HomeMy WebLinkAbout3.4 TOWN OF Los ALTOS HILLS October 25, 1995
Staff Report to the Planning Commissions
RE: SITE DEVELOPMENT PERMIT FOR AN ACCESSORY BUILDING,
LANDS OF TENG,25420 CRESCENT LANE.
FROM: Susan Manca,Planne4g7
APPROVED BY: Curtis S.Williams,Planning Direc 3
RECOMMENDATION That the Planning Commission EITHER:
1. Approve the requested Site Development Permit subject to the attached
conditions of approval; OR
2. Request the applicant to redesign the cabana to comply with secondary
unit criteria.
BACKGROUND
The subject property is Lot 8 of Tract 9971 There are no subdivision conditions of
approval for this parcel. There is a 5 foot public utility easement along the
northwesterly property line. The lot is on the north east corner of Crescent Lane
and Elena Road.
CODE REQUIREMENTS
According to Section 10-2.301 of the Site Development Code, additions to a
property which exceed 900 square feet of floor area are reviewed by the Planning
Commission. Generally,the sections of Zoning Code utilized to evaluate major
additions involve floor and development area limitations,grading,height,
setback issues, and parking requirements.
DISCUSSION
Site Data:
Net Lot Area: 1.0 acres
Average Slope: 5.9%
Lot Unit Factor: 1.00
Floor Area and Development Area:
Area Max. Prop. Exist. Incrs. Remaining
Devel. 15,000 14,095 12,335 1,760 905
Floor 6,000 5,584 4,274 1,310 416
Planning Commission
October 25, 1998
Lands of Teng
Page 2
Site and Architecture
The proposed accessory building (cabana)would be 1,310 square feet of floor
area,with 2 decks extending off of the structure, 1 of which is existing. The
addition would be a maximum of 17 feet in height at any given point and the
height from the lowest point to the highest point would be 19.5 feet. A new
concrete pathway is proposed to access the new structure;from the pool area and
from the main house. The applicant would have adequate area for future
additions of floor area and development area.
The plans indicate the proximity of the neighbor's house adjacent to the east.
(Please note that there is floor area above the neighbor's garage.) The applicant
has stated that they have tried to work with the neighbor in designing an
accessory building that would be as unobtrusive as possible. The original design
of the;accessory building was a 2 story structure with over 1,700 square feet. The
current application is intended to mitigate negative visual impacts from the
neighbor's residence. The current design of the structure will be visible from the
neighbor's proprty,but the mature pines help to screen the one story structure.
Staff has included wording in the landscape requirement that special attention
should be given!to additional screening of the building from the neighbor.
The proposed accessory building is similar in architecture'to the existing
residence. It is designed as a one story structure with a roof line similar to the
existing house. The applicant proposes to finish the accessory building with
vertical wood siding,stone veneer, and a wood shake roof.
! i
The applicant proposes to include a skylight in the accessory building.
Condition#6 ha been added to require that the skylight be designed to reduce
emitted light and that no lights be placed within the wells: The skylight would
not be highly visible from the neighboring residences due to the number of pine
trees between the accessory building and the neighbor's property.
Use of the Accessory Building
The proposed accessory building has 3 bedrooms,3 bathrooms and a common
living'area. The floor plan is similar to a secondary unit in these characteristics,
yet does not include a kitchen. The definition of a secondary unit is "a dwelling
unit which provides complete independent living facilities for ... living,sleeping,
eating, cooking,land sanitation" (see Section 10-1.218 of the Los Altos Hills
Municipal Code. Although the building does not have facilities for eating or
cooking,staff recommends that,given the size of the structure,the owners be
required to record a restriction stating that the accessory building may not be
converted/utilized as a secondary unit and may not be rented as such (see
condition 11).
•
Planning Commission
October 25, 1995
Lands of Teng
Page 3
The applicants have indicated that they intend to utilize the structure as an
extension of the main residence. An addition of this size to the existing residence
would require a major change to the floor plan and to the configuration of the
house. The architect has indicated in a letter (see attachment 3) that the applicant
is willing to sign a recorded restriction,limiting the use of the structure from
being converted into a secondary unit.
Parking
There is a 2 car garage located on the property,with access to the site from
Crescent Lane. The addition of 1,310 square feet would be a major addition and
staff recommends that at least I additional parking space be required. There is
limited area on the site to easily access a third parking space,located out of the
setback. Staff recommends that the slab to the west of the garage be made
accessible from the driveway and converted into a required parking space. This
proposal would increase the development area by approximately 150 square feet.
The additional parking space has been added as a condition of approval (see
condition#13).
The Commission may wish to also consider whether substantial additions such
as this,should require full compliance with parking requirements,i.e.,4 spaces.
Grading
Grading for the development will include 18 cubic yards of cut and 78 cubic
yards of fill. The fill will be placed along the southern end of the building pad
for the accessory structure. Maximum fill levels in this area will be 2 feet.
Sewer Connection
The accessory building would require direct connection to the sanitary sewer
system in the street rather than to the lateral for the main residence. Connecting
to the same lateral that the main residence uses would require pumping the
sewage. A separate connection is preferred in this case since the use of a pump is
generally considered to be less reliable than gravity flow.
Trees
The applicant is not proposing to remove any of the numerous pines on the
property. The accessory building has generally been designed to use the trees as
a screen from the neighbors. Therefore,the health of the trees is an important
aspect of the project. A number of these pine trees seem to be unhealthy and
staff has added a condition that the trees be inspected and treated by a certified
arborist prior to acceptance of plans for building plan check,(see condition 12).
In addition, all mature trees are required to be fenced at the dripline during the
Planning Commission
October 25, 1995
Lands of Teng
Page 4
construction(see condition 9) to ensure the health of the trees is not affected
during construction.
Recommendations
The Town Geologist,William Cotton and Associates,has reviewed the plans and
geotechnical report and has recommended conditions which have been
incorporated into the attached conditions of approval (see condition 2).
The Pathways Committee has no request for this project. The Environmental
Design Committee has not responded with any conditions of approval for this
project.
Staff is available to answer any questions that the Commission or community
may have.
ATTACHMENTS:
1. Recommended conditions of approval;
2. Worksheet#2;
3. Letter from applicant's architect dated October 12,1995;
4. Letter from William Cotton&Associates dated September 29, 1995;
5. Development plans.
cc: Mr. Peter Teng Greg Benton,Architect
25420 Crescent Lane 5546 Harvard Drive
Los Altos Hills,CA 94022 San Jose, CA 95118
•
Planning Commission
October 25, 1995
Lands of Teng
Page 5
ATTACHMENT 1
RECOMMENDED CONDITIONS FOR
SITE DEVELOPMENT PERMIT
LANDS OF TENG,25420 CRESCENT LANE (file#154-95-ZP-SD-GD)
A. PLANNING DEPARTMENT:
1. Any modifications to the approved plans shall be reviewed and
approved by the Planning Director or the Planning Commission,
depending on the scope of the changes.
.. i
2. As recommended by William Cotton & Associates in their report
dated September 29, 1995; the applicant shall comply with the
following:
a. The applicant's geotechnical consultant should comment on
whether currently proposed downspout splash blocks are
acceptable for roof drainage and provide supplemental
geotechnical recommendations to address the potential for
uplift pressures from expansive solids on grade beams as
deemed necessary. The consultant shall also review and
approve all geotechnical aspects of the development plans to
ensure that his recommendations have been properly
incorporated. This condition shall be completed prior to
issuance of building permits;
b. The applicant's geotechnical consultant shall inspect,test(as
needed), and approve all geotechnical aspects of the project
construction. The inspections should include,but not be
limited to: site preparation and grading,site surface and
subsurface drainage improvements,and excavations for
foundations prior to the placement of steel and concrete.
The results of these inspections and the as-built conditions of
the project shall be described by the geotechnical consultant
in a letter and submitted to the Town Engineer for review
prior to final inspection.
For further details on the above requirements, please refer to the
letter from William Cotton&Associates dated September 29, 1995.
3. Paint colors shall be chosen by the applicant and approved by staff
in conformance with the Town's adopted color board, and shall
exhibit a light reflectivity value of 50 or less. Roofs shall use
Planriing Commission
October 25, 1995
Land of Teng
Page 6
materials which have a light reflectivity value of 40 or less. White
trim area should be minimized,particularly on large surfaces such
ass doors,columns,railings, and trellises. A color sample shall be
submitted to the Planning Department for approval prior to
painting of the exterior of the residence. All applicable structures
shall be painted in conformance with the approved color(s)prior to
final inspection.
4. Subsequent to final framing of the residence, a landscape screening
and erosion control plan shall be reviewed by the Site Development
Committee. Particular attention shall be given to plantings which
will be adequate to break up the view of the new residence from
surrounding properties and streets. All landscaping required for
screening purposes or for erosion control (as determined by the
City Engineer) must be installed prior to final inspection,unless the
Planning Director finds that unusual circumstances,such as
weather or site condition,require that planting be delayed. In those
instances, a deposit of an amount equal to the cost of landscape
materials and installation,to the satisfactions of the Planning
Director, shall be submitted to the Town. Landscaping shall in any
event be installed not later than 6 months after final inspection,or
tilt deposit will be forfeited.
5. A landscape maintenance deposit(or certificate of deposit),equal to
the cost of materials and installation for all landscaping required
for screening purposes or for erosion control (as determined by the
City Engineer),but not to exceed$5,000.00,shall be posted prior to
final inspection. An inspection of the landscape to ensure adequate
establishment and maintenance shall be made two years after
installation. The deposit will be released at that time if the
plantings remain viable. l
6. Skylights shall be designed to reduce emitted light and no lighting
shall be placed in skylight wells.
7. Any outdoor lighting not shown on the plans requires approval by
the Planning Department prior to installation. Lighting shall be
down shielded,low wattage, and shall not encroach or reflect on
adjacent properties. The source of the lighting shall not be visible
frostn off the site. Light fixtures must be approved by the Planning
Department prior to installation. No lighting may be placed within
setbacks except for two driveway or entry lights.
8. Fire retardant roofing is required for the accessory building. •
Planning Commission
October 25, 1995
Lands of Teng
Page 7
9. Prior to beginning any grading operation, all significant trees are to
be fenced at the drip line. The fencing shall be of a material and
structure to clearly delineate the drip line. Town staff must inspect
the fencing and the trees to be fenced prior to commencement of
grading. The property ownler shall call for said inspection at least
three days in advance of the inspection. The fence must remain
throughout the course of construction. No storage of equipment,
vehicles or debris shall be allowed within the drip lines of these
trees.
10. At the time of foundation inspection for the cabana and prior to
final inspection for grading!and hardscape improvements,the
location and elevation of the cabana and decking shall be certified
in writing by a registered civil engineer or licensed land surveyor
as being in/at the approved location and elevation shown on the
approved Site Development plan. At the time of framing
inspection for the cabana,the height of the building shall be
similarly certified as being at the height shown on the approved
Site Development plan.
11. A deed restriction shall be recorded stating that the accessory
building may not include kitchen facilities,may not be
converted/utilized as a secondary unit, and may not be rented.
The Planning Department will prepare the deed restriction and the
signed,notarized document shall be returned to the Town prior to
acceptance of plans for building plan check.
12. Prior to the acceptance of plans for building plan check, the applicant
shall submit a letter from a certified arborist stating that the mature
pine trees along the east property line have been inspected and
treated (as needed).
13. The applicant shall provide access to the concrete slab located to the
west of the garage to utilize the space as a required parking area. A
revised plan and a revised Worksheet#2 reflecting this change,
shall be submitted to the town prior to acceptance of plans for building
plan check.
Planning Commission
October 25, 1995
Lands of Teng
Page 8
B. ENGINEERING DEPARTMENT:
14. The site drainage associated with the proposed development must
be designed as surface flow wherever possible to avoid
concentration of the runoff. The proposed drainage shall be
designed to maintain the existing flow patterns. Final drainage
and grading shall be inspected by the Engineering Department and
any deficiencies corrected to the satisfaction of the Engineering
Department prior to final inspection.
15. Any, and all, changes to the approved grading and drainage plan
shall be submitted as revisions from the project engineer and shall
first be approved by the Town Engineering Department. No
grading shall take place during the grading moratorium between
November 1 and.April 1 except with prior approval from the City
Efigineer. No grading shall take place within ten feet of any
property line.
16. All new public utility services serving ;this property shall be
uridergrounded.
17. Two copies of a grading and construction 'operation plan shall be
submitted by the property owner for review and approval by the
City Engineer and Planning Director prior to acceptance of plans for
b Uilding plan check. The grading/construction plan shall address
truck traffic issues regarding dust, noise, and vehicular and
pedestrian traffic safety on Crescent Lane and surrounding
roadways; storage of construction materials; placement of sanitary
failities; parking for construction vehicles; and parking for
constructionpersonnel. A debris box (trash dumpster) shall be
plaPced on site for collection of construction debris. Arrangements
must be made with the Los Altos Garbage Company for the debris
bdx, since they have a franchise with the Town and no other hauler
is allowed within the Town limits.
' I
18. The property owner shall inform the Town of any damage and
shall repair any damage caused by the construction of the project to
pathways, private driveways, and public and private roadways,
prior to final inspection and release of occupancy permits and shall
provide the Town with photographs of the existing conditions of
the roadways and pathways prior to acceptance of plans for building
plincheck.
19. The cabana shall be required to connect to.sanitary sewer service
prior to final inspection. The required fees shall be paid to the City of
Planning Commission
October 25, 1995
Lands of Teng
Page 9
Los Altos and a copy of the receipt shall be submitted to the Town
prior to acceptance of plans for building plan check.
20. Upon completion of construction,a final inspection shall be set
with the Planning Department and Engineering Department at least
two weeks prior to final buiilding inspection approval.
CONDITION NUMBERS 11,12,13,17,18,AND 19 SHALL BE COMPLETED
AND SIGNED OFF BY THE PLANNING DIRECTOR AND THE CITY
ENGINEER PRIOR TO ACCEPTANCE OF CONSTRUCTION PLANS FOR
PLAN CHECK BY THE BUILDING DEPARTMENT.
Properties residing within the Los Altos School District boundaries must pay
School District fees before receiving their building permit from Los Altos
Hills. The applicant must take a copy of Worksheet#2 to both the elementary
and high school district offices,pay the appropriate fees and provide the Town
with a copy of their receipts.
NOTE: The Site Development permit is valid for one year from the approval
date (until October 25, 1996). All required building permits must be obtained
within that year and work on items not requiring a building permit shall be
commenced within one year and completed within two years.
S u -.
TOWN OF LOS ALTOS HILLS
26379 Fremont Road • Los Altos Hills,California 94022 • (415)941-7222 • FAX (415) 941-3160
PLANNING DEPARTMENT
WORKSHEET #2°
EXISTING AND PROPOSED DEVELOPMENT AREA AND FLOOR AREA
® TURN IN WITH YOUR APPLICATION ID
PROPERTY OWNER'S NAME -re 0
PROPERTY ADDRESS 215tt 2.0 C(2 S C-0AT 1--AIN1L
CALCULATED BY MA—Ir 1'11 Y`� \A m) e ,115 s,--L5 DATE
1. DEVELOPMENT AREA (SQUARE FOOTAGE)
Existing Proposed Total -
(Additions or Deletions)
A. House and Garage (from Part B) Lk it C GJ 4-I QS
B. Decking g 90
C. Driveway and Parking !,��
(Measured 100' along centerline) . 7 g w
D. Patios and Walkways 214 3 (p 450 2,°440
E. Tennis Court
F. Pool and Decking 1,9E3 t 1' 9, l
G. Accessory Buildings (from Part B) 1 Ct (;31 b 11391
H. Any other coverage ►P `l lD ., i, oily,
TOTALS \23 M _ (,00 14• egg ,
Maximum Development Area Allowed - MDA (from Worksheet #1) It--- ._____(3 a 5
P _ 1 5, o eDC
2. FLOOD AREA (SQUARE FOOTAGE Existing Proposed Total
- (Additions or Deletions)
A. House and Garage
a. 1st Floor Lilt Q4,6 4 VA6
b. 2nd Floor
c. Attic and Basement --
B. Accessory Buildings -
a. 1st Floor _.......1-9,-- \0)0 1 i;
b. 2nd Floor
c. Attic and Basement an.. 1
TOTALS 42;1 1-I' 1,2{105, —S�'�`
Maximum Floor Area Allowed - MFA (from Worksheet #1) +�ja? ` ' (,` j
li 1/!�1Gl .
i •WN US • •NLY CHECKED BY In
Revised 12/09/Y1 LDA. MAC HD/ORICINALS/PLANNING/Worksheet 12
I
Greg W. Benton, Architect
5546 Harvard Drive CEI►r'Ep
San Jose, California 95118
(408) 267-6412
October 12, 1995
Town of Los Altos Hills
Planning Commission
26379 Fremont Road
Los Altos Hills, California 94022
RE: Teng Accessory Building
25420 Crescent Lane
Commission Members,
I am writing this letter at the request of the owners of the above mentioned project for which I
am the Project Architect and which was submitted to the Town for project review in August of
this year. It is my understanding the project requires Planning Commission review because
we are proposing a building addition in excess of 900 sq. ft. and over 15' in height.
On October 3, the owner and myself met with Susan Manca and Curtis Williams to discuss
concerns expressed by project neighbors and I* Curtis about the size and use of the
building. Since notices about the project had not been sent out yet, we appreciated Susan
and Curtis telling us about the concerns. It is my hope that the commission will consider the
following when addressing those concerns:
1. In regards to the size, the proposed desig y is now well under the area allowed by
ordinance and we feel it is compatibly proportioned with the main house. Originally the
owner desired 2-stories to conserve land space and a larger floor area much closer to
the allowable limit to meet his needs. We presented that design to the neighbor closest
to the project through drawings, story-poles and meetings. After listening to the
neighbors concerns about that design, the; owner compromised his needs and we
prepared the simpler design currently submitted. Since our story poles for the original,
larger design have remained in place from June 23 untill now, it is very understandable
for neighbors to think the project is larger than the current design and possibly be
concerned. We had not planned on revising the story poles to match the current design
untill we were scheduled for the commission meeting and now regret if neighbors were
given the wrong impression about the size of the project.
We are proposing this size building as thea minimum size and number of rooms needed,
in conjunction with the main house, to accomodate the owner's family . The size and
character of these rooms are not available in the main house without extensive
remodeling work and disruption of lifestyle. The placement of this additional building
area makes use of an existing deck and serves to "frame" the yard around the pool,
giving it focus and making the yard more private from neighbors.
Teng Cabana
j 10/12/95 Page 2
2. In regards to the use of the building, a concern was expressed that the plan appears too
similar to a secondary dwelling. I am aware their are usually extra concerns and
requirements for a secondary dwelling and, since the owners never intended such a
use, I researched the Town's definitions with due diligence at the very beginning of the
project. I was tol , that since we do not need, and are not providing eating and cooking
facilities'.in this building it would not be a secondary dwelling. Our intent is to only
provide sleeping, storage and part-time living rooms subordinate to the main house as
in the definition for an accessory structure. On that basis, we proceeded with the site
survey, design work, neighbor meetings, story poles, geology report, application and
Town submittal. If we were told by the Town that the rooms we wanted could be
construed, separately from the letter of the ordinance, to define this building as a
secondary unit then we would not have started the project. j secondary unit is not our
intent nor are the requirements of such a proposal reasonably obtainable on this site.
If their is concern about illicit conversion of this accessory structure to a secondary
dwellings in the futilrre, I have experienced similar projects, in other city and the County
jurisdictions having similar definitions, that require attachments to the deed of the project
property;restricting the use of the accessory structure. The;owner has expressed such a
restriction would not be a problem to him if it would satisfy that concern of the Town and I
assume this procedure has had reasonable success in the other jurisdictions. If
needed, I can obtain a sample restriction from another project for your review and
consideration as t obtion for this project.
I hope that this information is helpful in removing the concerns mentioned. It is our sincere
intention to complete this project in a manner that is consistant with the ordinances of the
Town and sensitive to both the needs of the owner and the neighborhood. We are happy to
discuss these or any concerns you may have before approving this project so please do not
hesitate to call.
Sincer ly, .
i
G eg W. Benton {,
Project Architect
GEOTECHNICAL CONSULTANTS
*T. �, 330 Village Lane
William Cotton Los Gatos, California 95030
and Associates (408) 354-5542
September 13, 1995
L3085
TO: Susan Manca
Planner
TOWN OF LOS ALTOS HILLS
26379 Fremont Road ReC
Los Altos Hills, California 94022 E///kCD
SUBJECT: Geotechnical Review
rO*NQF1
RE: Teng Accessory Building
File #154-95-ZP-SD-GD ��iso
25420 Crescent Lane
At your request, we have completed a geotechnical review of permit applicants
for the proposed cabana using:
• Geotechnical Investigation (report) prepared by Freeman-Kern
Associates, dated June 27, 1995; and
• Site Grading Plan, Floor Plan and Cabana Elevations (5 sheets, 4-, 8-
and 20-scales) prepared by Greg W. Benton, dated August 18, 1995.
In addition, we have completed a recent site inspection from the southern
perimeter of the property and reviewed pertinent technical documents from our office
files.
DISCUSSION
The applicant proposes to construct a cabana approximately 50 feet southeast
of the existing house. The referenced plans indicate that minor grading is proposed,
totaling 18 cubic yards of cut and 78 cubic yards of fill. Proposed grading would result
in placement of fill under the southern portion of the proposed structure and we
understand that a pier and grade beam foundation option will be utilized for the
structure in accordance with recommendations of the project geotechnical consultant.
SITE CONDITIONS
T'ne proposed constriction site is generally by level to
1, p generally characterized relatively
gentle (3° - 5° inclination) south-facing slopes. Drainage is characterized by sheet flow
to the south ultimately intercepted along Elena Road.
The Town Geologic Map indicates that the property is underlain, at depth, by
bedrock materials of the Franciscan Complex. The project geotechnical consultant has
concluded that deposits similar to the Santa Clara Formation were encountered in
exploratory borings at the site and Franciscan bedrock should be present at depth. We
note that the property is located near a mapped deposit of older alluvium and that this
material may possibly extend onto the subject property. Local bedrock materials are
mantled by relatively soft, potentially expansive silty to gravelly clay (soil, colluvium,
alluvium and artificial fill materials). A mapped trace of the potentially active Monta
Vista fault is located approximately 660 feet south of the proposed construction site.
ENGINEERING GEOLOGY • ENVIRONMENTAL EARTH SCIENCES • FOUNDATION ENGINEERING
Susan Manca September 13, 1995
Page 2 L3085
i
CONCLUSIONS AND RECOMMENDED ACTION
The proposed construction appears to be primarily constrained by an existing,
relatively soft layer of silty to sandy clay within approximately four feet of the ground
surface. It appears that the proposed structure should gain support beneath the
proposed fill and beneath this upper layer of relatively soft ground. We recommend
geotechnical approval of the proposed cabana construction with the following
conditions. The pier and grade beam foundation alternative presented by the project
geotechnical consultant should be utilized for the proposed cabana. Condition 1 should
be addressed prior'to issuance of building permits.
1. Geotechnical Plan Review - The applicant's geotechnical consultant
should comment on whether currently proposed downspout splash
blocs are acceptable for roof drainage and provide supplemental
geotechnical recommendations to address the potential for uplift
pressures from expansive soils on grade beams as deemed necessary.
The(consultant shall also review and approve all geotechnical aspects
of the development plans (i.e., site preparation and grading, site
drainage improvements and design parameters for foundations) to
ensure that his recommendations have been properly incorporated.
The results of the plan review should be summarized by the
geotechnical consultant in a letter and submitted to the Town Engineer
for review and approval prior to issuance of building permits.
2. Geotechnical Field Inspection - The geotechnical consultant shall
inspect, test (as needed), and approve all geotechnical aspects of the
project construction. The inspections should include, but not
necessarily be limited to: site preparation and grading, site surface
and subsurface drainage improvements, and excavations for
foundations prior to the placement of steel and concrete.
The results of these inspections and the as-built conditions of the
project shall be described by the geotechnical consultant in a letter
sand submitted to the Town Engineer for review prior to final (as-
- built) project approval.
Respectfully submitted,
WILLIAM COTTON AND ASSOCIATES, INC.
TOWN GEOTECHNICAL CONSULTANT
Ted Sayre
Seni,r Engineering Geologist
(/( /
William R. Cotton
Principal Engineering Geologist
CEG 882
WRC:TS:rb
William Cotton and Associates