Loading...
HomeMy WebLinkAbout01-06 • • RESOLUTION No. 1-06 A RESOLUTION OF THE CITY COUNCIL OF THE TOWN OF LOS ALTOS HILLS ADOPTING A REVISED FEE SCHEDULE TO BE EFFECTIVE ON JANUARY 13,2006 WHEREAS, Council has directed staff to prepare a resolution waiving building, plumbing, electrical permit fees for the construction or installation of solar energy generation equipment; NOW THEREFORE, the City Council of the Town of Los Altos Hills does hereby approve and adopt the attached revised schedule of"Fees,Deposits, Charges es for Services, and Other Assessments (Attachment I)." FURTHER RESOLVED that the attached revised schedule of"Fees,Deposits, Charges for Service and Other Assessments" will become effective on January 13, 2006. REGULARLY PASSED AND ADOPTED this 12th day January, 2006. BY: ayor ATTES. : City Clerk -` • • •' Town of Los Altos Hills Schedule of Fees,Deposits,Charges for Service,and Other Assessments Effective January 2,2006 Rates effective January2,2006 Category/Process AMOUNT OF Item/Description • Fee 1 Deposit Decks $12 per square foot Permit fee: Projects other than small projects $130 plus.51%of the valuation Permit fee: Small projects(satellite dishes,decks less than 200 square feet,sheds less than 200 square feet,window replacements,deck repairs,gazebos,chimney repairs,fences less than 200 lineal feet)or other small projects approved by the City Manager $85 Solar Energy Generation Equipment $0 Bedroom $80 per bedroom Plus(depending on valuation) $1 to$2,000 $60 $2,001 and up $135 plus.51%of the valuation Plan review fee 65%of permit fee Plan retention fee $13 per page of plans Final deposit-based on total valuation Less than$10,000 $110 $10,000 or more 1%of the valuation Site development compliance inspection-collected at building plan submittal stage and required only when project is based on a site development permit $590 Roadway impact fee For permit valuations at or above$10,000: .63%of valuation Energy fee (state imposed) Any new dwelling or habitable addition to an existing dwelling 15%of building permit Formula=1.65 x(.15 x building permit fee) • Strong motion instrumentation program(state imposed) $.10 per$1,000 of assessed valuation 4 Other inspections and plan reviews A requested inspection,when no permit is needed $135per hour Outside normal business hours $135 per hour,with a 2-hour minimum Reinspection $135per hour Inspection for which no fee is otherwise indicated $135per hour Additional plan reviews $135per hour Code compliance inspection and letter $135per hour 5 Electrical permits e.g.,panel,service change,repair,landscape lighting,wiring and material per 1990 NEC New homes and additions are more than the minimum fees Issuance fee $55 Permit fee-new residential structures $.10/sq ft of total square footage 6 Plumbing permits e.g.,water heater,waterline change/repair per 30.1 UPC Issuance fee $55 Permit fee-new residential structures $.10/sq ft of total square footage Page 4