HomeMy WebLinkAbout3.1 •
ITEM 3.1
TOWN OF LOS ALTOS HILLS March 5, 2015
Staff Report to the Planning Commission
SUBJECT: A REQUEST FOR A SITE DEVELOPMENT PERMIT OF A LANDSCAPE
SCREENING PLAN FOR A TWO STORY NEW RESIDENCE; LANDS OF
KAVEH; 12815 VISCAINO ROAD; FILE # 382-14-ZP-SD (CONTINUED
FROM FEBRUARY 5, 2015)
FROM: Nicole Horvitz, Assistant PlanneA
APPROVED: Suzanne Avila, AICP, Planning Director Si*
RECOMMENDATION: That the Planning Commission:
Approve the requested Site Development Permit for a landscape screening plan, subject to the
recommended Conditions of Approval in Attachment 1.
BACKGROUND
A new two story residence with a basement, and a swimming pool was approved at the February
19, 2013 Fast Track hearing (Site Development Permit # 150-12-ZP-SD-GD). The landscape
screening application was forwarded to the Commission for review due to neighbor concerns.
At the February 5, 2015 the Planning Commission continued the landscape screening application
to give the neighbor at 12840 Viscaino Road(Lands of Reddy) an opportunity to testify before the
Commission.
The February 5,2015 Planning Commission staff report is included in Attachment 2 for reference.
Proposed Landscape Screening
Since the February Planning Commission meeting the applicant has amended the plans to include
the following screening plantings:
Common Name Size Quantity Height at Height at
installation maturity
Dwarf Fruitless Olive 24" Box (STD) 1 3'-4' 16'
Dwarf Olive 24"Box (NLB) 12 3'-4' 16'
Wilson Fruitless Olive 24"Box (NLB) 3 4'-5' 25'-30'
Dwarf Carolina Cherry 15 Gallon 18 2'-3' 8'-12'
*STD=standard
*NLB=natural low branch
Staff Report to the Planning Commission
Lands of Kaveh
12815 Viscaino Road
March 5,2015
Page 12
Proposed plantings that will help mitigate the front elevation of the new residence from off site are
shown in the diagram below.
h . 4' / --- \L'..- ^-':':-.S:4''.-7:- -CM ' \ \ '1 „/ 1
! , i yr1 ��e i
I
r1( ' :'..1 ''."''!..'Y' \. \'.,':'.. ,,,,°1 6,':.. '''' 'thed ,F,O.*:;'.1.'2...... t
� � i
- : t ` ! /�
— r� - _„. � :::live s /
xR
_ olive
,1 [ —1 ' ..,---.--..._-_:__., -,......4,., -,ili4.0 ...;__ 2A,,:,-= ,,2„0"'''-"k,:/* .... ,.• • '•,,
\ .. --- y?.. a v` .
\_,) • _.- ...>' '4;!::.2,;::'::';'4.:'- '7::' ' ''',1 c '(tk'''1,,,...<`, : ' ' / •
:'`,: /
olive �— - F j="/
'''' \--- - ,Irg•'3-laT'jar~_�/ ' '' i'
The applicant met with Mr.Reddy and agreed to install six(6)-36"box olive trees on his property.
Mr. Reddy will irrigate and maintain the trees after installation(Condition#4.)
CEQA STATUS
This project is exempt from California Environmental Quality Act (CEQA) pursuant to Section
15304 (b) of the CEQA Guidelines.
ATTACHMENTS
1. Recommended Conditions of Approval
2. Staff report from the February 5, 2015 Planning Commission meeting
3. Site Development Plans
Staff Report to the Planning Commission ATTACHMENT 1
Lands of Kaveh
12815 Viscaino Road
March 5,2015
Page 3
ATTACHMENT 1
RECOMMENDED CONDITIONS FOR SITE DEVELOPMENT PERMIT
FOR A LANDSCAPE SCREENING
LANDS OF KAVEH, 12815 Viscaino Road
File#382-14-ZP-SD
PLANNING DEPARTMENT:
1. No other modifications to the approved plans are allowed except as otherwise first reviewed
and approved by the Planning Director or the Planning Commission, depending on the scope
of the changes.
2. A Certificate of Completion shall be prepared by the project Landscape Architect, Irrigation
Designer,or Landscape Contractor,provided to the Town,and include the following statement:
"The landscape and irrigation system has been installed as specified in the landscape design
plan and complies with the criteria of the Water Efficient Landscape Ordinance and the
permit." The Certificate of Completion shall be submitted at completion of landscape
installation(not required prior to final inspection).
3. A landscape maintenance and water use deposit of$5,000.00 shall be posted prior to final
inspection of the new residence. An inspection of the screening plantings to ensure adequate
establishment and maintenance shall be made two years after installation. Prior to deposit
release, the property owner shall also furnish to the Town the second year (months 13-24
following receipt of the Certificate of Completion) of water use and billing data from the
subject property's water purveyor. If the site water usage exceeds the calculated PWB, the
deposit will be held for an additional 12 months.At the end of the additional 12 month period,
the property owner shall provide the Town with the previous 12 months (months 25-36) of
water use and billing data from the subject property's water purveyor. If the water usage still
exceeds the estimated PWB, the deposit shall be forfeited to the Town, in full. All Town staff
time and materials expended to ensure compliance with this section will be deducted from the
deposit.
4. The applicant shall purchase and install six (6) — 36" box olive trees on the neighboring
property at 12840 Viscaino Road (Lands of Reddy) prior to final inspection of the new
residence. The owner of 12840 Viscaino Road shall be responsible to maintain and irrigate the
trees.
5. Prior to beginning any grading operation, all significant trees, particularly the heritage oak
trees, are to be fenced at the drip line. The fencing shall be of a material and structure (chain-
link) to clearly delineate the drip line. Town staff must inspect the fencing and the trees to be
fenced prior to commencement of grading. The property owner shall call for said inspection at
least three days in advance of the inspection. The fencing must remain throughout the course
Staff Report to the Planning Commission
Lands of Kaveh
12815 Viscaino Road
March 5,2015
Page 14
of construction. No storage of equipment, vehicles or debris shall be allowed within the drip
lines of these trees. Existing perimeter plantings shall be fenced and retained throughout the
entire construction period.
6. No new fencing is approved. Any new fencing or gates shall require review and approval by
the Planning Department prior to installation.
7. Walkways within the property line setbacks shall not exceed a width of 4'.
8. Outdoor lighting is approved as shown on the lighting plan. No up lights are approved. No
lighting may be placed within setbacks except two entry or driveway lights. Any additional
outdoor lighting shall be approved by the Planning Department prior to installation.
ENGINEERING DEPARTMENT:
9. Any revisions or additions to the previously approved grading and drainage plan shall be
submitted for review by the Engineering Department. The plan shall be reviewed by the
Engineering Department and approved prior to commencement of this project. The approved
plan shall be stamped and signed by the project engineer and shall supersede the previously
approved drainage plan.
10. No grading shall take place during the grading moratorium (October 15 and April 15) except
with prior approval from the City Engineer. No grading shall take place within ten feet of any
property line.
11. Any, and all,areas on the project site that have the native material disturbed shall be protected
for erosion control during the rainy season and shall be replanted prior to final inspection.
12. All irrigation systems must be located at least five feet from the Town's pathways and outside
of the public right of way and public utility easements. The Town staff shall inspect the site
and any deficiencies shall be corrected to the satisfaction of the Engineering Department prior
to final inspection.
Project approval may be appealed if done so in writing within 22 days of the date of this approval.
The building permit cannot be issued until the appeal period has lapsed. The applicant may submit
construction plans to the Building Department after the appeal period is over provided the
applicant has completed all conditions of approval required prior to acceptance of plans for
building plan check.
THE APPLICANT SHALL OBTAIN ALL REQUIRED BUILDING PERMITS PRIOR TO
COMMENCEMENT OF WORK.
Please refer to the Conditions of Project Approval set forth herein. If you believe that these
Conditions impose any fees, dedications, reservation or other exactions under the California
Government Code Section 66000, you are hereby notified that these Conditions constitute written
Staff Report to the Planning Commission
Lands of Kaveh
12815 Viscaino Road
March 5,2015
Page 15
notice of a statement of the amount of such fees, and/or a description of the dedications,
reservations, and other exactions. You are hereby further notified that the 90-day approval period
in which you may protest such fees, dedications,, reservations, and other exactions, pursuant to
Government Code Section 66020(a), has begun. If you fail to file a protest within this 90-day
period complying with all of the.requirements of Section 66020, you will be legally barred from
later challenging such exactions
NOTE: The Site Development permit is valid for one year from the approval date (until March 5,
2016). All required building permits must be obtained within that year and work on items not
requiring a building permit shall be commenced within one year and completed within two years.
ATTA5KNRIT 2
TOWN OF LOS ALTOS HILLS February 5, 2015
Staff Report to the Planning Commission
SUBJECT: A REQUEST FOR A SITE DEVELOPMENT PERMIT OF A LANDSCAPE
SCREENING PLAN FOR A:TWO STORY NEW RESIDENCE; LANDS OF
KAVEH; 12815 VISCAINO ROAD;FILE# 382-14-ZP-SD
FROM: Nicole Horvitz, Assistant PlannerOV
APPROVED: Suzanne Avila,AICP,Planning Director SA
RECOMMENDATION: That the Planning Commission:
Approve the requested Site Development Permit for a landscape screening,plan, subject to the
recommended Conditions of Approval in Attachment 1.
BACKGROUND
A rieW two story residence•with baSentent, ändá svithi ThV pool Was approved at theFebruary
19, 2013 Fast Traelc,hearing (Site Development.(Periiiit 150-12-ZP-SD-GD). The landscape
screening application has beenforWarded to the'Coininission for review due to neighbor concerns.
CODE REQUIREMENTS. • , ;•
Sections'102.301,.1,0-2.801'ands 10L2.803 of the Site Development Ordinance are used to evaluate
landscape plans to address_erosion, visual_effects, tree preservation, views, and the amount
required to adequately screen the new construction.
: : • ! ! : ) ,;:, ; ;),;. ; .;•.-
DISCUSSION
Site Data:
Net Lot Area: .1.2 acre
Average Slope: 26.25%
Lot Unit Factor: .82
• ;,; .; : '.; , .
Floor and DeyelOpment,Are ,(s9i:larefootage);; •; ,
Area Type ,11(iaxpiini Existing Prop used IneivOs'e Remaining
DevélOpiileiit 8,966* " 8,660 7,722' V -278 V 278
Floor 5,000. 4,9900 0 10
' ' •' Ogsement 2466)
*includes 500 sq.ft. DA bonus per LAHMC Section 10-1.502
!-
-(„
. „
Staff Report to the Planning Commission
Lands of Kaveh
12815 Viscaino Road
February 5,2015
Page 12.
Existing Landscape
The existing landscape consists of toyons, oaks, and pines along the perimeter of the property.
Proposed Landscape Screening
The applicant is proposing 70 screen trees ranging from 15 gallon to 36-inch box size, primarily
along the perimeter of the property. The tree planting list is as follows;
Common Name_ Size Quantity Height at Height at
installation maturity
California Buckeye .15 Gallon 3 3.5' 10'- 20'
Western Redbud 15 Gallon 9 3-4' 25'-40'
Dwarf Olive 36"Box 5 4'-5' 16'
Wilson Fruitless Olive 36"Box 3 4'-5' 20'
Dwarf Carolina Cherry 15 Gallon 44 4'-5' 8'-12'
California Live Oak 24"Box 6 3'-5' 40'
The applicant is also proposing to install 766 various shrubs in different locations on the property.
The new trees and shrubs will soften and screen the new residence from off site.
The Landscape Architect has provided water use calculations demonstrating compliance with
Section 10-2.809 of the Los Altos Hills Municipal Code (Water Efficient Landscape Ordinance).
• Parcel Water Budget(PWB) units per year- 811.74
• Estimated Total Water Use (ETWU) units per year-484.81
Outdoor Lighting
The applicant is proposing to install 27 landscape light fixtures on the property including 20 down
directed path lights, 1 step light, 2 wall lights, and 4 down lights in the proposed trees
Pursuant to Section 10-2.1005 of the Los Altos Hills Municipal Code, "outdoor light sources shall
be shielded so as not to be directly visible from off-site. No more than two (2) lights shall be
allowed in setback areas..." The proposed lighting is in compliance with LAHMC Section 10-
2.1005 and the Town's Outdoor Lighting Policy.
NEIGHBOR CONCERNS
After the new residence began construction, the neighbor at 12840 Viscaino Road (Lands of
Reddy) came forward with privacy concerns. He stated that views from the new residence will
impact his privacy in the kitchen, dining room and from the exterior deck(Attachment 3).
r,_
Staff.Report to the Planning Commission
Lands of Kaveh
12815 Viscaino Road
February 5,2015
Page 13:
,- The applicant is proposing to
i `_ _; ' plant 15 gallon dwarf Carolina
l, /.2`. w: cherries, 36 box dwarf olives
1 ' l ; " and 36"box fruitless olives along
i t t L
,,G L.. # ' f ' Viscaino Road to help mitigate
3 • l ;z„ the view of the new residence
"' ' o e m from off site.
Q,�
<'r -- �'� ' ,l Below are photos taken from the
44 Dwarf Carolina k ''r';`' t new.residence's primary living
cherry ,}`' areas looking towards the Reddy
';. residence.
'''''---------...__I- �`fi, � The applicant has installed
• ;�-. d stakes/poles along the front of the
_;,62:, boa
` _' L ,. -'NASca��°` ;- residence that represent the
-----
View
' location of the screening trees.
View from Lands of Kaveh
}� r am - r. - 11! y?
??ssem� rr ,4 g s t
t,',2,7;-,-..--,,,.0
2 C .y L9 J� �F£ 4 l tty *" S X°
„44 ' ' '1' t?...".":44.- 04,,,4 IN'."‘*,,....!
‘18,
Sc�ry.�' -„�..'” ter- t' S> x"�'R. 't 9s '' sx #' � °i. ,e'' e iia,
!?t iia . <'!a �'c' .a ' ?
Via,,., — .. .te4!...., £ '" * _
ti��, h
", 1, ...,., ,
'yA' 7t f ' V11."-'-;'
a 4� s 1` y:
;, � Co, eems�,,,, �,tr �_�_ `,°, ,.. NY 1�- a��
•rk,
. 4R re,
, t - 4 T s - - J"l Lt: k
From living room -,-.----.„: ,- __ _ From family room
Staff Report to the Planning Commission
Lands of Kaveh
12815 Viscaino Road
Februaiy5,2015
Page 14,
View from Lands of Reddy
¢` <�
• , t�"F Living room ;
• Family � � yyy iJj
yY
room �+'O •^ FA / •;$ .
:c y
•
i
_ k4v' Sar:' . • • ax`�• a n r _
• .."."'"'"'
Ti liNsi obi
From exterior deckFrom dining room
.• '_ >u mimm N •
COMMITTEE COMMENTS
The Environmental Design and Protection Committee noted the proposed screening is well done
(Attachment 4).
CEQA.STATUS
This project is exempt from California Environmental Quality Act (CEQA) pursuant to Section
15304.(b) of the CEQA Guidelines.
ATTACHMENTS
1. Recommended Conditions of Approval
2. Fast Track fact sheet and hearing report dated February 19,2013
3. Email from Raj.Reddy dated January 16, 2015
4. Environmental Design and Protection Committee Comments dated received December 5,2014
5. Site.Development Plans
Staff Report to the Planning Commission ATTACHMENT 1
Lands of Kaveh
12815 Viscaino Road
February 5,2015
Page 15 .
ATTACHMENT 1
RECOMMENDED.CONDITIONS FOR SITE DEVELOPMENT PERMIT
FOR A LANDSCAPE SCREENING
LANDS OF KAVEH, 12815 Viscaino Road
File# 382-14-ZP-SD
PLANNING DEPARTMENT:
1. No other modifications to the approved plans are allowed except as otherwise first reviewed
and approved by the Planning Director or the Planning Commission, depending on the scope
of the changes.
2. A Certificate of Completionshall be prepared by the project Landscape Architect, Irrigation
Designer,or Landscape Contractor,provided to the Town,and include the following statement:
"The landscape and irrigation system has been installed as specified in the landscape design
plan and complies with the criteria of the Water Efficient Landscape Ordinance and the
permit" The Certificate of Completion shall be submitted at completion of landscape
installation (not required prior to final inspection).
3. A landscape maintenance and water use deposit of$5,000.00 shall be posted prior to final
inspection of the new residence. An inspection of the screening plantings to ensure adequate
establishment and maintenance shall be made two years after installation. Prior to deposit
release, the property owner shall also furnish to the Town the second year (months 13-24
following receipt of the Certificate of Completion) of water use and billing data from the
subject property's water purveyor. If the site water usage exceeds the calculated PWB, the
deposit will be held for an additional 12 months. At the end of the additional 12 month period,
the property owner shall provide the Town with the previous 12 months (months 25-36) of
water use and billing data from the subject property's water purveyor. If the water usage still
exceeds the estimated PWB, the deposit shall be forfeited to the Town, in full. All Town staff
time and materials expended to ensure compliance with this section will be deducted from the
deposit.
4. Prior to beginning any grading operation, all significant trees, particularly the heritage oak
trees, are to be fenced at thedrip line. The fencing shall be of a material and structure (chain-
link) to clearly delineate the drip line. Town staff must inspect the fencing and the trees to be
fenced prior to commencement of grading. The property owner shall call for said inspection at
least three days in advance of the inspection. The fencing must remain throughout the course
of construction. No storage of equipment, vehicles or debris shall be allowed within the drip
lines of these trees. Existing perimeter plantings shall be fenced and retained throughout the
entire construction period.
5. No new fencing is approved. Any new fencing or gates shall require review and approval by
the Planning Department prior to installation.
Staff Report to the Planning Commission
Lands of Kaveh
12815 Viscaino Road
February 5,2015
Page 16
6. Walkways within the property line setbacks shall not exceed a width of 4'.
7. Outdoor lighting is approved as shown on the lighting plan. No up lights are approved. No
lighting may be placed within setbacks except two entry or driveway lights. Any additional
outdoor lighting shall be approved by the Planning Department prior to installation.
ENGINEERING DEPARTMENT:
8. Any revisions or additions to the previously approved grading and drainage plan shall be
submitted for review by the Engineering Department. The plan shall be reviewed by the
Engineering Department and approved prior to commencement of this project. The approved
plan shall be stamped and signed by the project engineer and shall supersede the previously
approved drainage plan.
9. No grading shall take place during the grading moratorium (October 15.and April 15) except
with prior approval from the City Engineer. No grading shall take place within ten feet of any
property line.
10. Any,and all,areas on the project site that have the native material disturbed shall be protected
for erosion control during the rainy season and shall be replanted prior to final inspection.
11. All irrigation systems must be located at least five feet from the Town's pathways and outside
of the public right of way and public utility easements. The Town staff shall inspect the site
and any deficiencies shall be corrected to the satisfaction of the Engineering Department prior
to final inspection.
Project approval may be appealed if done so in writing within 22 days of the date of this approval.
The building permit cannot be issued until the appeal period has lapsed.The applicant may submit
construction plans to the Building Department after the appeal period is over provided the
applicant has completed all conditions of approval required prior to acceptance of plans for
building plan check.
THE APPLICANT SHALL OBTAIN ALL REQUIRED BUILDING PERMITS PRIOR TO
COMMENCEMENT OF WORK.
Please refer to the Conditions of Project Approval set forth herein. If you believe that these
Conditions impose any fees, dedications, reservation or other exactions under the California
Government Code Section 66000, you are hereby notified that these.Conditions constitute written
notice of a statement of the amount of such fees, and/or a description of the dedications,
reservations, and other exactions. You are hereby further notified that the 90-day approval period
in which you may protest such fees, dedications, reservations, and other exactions, pursuant to
Government Code Section 66020(a), has begun. If you fail to file a protest within this _90-day
period complying with all of the requirements of Section 66020, you will be legally barred from
later challenging such exactions
Staff Report to the Planning Commission
Lands of Kaveh
12815 Viscaino Road
February 5,2015
Page 17
NOTE: The Site Development permit is valid for one.year from the approval,date (until February
5, 2016). All required building permits must be obtained within that year and work on items not
requiring a building permit shall be commenced within one year and completed within two years.
ATTACHMENT 2
Town Of Los Altos Hills February 19, 2013
Fast Track Hearing Fact Sheet
Project Description: New residence with a basement and swimming pool
File Number: 150-12-ZP-SD-GD
Site Address: 12815 Viscaino Road
Owner(s): Farro & Sue Kaveh
Staff Planner: Nicole Horvitz, Assistant Planner
Site Data
Net Lot Area: 1.2acre
Average Slope: 26.25%
Lot Unit Factor: .82
Floor and Development Area(square footage):
Area Type Maximum Existing Proposed Increase Remaining
Development 7,500 4,763 7,371 2,608 129
Floor 5,000 2,428 4,990 2;562 10
(Basement 2,466)
Height: Maximum Proposed
On Vertical Plane 27' 27'
Lowest to Highest 35' 32'
Setbacks: Minimum Proposed
Front 40 ft. 40 ft.
Sides/rear 30 ft. 30 ft.
Exterior Materials: Stucco with a stone veneer and a slate shingle and metal roof
Parking: Required spaces: 4, out of setbacks.
Proposed:4(3 garage spaces)out of setbacks.
Green Point Rated: 154
Fast Track Point: 7
Grading: Cut: 1,967-CY Fill: 22-CY Export: 1,954-CY
Sewer/Septic: Sewer
Environmental Design and Protection Committee:Protect the deodaras and oaks.
Open Space Committee:None
Pathways Committee:The property owner shall pay a pathway fee of$53.00 per linear foot of the average
width of the property
Town. Of Los Altos Hills February 19, 2013
Fast Track Hearing Fact Sheet
Project Description: New residence with a basement and swimming pool
File Number: 150-12-ZP-SD-GD
Site Address: 12815 Viscaino Road
Owner(s): Fargo & Sue Kaveh
Staff Planner: Nicole Horvitz,Assistant Planner
Attendance:
Debbie Pedro-Planning Director
Nicole Horvitz-Assistant Planner
John Harpootlian-City Council
Susan Mandle-Planning Commissioner
Jitze Couperus-Planning Commissioner
Pat Ley-Environmental Design and Protection Committee
Jim Balwin-Architect
Farro& Sue Kaveh-Owners
Environmental Design Committee Comments: None
Pathways Committee Comments: None
Neighbor Comments: None
Project Issues: None
Conditions of Approval:
• Standard conditions of approval recommended.
Planning Director Approval:
File # 150-12ZP-SD-GD (Lands of Kaveh) has been approved by Fast-track Review on
February 19, 2013, subject to the attached conditions.
Debbie Pedro,AICP, Planning Director Date
Project plans are available for review at the Town of Los Altos Hills Planning Department,
26379 Fremont Road. Phone for information: 650.941.7222.
ATTACHMENT 3
Nicole Horvitz
Subject: FW: Kaveh Landscape Screening Plan
From:
Sent: Friday,January 16,2015 11:58 AM
To: jsmandle@hotmail.com; jitze@couperus.org; kavitat@comcast.net; Richard partridge
Cc:Suzanne Avila; ; Carl Cahill
Subject: Kaveh Landscape Screening Plan
Honorable Planning Commission Members,
I have just been notified that the landscape plans review for Kaveh's property is now scheduled
for February 5, 2015, which was initially scheduled for January 13, 2015. Unfortunately, I have
a committed overseas business trip from January 27 to February 12, 2015. This trip has been
scheduled several months in advance with meetings in several countries and cannot be changed.
I kindly request that the planning commission review of kaveh's landscape plans be postponed
to another date, in order for me to presentmy concerns. I notified Suzanne Avila regarding my
committed overseas business trip on December 23, 2014. Also, I respectfully invite the planning
commission members to my home to view the invasion of my privacy from my deck, dinning
room, kitchen and front door entrance. I have reviewed the landscape plans and had several
discussions with Suzanne, I have serious concerns regarding the lack of screening plants and the
location of their driveway.
Brief Summary Regarding Kaveh New Construction:
I have had numerous discussions and meetings with Debbie Pedro, Nicole Horvitz and more
recently with Suzanne Avila since April of 2014. I have a record of all our meeting and
communication and will be glad to forward them to you. I sorne_how missed the public hearing
on site development, I do not recall receiving notification.and may be, Iwas on business travel.
This project was approved on Fast Track and planning commission did not review the plans. I
would have certainly objected to this intrusive construction. Since my house is on.a slope (20
feet below), I.am looking at this gothic structure of 55 feet tall from my home, which is less
than 50 yard's away.
I was assured by the planning department that my concerns would be addressed when the
landscape plans were submitted and the staff would visit my property to.access the
screening plan. Also, I and the staff tried numerous times to arrange a meeting with the
neighbors to discuss screening plan in order to provide privacy to both our homes.
Unfortunately, they have not responded and do not seem to have any interest in collaborating..
1
I had prepared a presentation regarding my concerns "Invasive Home Construction" and
forwarded my presentation to the City Council Members and Planning,Commission on July 10,
2014.
Appreciate your kind consideration.
Sincerely,
Raj,Reddy
LAH, 94022
2
/c7.
74 �� .
7ZGL—c4-21-4)-') cA)-(21"13
5 cArLeAt-'6 t°
frr 9 tip-
_r,
D�c ®5 2014
HILLS
,c70.-4-7---7: r®WNOFtos�cr
•
SUPPLEMENT
AGENDA ITEM# 5.
Distributed:21H f(
Honorable Planning Commission Members,
I have just been notified that the landscape plans review for Kaveh's property is'.
now scheduled for February 5, 2015, which was initially scheduled for January 13,
2015. Unfortunately, I have a committed overseas business trip from January 27:to
February 12, 2015. This trip has been scheduled several months in advance with
meetings in several countries and cannot be changed. I kindly request that the:
planning commission review of kaveh's landscape plans be postponed to
another date, in order for me to present my concerns. I notified Suzanne Avila
regarding my committed overseas business trip on December 23, 2014. Also, I
respectfully invite the planning commission members to my home to view the
invasion of my privacy from my deck, dinning room, kitchen and front door
entrance. I have reviewed the landscape plans and had several discussions with
Suzanne, Ihave serious concerns regarding the lack of screening plants and the
location of their driveway.
Brief Summary Regarding Kaveh New Construction:
I have had numerous discussions and meetings with Debbie Pedro, Nicole Horvitz
and more recently with Suzanne Avila since April of 2014. I have a record of all.
our meeting and communication and will be glad to forward them to you. I some
how missed the public hearing on site development, I do not recall receiving
notification and may be, I was on business travel. This project was approved on
Fast Track and planning commission did not review the plans. I would have
certainly objected to this intrusive construction. Since my house is on a slope (20
feet below), I am looking at this gothic structure of 55 feet tall from my home,
which is less than 50 yards away.
I was assured by the planning department that my concerns would be addressed
when the landscape plans were submitted and the staff would visit my property to
access the screening plan. Also, I and the staff tried numerous times to arrange a
meeting with the neighbors to discuss screening plan in order to provide privacy to
both our homes. Unfortunately, they have not responded and do not seem to have
any interest in collaborating.
I had prepared a presentation regarding my concerns "Invasive Home •
Construction" and forwarded my presentation to the City Council Members and
Planning Commission on July 10, 2014.
Appreciate your kind consideration.
Sincerely,
Raj Reddy
LAH, 94022
•
Jaime McAvoy
From: Suzanne Avila
Sent: Wednesday, February 04, 2015 8:11 AM
To: Jaime McAvoy
Subject: FW: Kaveh Landscape Screening Plan
Attachments: Honorable Planning Commission Members.docx
Jaime,
Please post for item 3.1 on tomorrow's Planning Commission agenda. Note there is an attachment in addition to the
email below.
Thanks,
Suzanne
From:
Sent:Tuesday, February 03, 2015 6:57 PM
To:Suzanne Avila
Cc: • Carl Cahill
Subject: Kaveh Landscape Screening Plan
Hi Suzanne,
I am sending this mail from Hong Kong, I am on business travel until February 13. I received a
letter from LAH planning department regarding Kaveh's landscape hearing scheduled for
February 5, on January 26, the day before my business trip. The Landscape review was
originally scheduled for January 13 and was postponed because the applicant did not submit the
revised plans in time. I have had several discussions with the LAH planning department
regarding my scheduled business trip, and also requested the planning commission to continue
the Kaveh landscape hearing to a later date. Attached is the e-mail sent to members of the
planning commission and the LAH planning department dated January 16, 2015, which
explains the serious nature of the landscape screening plan and a brief history.
During my absence, I requested my son, Glenn Reddy to attend the meeting on February 5th on
my behave. Glenn is 17 years old and a senior in high school. It would be extremely unfair and
inappropriate to expect an 17 year old to defend the total lack of landscape screening
plants which would effect our privacy and quality of life. Also, the Kaveh's have totally ignored
our several requests to meet and collaborate, they seem to have an entitlement of not caring
regarding the intrusion and invasion of neighbors privacy.
Unfortunately, my Attorney and landscape architect are unable to attend the February 5 meeting
due to prior commitments. I sincerely request that the Kaveh landscape screening hearing be
postponed to March 5, 2015.
1
Regards,
Raj Reddy
Los Altos Hills, CA94022
2
Nicole Horvitz
From: Gina Baffico <ginabaffico@gmail.com>
Sent: Thursday, February 05, 2015 4:00 PM
To: Suzanne Avila; Nicole Horvitz; Deborah Padovan
Cc: Scott Howarth;Jim Abraham;Jim &Siren; Sue Kaveh;farro.kaveh@gmail.com
Subject: Kaveh Residence
To: The City of the Town of Los Altos Hills Planning Commission
Dear Planning Commissioners,
We would like to express our support for our immediate neighbors Sue and Farro Kaveh and
their landscaping project at their new residence on Viscaino Road in Los Altos Hills. We would
very much like to see their project get approved this evening at your meeting. We feel their
landscaping plans are good for the neighborhood and preserve the look and feel for all
neighbors. We feel that this is in the best interest of our family, our neighbors and our
community to move forward and finish this project as soon as possible so that everyone's lives
can resume as normal and that the Kavehs can move into their home.
Best Regards,
Scott Howarth and Gina Baffico
12819 Viscaino Road
Los Altos Hills, CA 94022
1