TOWN OF LOS ALTOS HILLS August 6, 2015
Staff Report to the Planning Commission
SUBJECT: SITE DEVELOPMENT PERMIT FOR A LANDSCAPE SCREENING PLAN
FOR A NEW TWO STORY RESIDENCE; LANDS OF CHEN; 2210 OLD PAGE
MILL ROAD FILE# 184-15-ZP-SD
FROM: Genevieve Fernandez, Assistant Planner Or
APPROVED: Suzanne Avila, AICP, Planning Director S
RECOMMENDATION: That the Planning Commission:
1. Approve the requested Site Development Permit for a landscape screening plan, subject to
the recommended conditions of approval in Attachment 1; or
2. Approve the requested Site Development Permit with additional or modified conditions.
BACKGROUND
On October 3, 2013,the Planning Commission reviewed an application(file# 100-13-ZP-SD) for
a new residence and basement which was continued with specific suggestions and recommended
modifications (meeting minutes Attachment #4). The Commission's motion included the
following directions:
• Redesign with a 30 foot side yard setback along Gerth Lane
• Redesign with up to 18" eave encroachment into the setbacks
• Resite the building to allow for a standard 20 foot right of way dedication along Gerth Lane
• Add a condition of approval requiring that the landscape screening be reviewed by the
Planning Commission with an added requirement that the applicant be strongly encouraged
to include the neighbors in the landscape screening planning process.
On December 5,2013,the Planning Commission determined that all recommended modifications
had been met and unanimously approved the request for a Site Development Permit for a 6,095
square foot two-story new residence and 1,411 square foot basement.
CODE REQUIREMENTS
Sections 10-2.801 and 10-2.803 of the Site Development Ordinance are used to evaluate landscape
plans to address erosion, visual effects, tree preservation, views, and the amount of planting
required to adequately screen the new construction.
Staff Report to the Planning Commission
Lands of CHEN
2210 Old Page Mill Road
August 6,2015
Page 12
DISCUSSION
Site Data:
Net Lot Area: 1.1 acres
Average Slope: 12.7%
Lot Unit Factor: 1.04
Floor Area and Development Area:
Area (sq.ft) Maximum Existing Proposed Increase Remaining
Development 14,547 9,388 0 0 5,159
Floor 6,100 6,095 0 0 5
(Basement 1,411)
EXISTING LANDSCAPING
The project site has a creek (open space easement) along Old Page Mill Road that has thick
vegetation,which provides screening for the new residence from along the east property line.There
is mature landscaping along the front of the new residence.
PROPOSED LANDSCAPE SCREENING
The applicant is proposing nineteen (19) - 24-inch box trees, primarily along the perimeter of the
property. In addition to the screening trees,the applicant is including six (6) - 15-gallon shrubs on
either side of the driveway. The planting list is as follows:
Common Name, symbol on plan Size Quantity
Strawberry Tree (Arbutis Marina),A 24"Box 8
0 Coast Live Oak(Quercus Agrifolia), B 24"Box 8
• Salix Willow Hybrid(Salix Willow Hybrid), C 24"Box 3
• Pink Princess Escallonia Shrub (Escallonia Fradesii), S1 15 Gallon 6
Existing Trees to Remain -
Previously Removed Trees - t'�
��, ��n<� max, - ; r
11 . f�-- �!, '
vg.
v (r,� % j-
r^-;- • •.;; .1 �. \t.�lSA` 7-,---•r..+.+t.^rlr.�+ ^°t, Opens• 1(''.'.
.v to r
I 'rt ., l' ' .'.r. ,•s �. = � ' � '. Lem- ` r
,m r h,`
mma {m) I Liar heel"". Z ::.,
_ E Li
• un eE
i ^
_ 4�
1 r • ¢ T • d G,.9�e wn 'f J+ '1 ,
'` ` 4 0. 4 '' 1 • y • i. did �' w."..7.--
,
.fir": ,. n „,r. ry, �4','' '-0
�''. ,i\rx -£1. --..•.,, v,.EAS b..] ,--,h.- A
i aw=WC 1. 1 D ` ,• 66
�"� Mr Right of iir�'!— r_ti -AL- :' 411101-
••=z1 Way Easement wT Wry UR VII LANE •54°to ;41'131 . I
Staff Report to the Planning Commission
Lands of CHEN
2210 Old Page Mill Road
August 6,2015
Page 13
The applicant is proposing less than 5,000 square feet of new irrigated landscape therefore
compliance to Section 10-2.809 of the Los Altos Hills Municipal Code(Water Efficient
Landscape Ordinance) is not required.
OUTDOOR LIGHTING
No new lighting is proposed. All new exterior lighting, including fixtures on structures, shall be
approved by the Planning Department prior to installation.
GRADING AND DRAINAGE
No new grading and drainage is proposed with the landscape screening application.
COMMITTEE COMMENTS
The Environmental Design and Protection Committee reviewed on June 5,2015 and recommended
that the house needs landscape mitigation along the front property line. (See Attachment 4). Since
the recommendation,the applicant added screening along Gerth Lane.
NEIGHBOR CONCERNS
To date, staff has not received any comments from the public.
CEQA STATUS
This project is exempt from California Environmental Quality Act (CEQA) pursuant to Section
15304 (b) of the CEQA Guidelines which allows new landscaping.
ATTACHMENTS
1. Recommended Conditions of Approval
2. December 5, 2013 Planning Commission Minutes
3. December 5, 2013 Planning Commission Staff Report
4. October 3, 2013 Planning Commission Minutes
5. October 3, 2013 Planning Commission Staff Report
6. Environmental Design and Protection Committee Comments
7. Landscape Plans
Staff Report to the Planning Commission ATTACHMENT 1
Lands of CHEN
2210 Old Page Mill Road
August 6,2015
Page 15
ATTACHMENT 1
RECOMMENDED CONDITIONS FOR.SITE DEVELOPMENT PERMIT
FOR A LANDSCAPE SCREENING
LANDS OF CHEN, 2210 OLD PAGE MILL ROAD
File#184-15-ZP-SD
PLANNING DEPARTMENT:
1. No other modifications to the approved plans are allowed except as otherwise first reviewed
and approved by the Planning Director or the Planning Commission, depending on the scope
of the changes.
2. A landscape maintenance and water use deposit of$5,000.00 shall be posted prior to final
inspection of the new residence. An inspection of the screening plantings to ensure adequate
establishment and maintenance shall be made two years after installation.
3. Prior to beginning any grading operation, all significant trees, particularly the•heritage oak
trees, are to be fenced at the drip line: The fencing shall be of a material and structure (chain-
link) to clearly delineate the drip line. Town staff must inspect the fencing and thetrees to be
fenced prior to commencement of grading. The property owner shall call for said inspection at
least three days in advance of the inspection. The fencing must remain throughout the course
of construction. No storage of equipment, vehicles or debris shall be allowed within the drip
lines of these trees. Existing perimeter plantings shall be fenced and retained throughout the
entire construction period.
4. No fencing or gates are approved.
5. No new lighting is approved. No lighting may be placed within setbacks except two entry or
driveway lights.Any additional outdoor lighting shall be approved by the Planning Department
prior to installation.
ENGINEERING DEPARTMENT:
6. Any, and all, changes to the approved Grading and Drainage Plan shall first be approved by
the Town Engineering Department. No grading shall take place during the grading moratorium
(October 15 to April 15) except with prior approval from the City Engineer. No grading shall
take place within ten feet of any property line.
7. Any, and all, areas on the project site that have the native material disturbed shall be protected
for erosion control during the rainy season and shall be replanted prior to final inspection.
Staff Report to the Planning Commission
Lands of CHEN
2210 Old Page Mill Road
August 6,2015
Page 16
Project approval may be appealed if done so in writing within 22 days of the date of this approval.
The building permit cannot be issued until the appeal period has lapsed. The applicant may submit
construction plans to the Building Department after the appeal period is over provided the
applicant has completed all conditions of approval required prior to acceptance of plans for
building plan check.
Please refer to the Conditions of Project Approval set forth herein. If you believe that these
Conditions impose any fees, dedications, reservation or other exactions under the California
Government Code Section 66000, you are hereby notified that these Conditions constitute written
notice of a statement of the amount of such fees, and/or a description of the dedications,
reservations, and other exactions. You are hereby further notified that the 90-day approval period
in which you may protest such fees, dedications, reservations, and other exactions, pursuant to
Government Code Section 66020(a), has begun. If you fail to file a protest within this 90-day
period complying with all of the requirements of Section 66020, you will be legally barred from
later challenging such exactions.
NOTE: The Site Development permit is valid for one year from the approval date (until August 6,
2016). All required building permits must be obtained within that year and work on items not
requiring a building permit shall be commenced within one year and completed within two years.
ATTI` O ` `2
Minutes of a Regular Meeting
Town of Los Altos Hills
PLANNING COMMISSION
Thursday, December 05, 2013, 7:00 P.M.
Council Chambers, 26379 Fremont Road
Los Altos Hills, CA 94022
1. ROLL CALL AND PLEDGE OF ALLEGIANCE
Present: Commissioner Couperus, Commissioner Mandle, Commissioner Partridge,
Commissioner Tankha, Chair Abraham
Staff: Debbie Pedro, Community Development Director; Brian Froelich, Associate
Planner; Nicole Horvitz, Assistant Planner; Jaime McAvoy,Planning
Secretary
2. PRESENTATIONS FROM THE FLOOR
There were no presentations from the floor.
3. PUBLIC HEARINGS
Ex Parte Communications: Commissioner Tankha reported that she spoke with
neighbors Gary Kremen and Margot Pratt. Commissioner Partridge reported that he
spoke with neighbor Margot Pratt. Commissioner Mandle reported that she had spoken
with neighbors Margot and Vaughn Pratt and Gary Kremen. Commissioner Couperus
reported that he had spoken to neighbors Gary Kremen and Margot Pratt. Chair
•
Abraham reported that he had spoken to designer Scott Stotler.
3.1 LANDS OF CHEN, 2210 Page Mill Road; File #100-13-ZP-SD; A request for a
Site Development Permit for a 6,095 square foot two-story new residence and
1,411 square foot basement (Maximum height: 26'). The proposal includes eave
encroachments in the side setbacks of up to 18" and measures the front setback
from the Old Page Mill Road frontage (40') and the side setback from the Gerth
Lane frontage (30'). CONTINUED FROM THE OCTOBER 3, 2013 PLANNING
COMMISSION MEETING. CEQA Review: Categorical Exemption per Section
15303 (a) (staff-Brian Froelich).
Associate Planner Brian Froelich presented the staff report.
1
Planning Commission Regular Meeting Minutes
December 5,2013
Approved January 9,2014
Community Development Director Debbie Pedro addressed a letter received
from a neighbor requesting the hearing be continued; the Town attorney had
advised that the Town has complied with the noticing requirements for this hearing.
Commission asked staff questions to clarify the Town's noticing policy.
Chair Abraham opened the PUBLIC HEARING.
Designer Scott Stotler spoke on behalf of the project.
Commissioner Tankha asked questions pertaining to landscape screening and
when it would be submitted. She would like the landscape installed sooner rather
than later.
Mark Bader, Los Altos Hills, asked the Commission to clarify how they came to
their decision in regards to the corner lot designation.
Margot Pratt, Los Altos Hills, requested that large trees be installed to screen the
house as soon as possible.
John Nagle, Los Altos Hills, opposed the 18" roof eave encroachment and
objected to using Old Page Mill as the front setback.
Gary Kremen, Los Altos Hills, expressed concern with the Town's notification
policy, requested the project be subject to CEQA, and requested a denial or a denial
subject to mediation.
Vaughn Pratt, Los Altos Hills, wanted to know how the decision to designate a
corner lot came to be, and supported previous statements about visual impact.
Mr. Stotler expressed his concern over planting trees too early and having them
ruined during construction.
Commissioner Tankha asked questions of the designer.
Chair Abraham closed the PUBLIC HEARING.
Commissioner Tankha asked staff if the Town had similar frontage designation
for corner lots. Debbie Pedro referred to an example referenced earlier on Linda
Lane.
Commission discussion ensued
Commissioner Partridge stated the location of the creek had an impact on his
decision to change frontage designation as it would lessen the environmental
impact. The Chens have done everything asked of them and he supports the
project.
2
Planning Commission Regular Meeting Minutes
December 5,2013
Approved January 9,2014
Commissioner Tankha stated her support of the project for all the reasons already
mentioned. She feels strongly about the landscape going in sooner rather than later
so the trees will have matured by the time the building goes up, and will mitigate
the visual impact that concerns the neighbors.
Commissioner Mandle believes everyone is acting in good faith. This project is a
good compromise. To push back the house any further would impact the view as it
may have to become a full two-story building. If the house was one story it would
extend closer to the creek which would be a negative impact.
Commissioner Couperus was not at the October 4th hearing but sees that the
Chens have done what the Commission has asked them to do. He stated his support
the new frontage along Old Page Mill Road. He does not support the early planting.
Chair Abraham concurred with the rest of the Commission, and does not support
early planting.
MOTION MADE AND CARRIED: Moved by Commissioner Partridge, seconded
by Commissioner Tankha and passed unanimously to approve a request for a Site
Development Permit for a 6,095 square foot two-story new residence and 1,411
square foot basement (Maximum height: 26'). The proposal includes eave
encroachments in the side setbacks of up to 18" and measures the front setback
from the Old Page Mill Road frontage (40') and the side setback from the Gerth
Lane frontage (30'), with the added condition of moving the fireplace and that the
paint reflectivity value will not exceed 50 %.
Commissioner Mandle requested the added condition that the applicant be
strongly encouraged to include the neighbors in the Landscape Screening process.
12 LANDS OF HARDEN; 24874 OLIVE TREE LANE., File # 273-13-ZP-SD-GD-
VAR; A request for a Site Development Permit for a 1,139 square foot two story
addition (maximum height 25'), a setback variance for the proposed addition and
surface parking spaces to encroach up to 20' within the side yard setback, and a
variance to allow a parking configuration that creates an obstructed vehicular
access for one (1) parking space. In addition, the applicant is requesting a Grading
Policy exception of up to 6'6" of fill for the addition where 3' is allowed. CEQA
review: Categorical Exemption per Section 15303 (a) (staff-Nicole Horvitz).
Assistant Planner Nicole Horvitz presented the staff report, and noted that the
Open Space Committee granted a reduction in the property's Open Space easement
since the preparation of her report.
Commission asked questions of staff.
Chair Abraham opened the PUBLIC HEARING.
Architect Michael Chacon spoke on behalf of the project.
3
Planning Commission Regular Meeting Minutes
December 5,2013
ATTACHMENT 3
TOWN OF LOS ALTOS HILLS December 5, 2013
Staff Report to the Planning Commission
SUBJECT: SITE DEVELOPMENT PERMIT FOR A NEW 6,095 SQUARE FOOT
TWO STORY RESIDENCE, 1,411 SQUARE FOOT BASEMENT;
LANDS OF CHEN; 2210 PAGE MILL ROAD; FILE #100-13-ZP-SD.
CONTINUED FROM THE OCTOBER 3, 2013 PLANNING
COMMISISON MEETING.
FROM: Brian Froelich,AICP, Associate Planner
APPROVED: Debbie Pedro,AICP, Community Development Director
•
RECOMMENDATION: That the Planning Commission:
Approve the requested Site Development Permit for the new residence and basement
subject to the recommended Conditions of Approval in Attachment#1.
BACKGROUND
The Planning Commission reviewed the application for a new residence and basement on
October 3, 2013 and continued the application with specific suggestions and
recommended modifications (meeting minutes Attachment #3). The Commission's
motion included the following directions:
• Redesign with a 30 foot side yard setback along Gerth Lane
• Redesign with up to 18" eave encroachment into the setbacks
• Resite the building to allow for a standard 20 foot right of way dedication along
Gerth Lane
• Add a condition of approval requiring that the Landscape Screening be heard by
the Planning Commission
DISCUSSION
Site Data:
Net Lot Area: 1.1 acres
Average Slope: 12.7%
Lot Unit Factor: 1.04
Lands of Chen
Planning Commission
December 5,2013
Page 2
Area Maximum Proposed Existing Increase Left
Development 14,547 9,388 5,940 3,448 5,159
Floor 6,100 6,095 2,611 3,488 5
*Basement exempt from Floor Area 1,411
The Planning Commission gave direction to the applicant regarding the project, and the
applicants have modified the plans in response to the comments. These changes include:
1.Redesign with a 30 foot side yard setback along Gerth Lane.
The revised plans show a similar sized home, architectural style, and floor plan layout.
The building finished floor elevation and location on the property are basically
unchanged. The first floor width of the building was reduced by approximately seven (7)
feet.
2. Redesign with up to 18" eave encroachment into the setbacks.
The revised plans show an 18' roof eave encroachment along the Gerth Lane frontage
parallel to the 30 foot setback line. The plans also include a partial encroachment at the
setback line opposite Gerth Lane. The encroachment is partial in this location because the
setback line is at an angle to the residence.
The revised drawings include an encroachment of up to 12"for the family room chimney.
Although minor, this request constitutes a Minor Variance per Section 10-1.1007(2)(d). A
Minor Variance was not described in the public noticing for this project. The project
would need to be continued and renoticed if the Planning Commission is to consider the
Minor Variance request. Planning staff would not support a Minor Variance request and
has included a condition of approval requiring that the chimney be redesigned to comply
with setbacks prior to the Building Permit process (condition#16).
Planning staff did not find the chimney encroachment during the initial plan checking of
the revised plans. Also, the applicant reportedly did not believe the chimney
encroachment constituted a Minor Variance and therefore did not disclose to staff that a
Setback Variance was part of the proposal.
3. Resite the building to allow for a standard 20 foot right of way dedication along
Gerth Lane.
The design has been altered to accommodate the 20 foot right of way dedication and 30
foot side yard setback from Gerth Lane.
4. Add a condition of approval requiring that the Landscape Screening be heard by
the Planning Commission.
Lands of Chen
Planning Commission
December 5,2013
Page 3
Condition of approval #3 requires Planning Commission review of the landscape
screening plan.
Neighbor Comments
As of the writing of the staff report, no additional neighbor comments have been
received.
Summary
The attached October 3, 2013 Planning Commission staff report (Attachment #2) and
meeting minutes (Attachment #3) include additional background information and
comments regarding the project.
With a revised chimney design, the applicant has followed the direction provided by the
Planning Commission.
ENVIRONMENTAL REVIEW (CEQA)
The project is categorically exempt under CEQA per Sections 15303 (a).
ATTACHMENTS
1. Recommended conditions of approval
2. Planning Commission staff report and attachments, October 3, 2013
3. Planning Commission minutes from meeting, October 3, 2013
4. Written comments received following preparation of the October 3, 2013 staff
report
Lands of Chen
Planning Commission
December 5,2013
Page 4
ATTACHMENT 1
RECOMMENDED CONDITIONS FOR A SITE DEVELOPMENT PERMIT FOR A
NEW RESIDENCE AND BASEMENT
LANDS OF CHEN, 2210 PAGE MILL ROAD
File# 100-13-ZP-SD-GD
PLANNING DEPARTMENT - Please work with Brian Froelich, Associate Planner 650-
947-2505 to complete the following conditions:
1. No other modifications to the approved plans are allowed except as otherwise first
reviewed and approved by the Planning Director or the Planning Commission,
depending on the scope of the changes.
2. All existing Blue Gum (E. globulus), Pink Ironbark (E. sideroxylon rosea), River
Red Gum (E. camaldulensis), Swamp Gum (E. rudis), Honey Gum (E.
melliodora), or Manna Gum (E. viminalis) eucalyptus trees on the property
located within 150' of any structures or roadways shall be removed prior to final
inspection. Removal of eucalyptus trees shall take place between the beginning of
August and the end of January to avoid disturbance of nesting birds protected
under the Federal Migratory Bird Treaty Act(MBTA)and California Department of
Fish and Game Code Section 3500 et seq unless a nesting bird survey is first
conducted and there is a determination that there are no active nests within the tree.
3. After completion of rough framing or at least six (6) months prior to scheduling a
final inspection, the applicant shall submit landscape screening and erosion
control plans for review by the Planning Commission. The application for
landscape screening and erosion control shall be accompanied by the applicable
fee and deposit. The plans shall be reviewed at a noticed Planning Commission
hearing. Attention shall be given to plantings which will be adequate to break up
the view of the structures from surrounding properties and streets. All landscaping
required for screening purposes and for erosion control (as determined by the City
Engineer) must be installed prior to final inspection. The landscape screening
plan shall comply with Section 10-2.809 (water efficient landscaping) of the
Los Altos Hills Municipal Code.
4. A landscape maintenance deposit in the amount of$5,000 shall be posted prior to
final inspection. An inspection of the landscape to ensure adequate establishment
and maintenance shall be made two years after the installation. The deposit will
be released at that time if the required plantings remain viable.
5. Prior to requesting the foundation inspection, a registered civil engineer or
licensed land surveyor shall certify in writing and state that "the location of the
new residence is no less than 40'from the front property line and 30'from the
sides and rear property lines." The elevation of the new residence shall be
similarly certified in writing to state that "the elevation of the new residence
Lands of Chen
Planning Commission
December 5,2013
Page 5
matches the elevation and location shown on the approved Site Development
plan." The applicant shall submit the stamped and signed letter(s) to the
Planning Department prior to requesting a foundation inspection and prior
to final inspection.
6. Prior to requesting the fmal framing inspection, a registered civil engineer or
licensed land surveyor shall certify in writing and state that "the height of the new
residence complies with the structure height shown on the approved plans,
measured as the vertical distance at any point from the building pad, to the
highest part of the structure directly above (including roof materials)." The
overall structure height shall be similarly certified in writing and state that "all
points of the building (including chimneys and appurtenances) lie within a thirty-
five (35) foot horizontal band measured from the lowest visible natural or
finished grade topographical elevation of the structure along the building line
and the highest point of the roof structure or appurtenance." The applicant shall
submit the stamped and signed letter(s) to the Planning Department prior to
requesting a fmal framing inspection and prior to fmal inspection.
7. Building mounted lighting shall have frosted glass or be down lights. No lighting
may be placed within setbacks except two entry or driveway lights.
8. Skylights shall be designed and constructed to reduce emitted light (tinted or
colored glass, or other material).No lighting may be placed within skylight wells.
9. Fire retardant roofing(Class A) is required for all new construction.
10. No new fencing or gates are approved. Any new fencing, walls or gates shall
require review and approval by the Planning Department,prior to installation.
11. At the time of submittal of plans for building plan check, the applicant shall
submit one of the following checklists to demonstrate compliance with the
Town's Green Building Ordinance:
A. A GreenPoint rated checklist with the building permit application to
indicate that the project will achieve a minimum of fifty (50) points. The
checklist shall be completed by a qualified green building professional and
shall be attached to the front of the construction plans. The construction
plans shall include general notes or individual detail drawings, where
feasible, showing the green building measure to be used to attain the
required points.
B. A LEED for Homes checklist with the building permit application to
indicate that the project will achieve a minimum of forty-five (45) points
or LEED certification. The checklist shall be completed by a qualified
green building professional and shall be attached to the front of the
construction plans. The construction plans shall include general notes or
Lands of Chen
Planning Commission
December 5,2013
Page 6
individual detail drawings, where feasible, showing the green building
measure to be used to attain the required points.
12.Prior to final inspection and occupancy, a qualified professional as for the scoring
system used (GreenPoint Rater or a LEED AP) shall provide documentation to the
Planning Department verifying that the building was constructed in compliance
with GreenPoint Rated or LEED®certification.
13. Noise generating construction activities shall be limited to Monday through
Saturday between the hours of 8:00 am and 5:30 pm. and shall not exceed
allowable noise standards set forth in the Municipal Code. No heavy noise
generating equipment is allowed to be used on Saturdays and no construction is
allowed on Sundays or holidays as noted per Chapter 7, Sec.5-7-01 of the Los
Altos Hills Municipal Code.
14. The applicant shall pay School District fees to either the Los Altos School District
or the Palo Alto Unified School District, as applicable, prior to acceptance of
plans for building plan check The applicant must take a copy of worksheet #2 to
school district offices (both elementary and high school in the Los Altos School
District), pay the appropriate fees and provide the Town with a copy of the
receipts.
15. The property owner shall grant an Open Space Easement to the Town to cover all
of the area within 25 feet of the top of Matadero Creek, within the property. No
structures are permitted and no grading or fill shall be permitted in this area.
Native vegetation may be planted within the easement but no irrigation or
sprinkler systems are permitted. The property owner shall provide a legal
description and plat exhibits that are prepared by a licensed land surveyor or
registered civil engineer and the Town shall prepare the grant document. The
grant document shall be signed and notarized by the property owner and returned
to the Town prior to acceptance of plans for building permit.
16. The building floor plans and site plans shall be amended to redesign the Family
Room chimney to comply with the 30 foot side yard setback. The project designer
shall prepare the revised plan and provide two (2) copies to the Planning
Department,prior to acceptance of plans building plan check.
17.Prior to beginning any grading operation, tree fencing for all oak trees 12" in
diameter and greater in the areas of work. The tree protection measures must be
implemented throughout the course of construction. Town staff must inspect the
fencing and the trees to be fenced prior to commencement of grading. The
property owner shall call for said inspection at least three days in advance of the
inspection. No storage of equipment, vehicles or debris shall be allowed within
the drip lines of these trees.
Tree fencing requirements:
Lands of Chen
Planning Commission
December 5,2013
Page 7
• Fencing shall be located at the drip line of the tree or trees.
• All trees to be preserved shall be protected with chain link fences with a
minimum height of five feet(5') above grade.
• Fences are to be mounted on two-inch diameter galvanized iron posts,
driven into the ground to a depth of at least two feet (2') at no more than
10-foot spacing.
• Fencing shall be rigidly supported and maintained during all construction
periods.
• No storage of equipment, vehicles or debris shall be allowed within the
drip lines of these trees at any time.
• No trenching shall occur beneath the drip line of any trees to be saved.
ENGINEERING DEPARTMENT - Please work with John Chau, Assistant Engineer
650-947-2510 to complete the following conditions:
18. As recommended by Cotton, Shires &Associates, Inc., in their letter dated July 3,
2013, the applicant shall comply with the following:
A. Geotechnical Plan Review - The applicant's geotechnical consultant shall
review and approve all geologic and geotechnical aspects of the project building
and grading plans (i.e., site preparation and grading, site drainage improvements
and design parameters for foundations, retaining walls and driveway) to ensure
that their recommendations have been properly incorporated. Supplemental
geotechnical design criteria should be presented for the partial basement.
The results of the plan review shall be summarized by the geotechnical consultant
in a letter and submitted to the Town Engineer for review prior to acceptance of
plans for building plan check.
B. Geotechnical Construction Inspections - The geotechnical consultant shall
inspect, test (as needed), and approve all geotechnical aspects of the project
construction. The inspections shall include, but not necessarily be limited to: site
preparation and grading, site surface and subsurface drainage improvements, and
excavations for foundations and retaining walls prior to the placement of steel and
concrete.
The results of these inspections and the as-built conditions of the project shall be
described by the geotechnical consultant in a letter and submitted to the Town
Engineer for review prior to final inspection.
19. Peak discharge at 2210 Old Page Mill Road, as a result of Site Development
Permit 100-13, shall not exceed the existing pre-development peak discharge
value of the property. Detention storage must be incorporated into the project to
reduce the predicted peak discharge to the pre-development value. Provide the
data and peak discharge hydrologic model(s) utilized, as well as, the calculations
Lands of Chen
Planning Commission
December 5,2013
Page 8
of the peak discharge value prior and post development. Determine the design
peak runoff rate for a 10-year return period storm and provide detention storage
design plans to reduce the predicted peak discharge to the pre-development value.
All documentation, calculations, and detention storage design(2 plan copies) shall
be submitted for review and approval to the satisfaction of the City Engineer
prior to acceptance of plans for building plan check.
20. The Engineer of Record shall observe the installation of the drainage system,
construction of the energy dissipators, and completion of the grading activities
and state that items have been installed and constructed per the approved plans. A
stamped and signed letter shall be prepared and submitted to the Town prior to
final inspection.
21. All hydrant use is strictly prohibited by the Purissima Hills Water District. A
permit for obtaining water for grading and construction purposes must be
obtained from the Purissima Hills Water District, and submitted for approval to
the Town Engineering Department prior to acceptance of plans for building
check. The permit will authorize the use of water from specific on-site or off-site
water sources.
22. Any, and all, changes to the approved grading and drainage plan shall be
submitted as revisions from the project engineer and shall first be approved by the
Town Engineering Department. No grading shall take place during the grading
moratorium (October 15 to April 15) except with prior approval from the City
Engineer. No grading shall take place within ten feet of any property line except
to allow for the construction of the driveway access.
23. All public utility services serving this property shall be placed underground. The
applicant should contact PG&E immediately after issuance of building permit to
start the application process for undergrounding utilities which can take up to 66-88
months.
24. Two copies of an erosion and sediment control plan shall be submitted for review
and approval by the Engineering Department prior to acceptance of plans for
building plan check The contractor and the property owner shall comply with all
appropriate requirements of the Town's NPDES permit relative to grading and
erosion/sediment control. The first 100 feet of the driveway shall be rocked
during construction and all cut and fill slopes shall be protected from erosion. All
areas on the site that have the native soil disturbed shall be protected for erosion
control during the rainy season and shall be replanted prior to final inspection.
25. Two copies of a grading and construction operation plan shall be submitted by the
property owner for review and approval by the City Engineer and Planning
Director prior to acceptance of plans for building plan check The
grading/construction operation plan shall address truck traffic issues regarding
dust, noise, and vehicular and pedestrian traffic safety on Gerth Lane and
' r
Lands of Chen
Planning Commission
December 5,2013
Page 9
surrounding roadways, storage of construction materials, placement of sanitary
facilities, parking for construction vehicles, clean-up area, and parking for
construction personnel. A debris box (trash dumpster) shall be placed on site for
collection of construction debris. Arrangements must be made with the
GreenWaste Recovery, Inc. for the debris box, since they have a franchise with
the Town and no other hauler is allowed within the Town limits.
26. The property owner shall inform the Town of any damage and shall repair any
damage caused by the construction of the project to pathways, private driveways,
and public and private roadways, prior to final inspection and release of
occupancy permits and shall provide the Town with photographs of the existing
conditions of the roadways and pathways prior to acceptance of plans for
building plan check
27. The property owner shall have the private wood bridge analyzed by a structural
engineer and provide maximum load capacity which can be utilized for
construction equipments and vehicles prior to acceptance of building permit plan
check
28. The property owner shall dedicate a 20' wide half-width public right of way to
the Town over Gerth Lane. The property owner shall provide legal description
and plat exhibits that are prepared by a registered civil engineer or a licensed land
surveyor and the Town shall prepare the dedication document. The dedication
document, including the approved exhibits, shall be signed and notarized by the
property owner and returned to the Town prior to acceptance of plans for
building plan check.
29. The property owner shall provide a copy of the Residential Service Design Load
Information to the Public Works Department prior to acceptance of plans for
building permit plan check
30. The property owner shall submit an elevation certificate for the Construction
Drawings of the new residence to the Town that indicates the new residence
meets F.E.M.A. requirements for the new construction prior to acceptance of
building permit plan check
31. The property owner shall submit elevation certificates for the new residence to the
Town that indicates the new residence meets F.E.M.A. requirements for the new
construction during Building under Construction and at Finished Construction
prior to final inspection.
32. The property owner shall pay a pathway fee of $53.00 per linear foot of the
average width of the property prior to acceptance of plans for building plan
check
Lands of Chen
Planning Commission
December 5,2013
Page 10
FIRE DEPARTMENT - Please work with the Santa Clara County Fire Department 408-
378-4010 to complete the following conditions:
33. An automatic residential fire sprinkler system approved by the Santa Clara County
Fire Department shall be included in all portions of the building. Three sets of plans
prepared by a sprinkler contractor shall be submitted to the Santa Clara County Fire
Department (14700 Winchester Blvd., Los Gatos, CA 95032) for review and
approval. The sprinklers shall be inspected and approved by the Fire Department,
prior to final inspection and occupancy of the new residence.
34. This project is located within the designated Wildland Urban Interface Fire Area.
The building construction shall comply with the provisions of the California
Building Code (CBC) Chapter 7A. Vegetation clearance shall be in compliance
with CBC Section 701A.3.2.4 prior to project final approval.
35. Approved numbers or addresses shall be placed on all new and existing buildings
in such a position as to be plainly visible and legible from the street or road
fronting the property.Numbers shall contrast with their background.
CONDITION NUMBERS 14, 15, 16, 18A, 19, 24, 25, 26, 27, 28, 29, 30, AND 32
SHALL BE COMPLETED AND SIGNED OFF BY THE PLANNING
DEPARTMENT AND/OR THE ENGINEERING DEPARTMENT PRIOR TO
ACCEPTANCE OF CONSTRUCTION PLANS FOR PLAN CHECK BY THE
BUILDING DEPARTMENT.
ATT° eltmtN f'
Minutes of a Regular Meeting
Town of Los Altos Hills
PLANNING COMMISSION
Thursday, October 3, 2013, 7:00 P.M.
Council Chambers,26379 Fremont Road
L ROLL CALL AND PLEDGE OF ALLEGIANCE
Present: Commissioner Tankha, Commissioner Mandle, Commissioner Partridge,
Chair Abraham
Absent: Commissioner Couperus
Staff: Debbie Pedro, Community Development Director; Richard Chiu, Public
Works Director; Brian Froelich, Associate Planner; Jaime McAvoy,
Planning Secretary
2. PRESENTATIONS FROM THE FLOOR
Samuel Broydo, Los Altos Hills, came to mention the upcoming discussion element
based on AB 1358, and notify the Commission that he had sent materials for them to
review before they make their decision.
3. PUBLIC HEARINGS
Ex Parte Communications: Commissioner Mandle reported that she spoke with the
property owners, visited the site, and had spoken with multiple neighbors. Commissioner
Partridge reported that he had spoken with the property owners and neighbors.
Commissioner Tankha reported that she had spoken with the property owners and
neighbors. Chair Abraham reported that he had spoken to the property owners,
neighbors, and the architect.
3.1 LANDS OF CHEN, 2210 PAGE MILL ROAD; File # 100-13-ZP-SD; A request
for a Site Development Permit for a 6,099 square foot two-story new residence
and 1,411 square foot basement (Maximum height: 26'). The application is also
requesting a reduced right-of-way width of 40' along Gerth Lane where 50' is
required. CEQA Review: Categorical Exemption per Section 15303 (a) (Staff-
Brian Froelich).
Chair Abraham requested to split the discussion into two parts: one for the right-
of-way and one for the residence itself The Commission agreed.
1
Planning Commission Regular Meeting Minutes
October 3,2013
Approved November 14,2013
Associate Planner Brian Froelich presented the staff report.
Commission asked questions of staff.
Public Works Director Richard Chiu explained the purposes of right-of-way
dedications, and the criteria for dedication size.
Chair Abraham opened the PUBLIC HEARING.
Applicant Cici Chen spoke on behalf of her project.
Dan Tackas, Hatchmont/McDonald, traffic engineer, spoke on behalf of the
reduced right-of-way dedication.
Designer Scott Stotler spoke on behalf of the project.
Applicant John Chen spoke on behalf of his project.
Mark Bader, Los Altos Hills, also building a home on Gerth lane, stated his
opposition to the waiver of the right-of-way dedication.
Margot Pratt, Los Altos Hills, stated her opposition to the waiver of the right-of-
way dedication.
Gary Kremen, Los Altos Hills, stated his opposition to the waiver of the right-of-
way dedication.
Chair Abraham closed the PUBLIC HEARING.
Chair Abraham re-opened the PUBLIC HEARING.
Paul Waserman, representing the Snyder family, Los Altos Hills, spoke in
support of the project.
Mr. Chen responded to the comments made by his neighbors, and gave his closing
statement.
Commission discussion ensued.
Mr. Stotler spoke again, but to the design of the house in reference to the front
setback, now that the Commission has agreed to uphold the standard right-of-way
dedication.
John Nagle, Los Altos Hills, Gerth Lane Home Owner's Association President.
Speaking on his own behalf, not the Association's. Opposed to changing the front
section of the property to Old Page Mill Road.
2
Planning Commission Regular Meeting Minutes
October 3,2013
Approved November 14,2013
Mr. Kremen spoke again, requesting mediation with the Chens to keep the
neighbors involved in the Site Development process.
Vaughn Pratt, Los Altos Hills, is concerned about the visual impact of the house,
and while he is not opposed to the size, he is worried it will not stick to the rural
atmosphere of the neighborhood.
Ms. Chen spoke again.
Chair Abraham closed the PUBLIC HEARING.
Commission discussion resumed.
Chair Abraham called for a recess.
Commission reconvened at 10:00 PM.
Applicants requested to continue the public hearing, and request a direction on
where the commission stands on the 30 foot setback, so they can decide where to go
from there.
MOTION MADE AND SECONDED: Commissioner Partridge moved to
continue, to a date uncertain, a request for consideration of a 30 foot side setback
along Gerth Lane, and up to an 18 inch encroachment of the eaves into the setback,
and include the added condition that the applicant bring the Landscape Screening
Plan to the Planning Commission, based on a 20 foot right-of-way dedication. The
motion was seconded by Commissioner Tankha.
AYES: Commissioner Tankha, Commissioner Mandle1
Commissioner Partridge, Chair Abraham
NOES: None
ABSENT: Commissioner Couperus
ABSTAIN: None
MOTION CARRIED.
4. OLD BUSINESS - none
3
Planning Commission Regular Meeting Minutes
October 3,2013
ATTACHMENT 5
TOWN OF LOS ALTOS HILLS October 3, 2013
Staff Report to the Planning Commission
SUBJECT: SITE DEVELOPMENT PERMIT FOR A NEW 6,099 SQUARE FOOT
TWO STORY RESIDENCE, 1,411 SQUARE FOOT BASEMENT AND
A REQUEST TO REDUCE THE GERTH LANE RIGHT OF WAY
WIDTH FROM 50 FEET TO 40 FEET; LANDS OF CHEN; 2210 PAGE
MILL ROAD; FILE#100-13-ZP-SD.
FROM: Brian Froelich,AICP,Associate Planner
APPROVED: Debbie Pedro, AICP, Community Development Director
RECOMMENDATION: That the Planning Commission:
Deny the requested Right of Way width reduction based on the Findings of Denial in
Attachment #1 and advise the applicant to redesign the project to comply with the
standard right of way width and required setbacks.
BACKGROUND
The subject property is located at the corner of Old Page Mill Road and Gerth Lane. All
properties that access Gerth Lane have addresses on Old Page Mill Road or Page Mill
Road.
The applicant is proposing a new 6,099 square foot, two-story residence with a 1,411
square foot basement. As part of this request, the applicant proposes a reduced right of
way width dedication. The applicant is proposing to reduce the right of way width from
50 feet to 40 feet wide. In addition, the applicant is proposing to use the Old Page Mill
Road frontage as the front property line to measure the 40 foot front setback and the
Gerth Lane frontage to be a side yard with a 30 foot setback.
The property is 1.1 acres with an average slope of 12.7%. The site is currently developed
with a single story residence and attached garage. The existing structures are to be
demolished and the driveway access is proposed to be relocated 45 feet east of the
existing driveway on Gerth Lane. The site accesses a 30 foot wide right of way easement
(Gerth Lane). Matadero Creek traverses the property along the eastern boundary.
DISCUSSION
Site Data:
Net Lot Area: 1.1 acres
Average Slope: 12.7%
Lot Unit Factor: 1.04
Lands of Chen
Planning Commission
October 3,2013
Page 2
Area Maximum Proposed Existing Increase , Left
Development 14,547 9,388 5,940 3,448 5,159
Floor 6,100 6,099 2,611 3,488 1
*Basement exempt from Floor Area 1,411
Site and Architecture
The 1.1 acre site has a 12.7% slope that ascends east to west. Matadero Creek marks the
low point of the property and runs parallel to Page Mill Road. The building site location
is shifted toward the higher ground on the site and away from Matadero Creek. The 100
year flood elevation is shown on plan sheet C-1.
The design of the proposed two story residence utilizes all of the allowable floor area but
reserves over 5,000 square feet of development area. The proposed site layout includes a
three car garage in the area of the existing garage however the garage doors are
reoriented to a new street access point at a lower elevation along Gerth Lane. The exterior
building materials include cement plaster with pre-cast and wrought iron features, and a
concrete tile roof. The residence includes a partial basement(1,411 sf).
The proposed residence complies with setbacks and height standards per Title 10 of the
Municipal Code. It must be noted that the setback compliance assumes a reduced right of
away and a 30 foot property line setback from the Gerth Lane frontage.
Driveway&Parking
The proposed driveway will utilize a relocated access from Gerth Lane approximately 45
feet down slope of the existing driveway. The driveway directly approaches the proposed
three car garage and one surface parking space.
Outdoor Lighting
Outdoor lighting is shown on the elevation plan sheets. The plan shows a combination of
wall mounted and recessed lighting.
Grading &Drainage
The Engineering Department has reviewed the project Civil Engineering plans and has
determined that the proposal complies with the Grading Policy and the Town's drainage
standards. Grading quantities include:
• 950 cubic yards of cut
• 300 cubic yards of fill
• 650 cubic yards export
Lands of Chen
Planning Commission
October 3,2013
Page 3
The site grading and cut are primarily for the basement excavation and driveway
realignment.
The lightwell and basement drainage directs water into area drains conveyed into pipes
that connect to an energy dissipater. The downspout and building perimeter drainage are
directed into pipes that convey to a detention basin. The detention basin and dissipater
locations are approximately 50 feet from the top of Matadero Creek bank and comply
with structural setbacks.
Geotechnical Review
The applicant has provided a Geotechnical Investigation prepared by Earth Investigations
Consultants. The Town's Geotechnical consultant has peer reviewed the proposal and
recommended standard conditions that include follow up documentation and inspection
by the project geologist. (Attachment#6)
Trees &Landscaping
The site landscaping is a blend of natural and installed plant materials. All landscape on
site has not been regularly maintained. The site contains only one heritage oak tree (12"
and larger in truck diameter) in the area of work near the existing driveway. The other
oak trees on site are near Matadero Creek and away from any possible construction
activity.
The site contains several Eucalyptus trees all of which would need to be removed with
the approval of a new residence. There are several shrubs and trees that will need to be
removed to accommodate the new driveway and building footprint.
Green Building Ordinance
The applicant has submitted a GreenPoint checklist in compliance with the Town's Green
Building Ordinance. The building is designed to achieve 91 points in the GreenPoint
Rated certification program.
Sanitation
The site will connect via gravity to the Palo Alto Basin Sewer manhole located in Gerth
Lane.
Fire Department Review
The Santa Clara County Fire Department reviewed the plans and has required that the
building be sprinklered and notes that the site is located in the Wildland-Urban Interface
Area. (Attachment#7)
Lands of Chen
Planning Commission
October 3,2013
Page 4
Town Committee's Review
The Pathways Committee has recommended that the applicant pay the in-lieu fee.
(Attachment#3)
The Open Space Committee has recommended that an Open Space Easement be granted
over the area within 25 feet of the top of bank of Matadero Creek within the property.
(Attachment#4)
The Environmental Design and Protection Committee commented that landscape
mitigation plantings will be needed on the north side of the residence. (Attachment#5)
Right of Way Dedication
Overview — Right of way dedication is described in the following Municipal Code
Section:
10-2.1202 Right-of-way dedication.
Whenever a site development permit is requested for a lot which was created prior to January 1,
1973, and where the driveway or contiguous road rights-of-way are substandard, the Planning
Director or Planning Commission may require dedication of a right-of-way of sufficient width to
conform to current Town standards. (§ 15, Ord. 299, eff. December 11, 1985; §8, Ord. 384, eff.
October 18, 1996)
The Town has been successively subdivided over the past 100+ years. Many of these
subdivisions were approved prior to 1973 with right of way widths that are now
inadequate. The mechanisms for right of way dedication include subdivision, new
residence, or major addition development projects. The dedication is typically a condition
of project approval. Following project approval, the project engineer will prepare plat and
legal description documents for recording with the Santa Clara County Clerk Recorder.
The Planning Department has consistently applied the above Section with a condition of
approval for new residence and addition projects when Floor Area is increased by 25% or
more. The Town's Engineering Department keeps a record of all rights of way in Town.
These records were last updated in a comprehensive effort between March 1998 and
January 1999. The records note the existing right of way widths, needed dedications, and
all underlying documents that created rights of way.
For site development purposes, a right of way dedication requirement has the greatest
bearing on setbacks because the locations of the abutting property lines are adjusted to
meet required right of way widths (post-dedication).
The widths of rights of way in Town range between 40 feet and 60 feet with most roads
being either 50 feet or 60 feet (approximately 85%). The width standards are specific to
each roadway based on traffic, safety, and future development.
Lands of Chen
Planning Commission
October 3,2013
Page 5
Gerth Lane History - Gerth Lane was previously determined to have a 60 foot wide
right of way requirement by the Town's Engineering Department. The width of Gerth
Lane was then reduced to 50 feet by the City Council in approving a major addition
project in 1994 at 2240 Page Mill Road(north side of Gerth Lane). (2240 Page Mill Road
CC minutes—Attachment#9)
As a matter of background, when the properties along Gerth Lane were initially
subdivided in the 1940's, Gerth Lane was mapped as a 30 foot wide right of way
easement exclusively over the properties along the south side of Gerth Lane. Since that
time, a 30 foot right of way width has become substandard for any road in Town. Thus,
the Council's action in 1994 to reduce the right of way width to 50 feet meant that the
owner of 2240 Page Mill Road (north side) needed to grant 20 feet of right of way along
their frontage to be added to the existing 30 foot wide right of way easement (south side)
for a total of 50 feet wide. This situation is unusual because in most cases the right of
way widths are equally shared for properties on both sides of a road.
Right of Way Policy - The Town adopted a Right of Way Policy in 1989. The Policy
defines terms, declares standards and further outlines process for right of way dedication.
The Policy also assigns authority to the Planning Commission to determine right of way
width. Section 6.c) of the Right of Way Policy states:
"In no event shall a road right-of-way of less than 40 feet be approved. If right-of-ways of less
than 50' are approved by the Planning Commission, specific findings must be made relating to
traffic, safety and future development."
Right of Way Policy Section 7 states:
"The setback for all new construction on all properties shall be no less than 70'from the
centerline of the dedicated road right-of-way or vehicular easement. Corner lots will have
setbacks of 70'from the centerline of the major road and 60'from the centerline of the minor
road. The Site Development Authority will retain the right to determine the side of greater
setback"
Right of Way Policy Section 7 has not been applied by the Town. Rather,the Town has
consistently applied setback standards following the Municipal Code Section 10-1.505
(c) which states:
"10-1.505(c) The setback line for any structure shall be:
(1) Where a parcel abuts on a single street or other access way, forty (40)feet from the
nearest such public or private street right-of-way, easement for vehicular access, or where an
official plan line has been established,from such official plan line.
(2) Where a lot abuts on more than one such street, easement, or official plan line, the
Planning Commission or the Site Development Authority, whichever entity first acts upon an
application relating to the development of a particular property, shall designate the street,
easement or official plan line from which the forty(40)foot setback shall be measured, which will
Lands of Chen
Planning Commission
October 3,2013
Page 6
in the judgment of the Site Development Authority, have the least negative environmental, visual
or aesthetic impact on neighboring properties and the public at large.
(3) Thirty (30)feet from property lines, nearest lines of public or private streets, rights-of-
way easements for vehicular access, or official plan lines in all other instances."
General Plan-The Town's General Plan Circulation Element includes the following
notations regarding right of ways:
GP-Cir —pg 1 Introduction "Los Altos Hills, a rural residential community, takes pride in its
narrow, winding roadways which maintain and enhance the scenic qualities of the Town while
providing access to and from residential neighborhoods. The broad rights-of-way allow residents
to walk, ride or run along the roads or along road-side paths, which often are connected to off-
road paths between neighborhoods."
GP-Cir—pg 4 Roadway Classifications "While most roadways are small and rural, the Town will
continue to require wide rights-of-way in order to avoid large cuts and fill, maintain vegetation
and accommodate paths, drainage, and utilities."
GP-Cir —pg 7 Rights-of-Way "The right-of-way is the area that includes the roadway and the
paved area for driving, as well as other related uses such as utilities, pathways, drainage
channels and roadside vegetation. Objectives stated below will assist the Town in keeping
roadways as natural as possible. Note how the wider right-of-way allows for greater flexibility in
the design of the road and increased opportunities to preserve or provide vegetation as well as
reducing the amount of cutting and filling that would be required. The Town has attempted to
maintain 60 foot rights-of-way for most of its roads."
GP-Cir—pg 7 Goal C-1 Objectives "The policies and implementation measures should result in:
Adequate space in public right-of-ways to accommodate rural roadways, pathways, utilities,
drainage, and vegetative buffers."
GP-Cir—pg 8 Goal C-1 Implementation Measures "Develop right of way standards to generally
accommodate roadway pavement, drainage, vegetative screening, utilities, slopes, and pathways,
and to avoid excessive cuts or fills. A general guide for width would be 60 feet, although this will
vary depending on conditions.Additional easements for slope or line of sight may be required"
GP Cir —pg 13 Goal C-5 Objectives "Spacious rights of ways wide enough so that trees and
shrubs can provide a substantial buffer between the roadway and paths and between the paths
and adjacent properties. The resulting corridor should be pleasing and safe for both vehicular
and non-vehicular travel."
Project Background - The Planning Department's Application Checklist includes a line
item that requires the project planner to determine and disclose to a potential applicant if
a right of way dedication is needed with any development project. In this case, the right
of way records were provided to the applicant and the need for a 20 foot right of way
dedication was disclosed during pre-application meetings. The applicant expressed
concern over the right of way requirement because of the impact to the setbacks and
building site. In discussing options with the applicant, it was noted that Section 10-1.505
(c) (2) states:
Lands of Chen
Planning Commission
October 3,2013
Page 7
(2) Where a lot abuts on more than one such street, easement, or official plan line, the
Planning Commission or the Site Development Authority, whichever entity first acts upon an
application relating to the development of a particular property, shall designate the street,
easement or official plan line from which the forty(40)foot setback shall be measured, which will
in the judgment of the Site Development Authority, have the least negative environmental, visual
or aesthetic impact on neighboring properties and the public at large.
The applicant is proposing a design that utilizes Old Page Mill Road as the front setback
and Gerth Lane as the side setback for this project.
Neighbor Comments
As of the writing of the staff report, the Town has received written comments from seven
(7) neighboring properties. The written comments are included in Attachment #8 in the
order received.
The neighbors unanimously request that the Planning Commission require a 50 foot wide
right of way dedication along Gerth Lane. The neighbors also request the determination
that Gerth Lane be the front property line and to measure the 40 foot front setback from
the dedicated Gerth Lane right of way.
Summary
The applicant proposes a right of way width reduction to 40 feet along Gerth Lane where
a 50 foot width is the standard. The Town's General Plan describes a need for wide right
of ways to accommodate not just roads and utilities but to allow for flexibility of road
placement in a hillside community, to increase options for road grading with less need for
retaining walls, to provide a buffer for vegetation, and maintain and enhance the rural,
scenic qualities of the Town.
Right of way widths are a broad and Town wide topic that need more study and foresight
than is available with a single family residential development project. A case-by-case
approach to right of way dedication may lead to a lack of uniformity and consistency in
right of way width and thereby building setbacks along streets.
Minor modifications to the design and layout of the proposed residence and outdoor
living spaces would comply with both setback and right of way standards and result in a
similar size home, yard area, and use of the property.
Planning Commission Action Items
The applicant's request prompts the following actions of the Planning Commission:
1.) Per the Town's Right of Way Policy, the Planning Commission has the authority to
allow right of way widths less than 50 feet if findings are made for traffic, safety, and
Lands of Chen
Planning Commission
October 3,2013
Page 8
future development. The Planning Commission shall make findings for approval or
denial. -
2.) Per Section 10-1.505 (c) (2), the Planning Commission shall designate the street from
which the front property line shall be measured (Old Page Mill Road or Gerth Lane).
ENVIRONMENTAL REVIEW(CEQA)
The project is categorically exempt under CEQA per Sections 15303 (a).
ATTACHMENTS
1. Findings for denial for reduced Gerth Lane right of way width
2. Right of Way Policy, February 15, 1989
3. Pathways Committee minutes from meeting, May 22, 2012
4. Open Space Committee recommendation email, August 14, 2013
5. Environmental Design and Protection Committee Comments, May 10, 2013
6. Cotton and Shires Associates Letter, July 3, 2013
7. Fire Department Comments, May 1, 2013
8. Neighbor letters of opposition in order received
9. 2240 Page Mill Road CC minutes, January 5, 1994
Lands of Chen
Planning Commission
October 3,2013
Page 9
ATTACHMENT 1
FINDINGS OF DENIAL FOR A REDUCED RIGHT OF WAY DEDICATION
LANDS OF CHEN, 2210 PAGE MILL ROAD
File# 100-13-ZP-SD-GD
1. The proposal is not compatible with the following General Plan Circulation
Element citations:
GP-Cir—pg 1 Introduction "Los Altos Hills, a rural residential community, takes pride
in its narrow, winding roadways which maintain and enhance the scenic qualities of the
Town while providing access to and from residential neighborhoods. The broad rights-of-
way allow residents to walk, ride or run along the roads or along road-side paths, which
often are connected to off-road paths between neighborhoods."
GP-Cir—pg 4 Roadway Classifications "While most roadways are small and rural, the
Town will continue to require wide rights-of-way in order to avoid large cuts and fill,
maintain vegetation and accommodate paths, drainage, and utilities."
GP-Cir —pg 7 Goal C-1 Objectives "The policies and implementation measures should
result in: Adequate space in public right-of-ways to accommodate rural roadways,
pathways, utilities, drainage, and vegetative buffers."
GP-Cir—pg 8 Goal C-1 Implementation Measures "Develop right of way standards to
generally accommodate roadway pavement, drainage, vegetative screening, utilities,
slopes, and pathways, and to avoid excessive cuts or fills. A general guide for width
would be 60 feet, although this will vary depending on conditions. Additional easements
for slope or line of sight may be required."
GP Cir—pg 13 Goal C-5 Objectives "Spacious rights of ways wide enough so that trees
and shrubs can provide a substantial buffer between the roadway and paths and between
the paths and adjacent properties. The resulting corridor should be pleasing and safe for
both vehicular and non-vehicular travel."
2. The application of the standard Gerth Lane 50 foot right of way dedication and
setback requirements do not deprive the owner of privileges enjoyed by other
properties in the area. Minor modifications to the design and layout would comply
with both setback and right of way standards and result in a similar size home,
yard area, and use of the property.
3. The City Council has determined that Gerth Lane is a roadway needing a 50 foot
wide right of way in 1994 with the approval of an addition project at a
neighboring property on the same side of Gerth Lane.
ATTACHMENT 6
2 ) o old
ENVIROMENTAL DESIGN and PROTECTION COMMITTEE
1-'1Application For.
Applicant Name: �. Gamat ®
JUIV
Address D�20th
�a/o '- - - -� i 'OFLOS
Rios mus
Reviewed by �,,� � -
Date:
COMMENTS
Site Impact R.p,p cuCkez r, - Sic\c- — Und-
s - p-v'
Lighting •-0.0 ,wv__• fiv ht11,14,42,0„
,47,0„
Noise 3+► LeAra at_ , )/) o k In-&AL , rkerzri
Creeks
Drainage
Easements
Existing Vegitation
Vlitigation
wiw: Volunteer-LAH 4/6/15