Loading...
HomeMy WebLinkAbout55-18 RESOLUTION 55-18 A RESOLUTION OF THE CITY COUNCIL OF THE TOWN OF LOS ALTOS HILLS AWARDING A CONTRACT FOR CONSTRUCTION OF THE 2018 PAVEMENT REHABILITATION AND DRAINAGE IMPROVEMENT PROJECT WHEREAS, the Public Works Director/City Engineer of the Town of Los Altos Hills did, in open session, duly examine and consider all bids submitted to it for the construction of the 2018 Pavement Rehabilitation and Drainage Improvement Project. WHEREAS, the Public Works Director/City Engineer recommends that the contract for said project be awarded to the lowest responsible bidder, O'Grady Paving Inc., for the amount of $1,362,873.15; NOW,THEREFORE, BE IT RESOLVED by the City Council of the Town of Los Altos Hills that; I. The City Manager is hereby authorized and directed to execute a contract to the above- named firm on behalf of the Town of Los Altos Hills. 2. The Public Works Director is hereby authorized to approve potential contract change orders in an amount not to exceed$90,000. 3. The City Manager is hereby authorized to execute necessary contracts with consulting/inspection firms for inspection and testing services in an amount not to exceed $50,000. The above and foregoing Resolution was passed and adopted by the City Council of the Town of Los Altos Hills at a regular meeting held on 19th day of July, 2018 by the following vote: AYES: Radford, Spreen, Corrigan, Waldeck,Wu NOES: None ABSTAIN: None ABSENT: None By: /."ohn Radford, Mayor ATTEST: Deborah L. Padovan, City Clerk Resolution 55-I8 Page 1 2018 Pavement Rehabilitation and Drainage Improvement Project Street From To Street Type of Work Length (Feet) Alejandro Drive St. Francis Road End 294 Microsurfacing Altamont Road Black Mountain Road Taaffe Road 2,979 Microsurfacing Ascension Drive St. Francis Road End 630 Microsurfacing Byrne Park Lane Altamont Road w.of 27269 Byrne Park Lane 1,050 2"A.C. Overlay De Bell Road Manuella Road Estacada Drive 1,750 Microsurfacing Deer Springs Way Byrne Park Lane End 1,170 4" A.C. Remove and Replace Edgerton Road Black Mountain Road End 1,800 Microsurfacing El Monte Road Moody Road Foothill College Entrance 1,890 1.5"A.C. Overlay Emerald Hill Lane Prospect Avenue End 450 2"A.C. Overlay Fremont Road St.Francis Road Concepcion Road 1,250 2"A.C. Overlay Julietta Lane S. of 27340 Julietta Lane End 400 Microsurfacing La Cresta Court La Cresta Drive End 870 Microsurfacing La Loma Court La Loma Drive End 315 4" A.C. Remove and Replace La Loma Drive Prospect Avenue Summit Wood Road 1,495 4" A.C. Remove and Replace Natoma Road Elena Road Black Mountain Road Utility Trench Settlement Repair O'Keefe Lane 350' w. of Vista Serena End 930 Microsurfacing Page Mill Road Balari Ranch Road Country Way 3,518 1.5"A.C. Overlay Purissima Road Concepcion Road Robleda Road 2,325 Microsurfacing Ravensbury Avenue Hillpark Lane End 2,700 2"A.C. Overlay Roble Veneno Lane Concepcion Road End 330 Microsurfacing Seven Acres Lane Fremont Road End 310 2"A.C. Overlay Viscaino Place Viscaino Road End 360 Microsurfacing TOTAL 26,816 TOTAL MILES OF 61.4 TOTAL MILES FOR 5.1 PERCENTAGE 8.3% PUBLIC ROAD PROJECT Microsurfacinn A thin maintenance treatment mixture of polymer modified emulsion,graded aggregates,mineral filler,water, additives. Approximately 5-year life span. 1.5"&2"A.C.Overlay Pave an additional 1.5"or 2"of asphalt concrete over existing road surface.Approximately 12 to 15-year life span. 4"Full grind and replacement Remove 4"of pavement section and replace with 4"of asphalt concrete pavement.Approximately 20-year life span. Utility trench settlement repair Remove failed pavement section,recompact road base,and replace with 6"asphalt concrete pavement(localize repair). Resolution 55-IB Page 2