and within the conservation easement shall be a maximum of four feet wide and shall be constructed of natural materials. Exterior materials for the new construction will match those existing: stucco siding, wood windows, doors and trim, concrete tile roofing and pre-cast stone balustrade. Orie small skylight will be added. The plans indicate that the existing exterior colors will be matched. If the exterior colors are changed the Planning Depaztment will review the proposed colors for compliance with the Town's adopted color board. , The highest point of the house is 26 feet as measured from existing grade. The height will not be changed with the proposed project. The addition would bring the total floor area to 5,350 square feet. The project would be 6,846 square feet less than the allowable.MDA and 2,324 square feet below,the allowable MFA for the property. Trees &Landscaping No trees will be removed for the project. The house is low lying relative to other homes on Fawn Creek Court, and the addition will not,be obtrusive to any Planning Commission October 25, 1995 Lands of Basiji Page 3 surrounding neighbors. Some new landscaping may be needed at the rear of the house for mitigation screening, although there is sustantial landscaping around the house now. Staff has included a condition stating that the site will be evaluated once the framing is done to determine if additional planting is needed for erosion control or mitigation screening. Parking&Driveway There are presently three on-site parking spaces, all in the garage. There is a parking bay which can accommodate two more vehicles. However, the parking bay is partially within the front setback and partially in the public right-of-way (all of the properties along Fawn Creek Court have improvements in the right-of- way). Section 10-1.601 of the Zoning Ordinance requires four on-site parking spaces. When the residence and a subsequent driveway modification were approved in 1988, a fourth parking space was counted in the parking bay. Although the code does not specifically 'state that required parking spaces may not be within setbacks, this has been the Town's policy for at least the past three years. Also, the parking bay is needed as backup area for vehicles parked in the garage or driveway. Staff cannot suggest a logical place to add a fourth parking space without encroaching into a setback, either with the driveway and/or a parking space. The only area where a space could possibly be added is near the northeast corner of the house. However, this is not a practical location as it would require a driveway extension through the front setback, and the space would be right in front of the house. Also,the parking space would be in an area that is presently landscaped. The existing house is sandwiched between the conservation easement and the 40 foot front and 30 foot side setbacks. Staff recommends that the project be approved with the existing parking and driveway to remain as previously approved by the Town. Plan Review Comments The Engineering Department has reviewed the plans and has recommended conditions of approval, as specified in Attachment 1. The only grading which is required to construct the addition is the excavation for the foundation. Final drainage will be reviewed by the Engineering Department, and any deficiencies will be required to be corrected,prior to final inspection. The Fire Department has requested that', the property address be clearly visible from Fawn Creek Court and that the ;property be kept clear of debris and flammable materials during construction. These requirements have been incorporated into the conditions of approval. The Pathways Committee has no request for this property, and no written comments were received from the Environmental Design & Protection Committee. Planning Commission October 25, 1995 Lands of Basiji Page 4 � I Staff is available to answer any questions from the Commission or any member of the community. ATTACHMENTS: 1. Recommended Conditions of Approval 2. Map shoving easements 3. i Worksheet#2 4. ! Development plans: site,floor and roof plans and elevations (five sheets) cc: Jim&Jennifer Basiji 27880 Fawn Creek Court Los Altos Hills,CA 94022 McBride Design&Construction 5 Arastradero Road Portola Valley,CA 94028 Planning Commission October 25, 1995 Lands of Basiji Page 5 ATTACHMENT 1 RECOMMENDED CONDITIONS FOR SITE DEVELOPMENT PERMIT FOR A MAJOR ADDITION&REMODEL LANDS OF BASIJI-27880 FAWN CREEK COURT A. PLANNING DEPARTMENT: 1. Any changes or modifications to the approved plans shall be approved by the Planning i Director or the Planning Commission, depending on the scope of the changes. 2. All new outdoor lighting including fixtures to be placed on the house must be approved by the Planning Department prior to installation. Lighting shall be low level,low wattage, and shall not reflect or encroach on adjacent properties. No lighting may be placed within setbacks except for two entry or driveway lights. 3. Subsequent to framing, staff will visit the site to determine if any new landscaping is needed for erosion control and/or mitigation screening, and if so, a landscape screening plan shall be reviewed by the Site Development Committee. Particular attention shall be given to plantings which will be adequate to break up the view of the new residence from surrounding properties. All landscaping required for screening purposes or for erosion control must be installed prior to final inspection. 4. A landscape maintenance deposit (or certificate of deposit),equal to the cost of materials and installation for all landscaping required for screening purposes or for erosion control (as determined by the City Engineer),but not to exceed$5,000.00,shall be posted prior to final inspection. An inspection of the landscape to ensure adequate establishment and maintenance shall be made two years after installation. The deposit will be released at that time if the plantings remain viable. 5. If any tree six inches in diameter or larger is removed to accommodate construction or if a tree is damaged or destroyed during construction, it may be required to be replaced. The replacement tree(s) shall be equal in size to the removed or damaged tree(s), as determined by the Planning Director. Removal of any additional oaks requires prior approval by the Town, and three to five replacement trees will be required, depending on the size and condition of the removed tree. i v Planning Commission October 25, 1995 Lands of Basiji Page!6 6. Skylights shall be designed and constructed to reduce emitted light. No lighting may be placed within the skylight wells. I ' 7. Paint colors, if changed, shall be chosen by the applicant and approved by staff in conformance with the Town's adopted color board, and shall exhibit a light reflectivity value of 50 or less. Roofs shall have a light reflectivity value of 40 or less. White trim area shall be minimized, particularly on large surfaces such as doors, columns,railings and trellises. Color samples shall be submitted to the Planning Department for approval prior to painting the exterior the residence.n All structures shall be painted in conformance with the approved color(s) prior to final inspection. 8. Fire retardant roofing is required for the new construction. 9. At the time of foundation inspection for the ihouse and prior to final inspection for grading and hardscape improvements, the location, and elevation of the additions and hardscape shall be certified in writing by a registered civil engineer or licensed land surveyor as being in/at the approved locations, and elevation shown on the approved site development plan. 10. The addition shall be a minimum of five feet from the conservation easement at the closest point. 11. The walkway shown in the conservation easement shall be constructed of natural materials at the natural grade and shall be a maximum of 4 feet wide. B.- I ENGINEERING DEPARTMENT: 12. The site drainage associated with the proposed development must be designed as surface flow wherever possible to avoid concentration of the runoff. The proposed drainage shall be designed to maintain the existing flow patterns. Final drainage and grading shall be inspected by the Engineering Department and any deficiencies corrected to the satisfaction of the Engineering Department prior to final inspection. 13. Ari y, and all, changes to the approved grading and drainage plan shall first be approved by the Town Engineering Department. No grading shall take place during the grading moratorium between November 1 and April 1 except with prior approval from the City Engineer. No grading shall take place within ten feet of any property line. • I Planning Commission October 25, 1995 Lands of Basiji Page 7 14. Any new public utility services serving this property shall be undergrounded. 15. Two copies of a grading and construction operation plan shall be submitted by the property 'owner for review and approval by the City Engineer and Planning Director prior to acceptance of plans for building plan check. The grading/construction plan shall address truck traffic issues regarding dust, noise, and vehicular and pedestrian traffic safety onI Fawn Creek and Page Mill Roads and other surrounding roadways; storage of construction materials; placement of sanitary fcilities; clean-up area, parking for construction vehicles; and parking for construction personnel. A debris box (trash dumpster) shall be placed on site for collection of construction debris. Arrangements must be made with the Los Altos Garbage Company for the debris box, since they have a franchise with the Town and no other hauler is allowed within the Town limits. 16. The property owner shall inform the Town of any damage and shall repair any damage caused by the construction of the project to pathways, private driveways, and public and private roadways, prior to final inspection and release of occupancy permits and shall provide the Town with photographs of the existing conditions of the roadways and pathways prior to acceptance of plans for building plan check. C. FIRE DEPARTMENT 17. During the construction process,the building site and surroundings shall be kept clear of debris and flammable materials. 18. The property address shall be placed on the property so that it is clearly visible and legible from Fremont Road. The address numbers shall contrast with the background color. Upon completion of construction,a final inspection shall be set with the Planning Department and Engineering Department ate least two weeks prior to final inspection. CONDITION NUMBERS 15 AND 16 SHALL BE COMPLETED AND SIGNED OFF BY THE PLANNING DIRECTOR AND THE CITY ENGINEER PRIOR TO ACCEPTANCE OF CONSTRUCTION PLANS FOR PLAN CHECK BY THE BUILDING DEPARTMENT. ALL;OTHER CONDITIONS MUST BE SATISFIED PRIOR TO FINAL INSPECTION. I y Planning Commission October 25, 1995 Lands of Basiji Page Properties resi ing within the Los Altos School District boundaries must pay School District fees before receiving their building permit from Los Altos Hills.' The applicant must take a copy of Worksheet#2 to both the elementary and high school district offices,pay the appropriate fees and provide the Town with a copy of their receipts. NOTE: The Site Development permit is valid for one year from the approval date (until October 25, 1996). 'All required building permits must be obtained within that year and work on items not requiring a building permit shall be commenced within one year and completed within two years. I I it I i �I c I I I i I I I I � I • PNpS • 4 .ate ti ./ L - Z lam' H� L.ANE E5- s� ANO -j 0.44-N, 0 ____------004014 1A EGRE "Y 40. / �' .51 .2........,---- 1NGRE ss, VZ 1l `b 0 lb a . ��� �NOERG el, LOT 1 _ ? 1 . 32 AC o / _ • ' R 'CfBPw� ••- /4.1/4„. 10' E.T.E. a P.E. PA°S t N 0 �p ��i - NOTE ° m ° m `per- • INDICATES FOUND 3/41. IRON Z ;--A = 6°16' 06" `4 A. 83° 32' E 174.95) PIPE, RESET 6 TAG R.CtE. 13776 • / L = 14.22' rpj m • 3'40'36"E 174.74 4,i4, I 126.00 'lC .,30 ��A1° 03 .,30,0. N 64'50'36"E 0 ` /�?�, 2�0• ,., 2•40'00 N 04'50'35'E 156.00 MON.•C • '�°H� `•k X91. �"s' . ' 0' FAWN CREEK COURT �'ej.f\� 4 y OF 90 i �L•�O �r�� :R61' N !!4�60'36"E 126.00 �� . (�c.% TJ. NfN,2° ��A2 tk eC°` • 2.13 0 90.00 00. 4) O 'O� J2, k. • o Q N, .10.00 „ az `�� 26• WJ .F. 4., .I... q•4. 40'00, ,6.../ A L-a1. LOT 6 s��.� ° . s,�•0,2�, • a y�0 � o �• • 1 . 25 AC 4 ti o Rz444•e.7•° 0° °'�'• O ..4',34"• ' �` �,.•..� • ,h d,� • �,� LOT 5 AF aFC R=2x,.29,i' � S •43 4 • --7 , °u., 1 . 50 AC z_ .�`d',�04, a -A-t. .5 66 ,4• - ���•y� w�C�cP 0°. \�� N LOT i ° ` � ��_—. 6' v3"-_-_--..-� 1°•,� tip,, y, `� .33 A ��� � � or�2�'°' 32. L'no �•,�� �8 8 v . y s \� gP g 8 It '&116`..4,1%0To. . Al .`7 00 X62'S�' cP�• � ;• 4p •y < • p�\ .\y �5- glr:c6 i, `••,oc" • 13" iv; ••Sj` • i °9- •) • P.G.8 E. CO. E a• �7% : d5'Z 1r• ,j,'' p�\`r�,yC,� F�`,� y SINGLE LINE OF (8K. 859 O.R.,P d�' 1,., --Q - L.A.H.C.E. .\� 10'S.D.E. (B i ✓ •P • 'C' :'n.... -� $ I '� . LYS- 'tom— A. • — K. .0 r ' - `- °• N 914'27 7.7 y �: "w(R) N 96'05'44"E 870.20 • -I � �1\ 'yam 5% 4 \ (N 86° 05' 44"E 1254.70')3 128 °O ,/; '.;r• o LANDS OF STARK 4 A. I2•. �� /1 O �,, 4. . T • � 4; LP 10 0 13 • 0 0 ,t ti.,:) 00 kt.0) . . S j ' �,•z12.....C.......... • 1. �b,s • i616 • I o' • MON••p' oN' 4P • •. WI) C ®-'N 86° 05' 44" E Jt .S SEE DETAIL TO ,n \ _ I. aL)rvN tyL. LOS ALTOS H1LLS . 26379 Fremont Road • Los Altos Hills,California 94022 • (415)941-7222 • FAX (415) 941-3160 PLANNING DEP — WORKSHEET #2 EXISTING AND PROPOSED DEVELOPMENT AREA AND FLOOR AREA • TURN IN WITH YOUR APPLICATION • PROPERTY OWNER'S NAME is,rv7 UP 13,C,D I 4,1 .5. 'FIN)I F. 1:R `.aI PROPERTY ADDRESS Z-1 ' P \V(,) 4.4zwK e.,,,Li.pzr, Ij1- r A. r4 -1 CALCULATED.BYG 2i 7 vriAlbliu �, j%j1• DATE •ei / $ • 23,(7W 1. DEVELOPMENT ARE (SQUARE FOOTAGG ) �! Existing Proposed Total (Additions or Deletions) A. House and Garage (from Part B) 4 2 5 1 1 X 9 5.0 • B. Decking 4p)0. 5 ,(46t C. Driveway and Parking (Measured 100' along centerline) 2- ( 9 CO 2 -77 D. Patios and Walkways } 9 ( 1 • 0 - 3 2.-- GC," E. Tennis Court NA r F. Pool and Decking NA G. Accessory Buildings (from Part B) N A. H. Any other coverage NA- TOTALS '3 e) 1, 5 k 271 (0 112, Worksheet #1) I Maximum Development Area Allowed - MDA (from ( � 2. FLOOR AREA (SQUARE I FOOTAGE) ExistingProposed Total (Additions or Deletions) A. House and Garage a. 1st Floor �442, ( O b. 2nd Floor Mk c. Attic and Basement A 7 d. Garage 90 B. Accessory Buildings a. 1st Floor (\l/4- b. /4- b. 2nd Floor • c. Attic and Basement TOTALS 4252 16%"9. Maximum Floor Area Allowed - MFA (from Worksheet #1) -701 TOWN USE ONLY I CHECKED BY 5(,(2,8n YIP, 1---)a v15 I DATE IC) I 12.-1C) it �� LRL: MAC HD/ORIGINALS/PLANNING/Worksluet N2 Revised 12/09/93