HomeMy WebLinkAbout55-18 RESOLUTION 55-18
A RESOLUTION OF THE CITY COUNCIL OF THE
TOWN OF LOS ALTOS HILLS AWARDING A CONTRACT FOR CONSTRUCTION
OF THE 2018 PAVEMENT REHABILITATION AND DRAINAGE IMPROVEMENT
PROJECT
WHEREAS, the Public Works Director/City Engineer of the Town of Los Altos Hills did, in
open session, duly examine and consider all bids submitted to it for the construction of the 2018
Pavement Rehabilitation and Drainage Improvement Project.
WHEREAS, the Public Works Director/City Engineer recommends that the contract for said
project be awarded to the lowest responsible bidder, O'Grady Paving Inc., for the amount of
$1,362,873.15;
NOW,THEREFORE, BE IT RESOLVED by the City Council of the Town of Los Altos Hills
that;
I. The City Manager is hereby authorized and directed to execute a contract to the above-
named firm on behalf of the Town of Los Altos Hills.
2. The Public Works Director is hereby authorized to approve potential contract change
orders in an amount not to exceed$90,000.
3. The City Manager is hereby authorized to execute necessary contracts with
consulting/inspection firms for inspection and testing services in an amount not to exceed
$50,000.
The above and foregoing Resolution was passed and adopted by the City Council of the Town of
Los Altos Hills at a regular meeting held on 19th day of July, 2018 by the following vote:
AYES: Radford, Spreen, Corrigan, Waldeck,Wu
NOES: None
ABSTAIN: None
ABSENT: None
By:
/."ohn Radford, Mayor
ATTEST:
Deborah L. Padovan, City Clerk
Resolution 55-I8 Page 1
2018 Pavement Rehabilitation and Drainage Improvement Project
Street From To Street Type of Work
Length
(Feet)
Alejandro Drive St. Francis Road End 294 Microsurfacing
Altamont Road Black Mountain Road Taaffe Road 2,979 Microsurfacing
Ascension Drive St. Francis Road End 630 Microsurfacing
Byrne Park Lane Altamont Road w.of 27269 Byrne Park Lane 1,050 2"A.C. Overlay
De Bell Road Manuella Road Estacada Drive 1,750 Microsurfacing
Deer Springs Way Byrne Park Lane End 1,170 4" A.C. Remove and Replace
Edgerton Road Black Mountain Road End 1,800 Microsurfacing
El Monte Road Moody Road Foothill College Entrance 1,890 1.5"A.C. Overlay
Emerald Hill Lane Prospect Avenue End 450 2"A.C. Overlay
Fremont Road St.Francis Road Concepcion Road 1,250 2"A.C. Overlay
Julietta Lane S. of 27340 Julietta Lane End 400 Microsurfacing
La Cresta Court La Cresta Drive End 870 Microsurfacing
La Loma Court La Loma Drive End 315 4" A.C. Remove and Replace
La Loma Drive Prospect Avenue Summit Wood Road 1,495 4" A.C. Remove and Replace
Natoma Road Elena Road Black Mountain Road Utility Trench Settlement Repair
O'Keefe Lane 350' w. of Vista Serena End 930 Microsurfacing
Page Mill Road Balari Ranch Road Country Way 3,518 1.5"A.C. Overlay
Purissima Road Concepcion Road Robleda Road 2,325 Microsurfacing
Ravensbury Avenue Hillpark Lane End 2,700 2"A.C. Overlay
Roble Veneno Lane Concepcion Road End 330 Microsurfacing
Seven Acres Lane Fremont Road End 310 2"A.C. Overlay
Viscaino Place Viscaino Road End 360 Microsurfacing
TOTAL 26,816
TOTAL MILES OF 61.4 TOTAL MILES FOR 5.1 PERCENTAGE 8.3%
PUBLIC ROAD PROJECT
Microsurfacinn
A thin maintenance treatment mixture of polymer modified emulsion,graded aggregates,mineral filler,water,
additives. Approximately 5-year life span.
1.5"&2"A.C.Overlay
Pave an additional 1.5"or 2"of asphalt concrete over existing road surface.Approximately 12 to 15-year life span.
4"Full grind and replacement
Remove 4"of pavement section and replace with 4"of asphalt concrete pavement.Approximately 20-year life span.
Utility trench settlement repair
Remove failed pavement section,recompact road base,and replace with 6"asphalt concrete pavement(localize
repair).
Resolution 55-IB Page 2