Loading...
HomeMy WebLinkAbout3.1 ITEM 3.1 TOWN OF LOS ALTOS HILLS August 6, 2015 Staff Report to the Planning Commission SUBJECT: A SITE DEVELOPMENT PERMIT FOR A TWO STORY NEW RESIDENCE, SETBACK VARIANCES FOR THE PROPOSED RESIDENCE, HARDSCAPE AND SURFACE PARKING SPACES,A VARIANCE TO ALLOW A PARKING CONFIGURATION THAT CREATES OBSTRUCTED VEHICULAR ACCESS FOR THE GARAGE PARKING SPACE, AND A CREEK SETBACK VARIANCE; LANDS OF HANABE;26691 MOODY ROAD;FILE#400-14-ZP- SD-VAR i FROM: Nicole Horvitz, Assistant Planne APPROVED: Suzanne Avila, AICP, Planning Director Sint • RECOMMENDATION: That the Planning Commission: 1. Continue the requested Site Development Permit with direction to modify the plans to reduce the rear setback encroachment to no more than the existing encroachment; OR 2. Approve the requested Site Development Permit for a new residence, creek variance, setback variances, and parking variance subject to the findings and conditions of approval in Attachments 1 and 2. BACKGROUND The subject property is a .77 gross acre parcel located on the north side of Moody Road, adjacent to Moody Court. The original parcel was created prior to the Town's incorporation. The existing residence was built in 1940. Surrounding uses include single family residences to the west, north, and east, and Hidden Villa across Moody Road to the south. CODE REQUIREMENTS Pursuant to Section 10-1.1007 (2) of the Zoning Ordinance, in reviewing a Variance application the Planning Commission must determine whether the proposed development meets the standards . of the Town by considering evidence in support of the findings for approval (Attachment 1). In addition,per Section 10-2.702 of the Los Altos Hills Municipal Code, structures shall be set back a minimum of twenty-five (25) feet from the top of bank of all creeks, however, lesser setbacks may be allowed where approved by the Planning Commission. Staff Report to the Planning Commission 26691 Moody Road August 6,2015 Page 2of11 DISCUSSION Site Data: Gross Lot Area: .77 acres Net Lot Area .528 acres Average Slope: 11.2% Lot Unit Factor: .514 Floor Area and Development Area: - Area (sq.ft.) Maximum Existing Proposed Increase Remaining Development 7,500 2,014 5,183 3,169 2,317 Floor 5,000 1,167 3,453 2,286 1,547 Site and Architecture The applicant is proposing to remove the existing residence and detached garage and is requesting approval of a Site Development permit and variances to construct a 2,936 square foot two story residence and a 430 square foot garage. The proposed residence is in compliance with the Town's floor area, development area, and height requirements established in Title 10, Zoning and Site Development of the Los Altos Hills Municipal Code. Variance Requests Due to the shape of the property,location of the required leach field and creek,the building site is severely limited. The existing ` -= -- _. - ' — — residence is currently located _— - within the required building -_ - - -'-' ,„. t_ � - ` setbacks and the creek setback. "" — In addition, because of the ,%a� "� - I ,�,,a„�.„�"4. ; F :t--7- 6 right of way dedications the net _- 6! gfr - >r ;i area and setbacks have been 1 °— -7,, t a '"-: ' I-\-la— affected o f�3t new i"� # F 1, , affected and further limit the 4 -',;-72. +' ,'''':-, -:'--":1-'-'' '-1:--\ fh developable area on the r A ', .� " y, property. . �' o - :� i� -7 ovaoio Y._.,_ _ __ The new residence is proposed -- -2-N-----1,..___x-/1„------11-----7'::---,---___,------ _ .--._- ,,;y to encroach within the front, side, and rear property lines setbacks and within the Town's standard- 25' creek setback. In addition, two (2) 10' x 20' required surface parking spaces are proposed within the front yard setback. Staff Report to the Planning Commission 26691 Moody Road August 6,2015 Page 3of11 Per Section 10-1.601 of the LAHMC the four(4)required parking spaces shall be unobstructed at all times. Due to the shape of the property, one of the proposed surface parking spaces is obstructing one (1) garage parking space. The current residence is located 20' from the rear property line. The applicant is proposing to increase the encroachment of the patio/landings to be located 12' and the residence (including eaves) to be located 14' from the rear property line. Staff recommends that the residence and hardscape be redesigned along this property line to be located no closer than existing established setback. The new residence and hardscape is located 16' from the top of the creek bank. The applicant has submitted a report prepared by TRA Environmental Sciences, Inc evaluating the proposed residence's impact on the creek encroachment. The report states that the proposal will not greatly change or improve the creek. However, it will provide an opportunity to enhance and restore the riparian habitat and provided preservation/restoration measures(see Attachment 4). Condition#5 requires an open space easement over the area within 16' from top of bank on the western side of the creek and 25' from top of bank on the eastern side of the creek. In evaluating the variance findings,the Planning Commission should consider the fact that the lot area is a unique shape and the imposition of the same setbacks and zoning standards result in a substantial reduction in the property's buildable area and outdoor areas, and create limitations on the siting of the dwelling and parking areas. The applicant has prepared variance findings and variance request package included in Attachment 5. Outdoor Lighting In compliance with the Town's Outdoor lighting Policy, one light fixture is permitted per door, and two (2) fixtures_ for double doors. The source of light shall not be visible from offsite. Condition#8 specifies included that any new lighting needs to be reviewed and approved by the Planning Department. Trees & Landscaping . Four (4) trees are proposed to be removed with this application, consisting of pines and a privet. A landscape screening and erosion control plan will be required after framing of the new residence (Condition #2). Furthermore, any landscaping required for screening or erosion control will be required to be planted prior to final inspection, and a maintenance deposit to ensure viability of plantings will be collected prior to final inspection (Condition#3). Staff Report to the Planning Commission 26691 Moody Road August 6,2015 Page 4 of 11 Drainage Water from the new residence will be directed into a gravel basin located east of the proposed garage. Overflow will be directed into a bio swale. The Engineering Department has reviewed the proposed drainage plan and found it to be in compliance with the Town's Ordinances and Policies. Grading The applicant is proposing 30 cubic yards of cut and 5 cubic yards for the proposed residence.The Engineering Department has reviewed the proposed grading plan and found it to be in compliance with the Town's Ordinances and Policies. Neighbor Concerns To date, staff has not received any comments from the public. Committee Review The Environmental Design and Protection Committee commented on the creek setback requirement(see Attachment 3). The Pathways Committee recommended dedication 10'wide pathway easement shall be dedicated adjacent to Moody Road and Moody Court. Furthermore, a type IIB pathway shall be constructed along Moody Road (Conditions#22 and 23). The Open Space Committee reviewed the proposed creek setback and determined that is an improvement over existing conditions. The Committee indicated support for the reduced setback request. CEQA STATUS The proposed project is categorically exempt from the provisions of the California Environmental Quality Act per Section 15303(a) which allows construction of a single family residence in a residential zone. ATTACHMENTS 1. Recommended Findings of Approval for Variance 2. Recommended Conditions of Approval 3. Comments from Environmental Design and Protection Committee dated January 9, 2015 4. TRA Environmental Sciences, Inc report dated July 22, 2014 5. Variance Request prepared by the Applicant dated July 29, 2015 6. Worksheet#2 7. Development plans Staff Report to the Planning Commission ATTACHMENT 1 26691 Moody Road August 6,2015 Page 5of11 ATTACHMENT 1 FINDINGS OF APPROVAL FOR THE VARIANCE REQUEST LANDS OF HANABE, 26691 MOODY ROAD File#400-14-ZP-SD-VAR 1. That, because of exceptional or extraordinary circumstances applicable to the subject property, including size, shape,topography, location or surroundings,the strict application of the provisions of this title is found to deprive such property of privileges enjoyed by other properties in the vicinity and under identical zoning classification. The proposed dwelling is located on a substandard sized and shaped lot. Therefore, the imposition of the same setbacks and zoning standards that apply to a one acre conventional shaped lot deprives the property owner of certain privileges, including a substantial reduction in the property's buildable area, outdoor areas, and limitations on the siting of the dwelling and parking areas. The location of creek and leach field further restricts development on the property. 2. That upon the granting of the variance,the intent and purpose of the applicable sections of this title will still be served and the recipient of the variance will not be granted special privileges not enjoyed by other surrounding property owners. The setback variances for the residence, hardscape and required parking area are due to the substantial reduction in the building envelope that results from the strict application of the 40'front and 30'foot side and rear yard setbacks substandard shaped lot, and the required creek setback The approval of the setback variances results in a design that is compatible with the neighborhood 3. That the granting of such variance will not be materially detrimental to the public welfare or injurious to the property,improvements or uses within the immediate vicinity and within the same zoning district. The development of the property will not be detrimental to public welfare or surrounding properties as the proposed development does not exceed the maximum floor area or development area standards. 4. That the variance will not authorize a use or activity which is not otherwise expressly authorized by the zoning district regulations governing the parcel or property. The variance request is not for a use or activity that is not permitted in the zoning district. Staff Report to the Planning Commission ATTACHMENT 2 26691 Moody Road August 6,2015 Page 6 of 11 ATTACHMENT 2 RECOMMENDED CONDITIONS FOR SITE DEVELOPMENT PERMIT FOR A NEW RESIDENCE LANDS OF HANABE; 26691 MOODY ROAD File#400-14-ZP-SD-VAR PLANNING DEPARTMENT: 1. No other modifications to the approved plans are allowed except as otherwise first reviewed and approved by the Planning Director or the Planning Commission, depending on the scope of the changes. 2. After completion of rough framing or at least six (6) months prior to scheduling a final inspection,the applicant shall submit landscape screening and erosion control plans for review by the Site Development Committee. The application for landscape screening and erosion control shall be accompanied by the applicable fee and deposit. The plans shall be reviewed at a noticed public hearing. Attention shall be given to plantings which will be adequate to break up the view of the new residence from surrounding properties and streets. All landscaping required for screening purposes and for erosion control(as determined by the City Engineer) must be installed prior to final inspection of the new residence. The landscape screening plan shall comply with Section 10-2.809 (water efficient landscaping) of the Los Altos Hills Municipal Code. 3. A landscape maintenance deposit in the amount of $5,000 shall be posted prior to final inspection. An inspection of the landscape to ensure adequate establishment and.maintenance shall be made two years after the installation. The deposit will be released at that time if the plantings remain viable. 4. Prior to beginning any grading operation, all significant trees, particularly the heritage oak trees, are to be fenced at the drip line. The fencing shall be of a material and structure (chain- link)to clearly delineate the drip line. Town staff must inspect the fencing and the trees to be fenced prior to commencement of grading. The property owner shall call for said inspection at least three days in advance of the inspection. The fencing must remain throughout the course of construction. No storage of equipment, vehicles or debris shall be allowed within the drip lines of these trees. Existing perimeter plantings shall be fenced and retained throughout the entire construction period. 5. The property owner shall grant an Open Space Easement to the Town over the creek(16' from top of bank on west side and 25' on east side of creek). All existing structures within these areas shall be removed prior to final inspection of the new residence. No structures are permitted and no grading or fill shall be permitted. Native vegetation may be planted within the easement but no irrigation or sprinkler systems are permitted. The property owner shall provide legal description and plat exhibits that are prepared by a licensed land surveyor and Staff Report to the Planning Commission 26691 Moody Road August 6,2015 Page 7 of 11 the Town shall prepare the grant document. The grant document shall be signed and notarized by the property owner and returned to the Town prior to acceptance of plans for building permit. 6. Prior to requesting the final inspection, a registered civil engineer or licensed land surveyor shall certify in writing and state that"the location of the new residence and roof eaves matches the setbacks as shown on the Site Development plan". The elevation of the addition shall be similarly certified in writing to state that "the elevation of the new residence matches the elevation and location shown on the Site Development plan." The applicant shall submit the stamped and signed letter(s)to the Planning Department prior to requesting a final inspection. 7. All hardscape and floor area proposed to be removed as shown on the site plan shall be removed prior to final inspection. 8. No new fencing is approved. Any new fencing or gates shall require review and approval by the Planning Department prior to installation. 9. There shall be one light per door or two for double doors.Light fixtures shall have frosted glass or be down directed. No lighting may be placed within setbacks except two entry or driveway lights. Any additional outdoor lighting shall be approved by the Planning Department prior to installation. 10. Exterior finish colors of all buildings shall have a light reflectivity value of 50 or less and roof materials shall have a light reflectivity value of 40 or less,per manufacturer specifications. All color samples shall be submitted to the Planning Department for approval prior to acceptance of plans for building plan check. All applicable structures shall be painted in conformance with the approved color(s)prior to final inspection. 11. The project is subject to the Town's Construction Time Limit Ordinance (Chapter 10, Title VIII of the Municipal Code). The maximum time for completion of the new residence shall be 36 months from the date of Building Permit issuance. Failure to complete the project in the allotted time may result in substantial penalties and fees. 12. All properties shall pay School District fees to either the Los Altos School District or the Palo Alto Unified School District, as applicable,prior to acceptance of plans for building plan check. The applicant must take a copy of worksheet #2 to school district offices (both elementary and high school in the Los Altos School District), pay the appropriate fees and provide the Town with a copy of the receipts. 13. At time of submittal of plans for building plan check, the applicant shall submit one of the following checklists to demonstrate compliance with the Town's Green Building Ordinance: a. A GreenPoint Rated checklist with the building permit application to indicate that the project will achieve a minimum of fifty (50) points. The checklist shall be completed by a qualified green building professional and shall be attached to the Staff Report to the Planning Commission 26691 Moody Road August 6,2015 Page 8 of 11 front of the construction plans. The construction plans shall include general notes or individual detail drawings, where feasible, showing the green building measure to be used to attain the required points. b. A LEED for Homes checklist with the building permit application to indicate that the project will achieve a minimum of forty-five(45)points or LEED certification. The checklist shall be completed by a qualified green building professional and shall be attached to the front of the construction plans. The construction plans shall include general notes or individual detail drawings, where feasible, showing the green building measure to be used to attain the required points. 14. Prior to final inspection and occupancy, a qualified green building professional shall provide documentation verifying that the building was constructed in compliance with GreenPoint Rated or LEED®certification. ENGINEERING DEPARTMENT: 15. Peak discharge at 26691 Moody Road, as a result of Site Development Permit 400-14, shall not exceed the existing pre-development peak discharge value of the property. Detention storage must be incorporated into the project to reduce the predicted peak discharge to the pre- development value. Provide the data and peak discharge hydrologic model(s)utilized, as well as, the calculations of the peak discharge value prior and post development. Determine the design peak runoff rate for a 10-year return period storm and provide detention storage design plans to reduce the predicted peak discharge to the pre-development value. All documentation, calculations, and detention storage design (2 plan copies) shall be submitted for review and approval to the satisfaction of the City Engineer prior to acceptance of plans for building plan check. 16. The Engineer of Record shall observe the installation of the drainage system, construction of the energy dissipaters, and completion of the grading activities and state that items have been installed and constructed per the approved plans. A stamped and signed letter shall be prepared and submitted to the Town prior to final inspection. 17. All hydrant•use is strictly prohibited by the Purissima Hills Water District. A permit for obtaining water for grading and construction purposes must be obtained from the Purissima Hills Water District, and submitted for approval to the Town Engineering Department prior to acceptance of plans for building check. The permit will authorize the use of water from • specific on-site or off-site water sources. 18. Any, and all, changes to the approved Grading and Drainage plan shall be submitted as revisions from the project engineer and shall first be approved by the Town Engineering Department. No grading shall take place during the grading moratorium (October 15 to April 15) except with prior approval from the City Engineer. No grading shall take place within ten feet of any property line except to allow for the construction of the driveway access. Staff Report to the Planning Commission 26691 Moody Road August 6,2015 Page 9 of 11 19. All public utility services serving this property shall be placed underground. The applicant should contact PG&E immediately after issuance of building permit to start the application process for undergrounding utilities which can take up to 6-8 months. 20. Two copies of an Erosion and Sediment Control plan shall be submitted for review and approval by the Engineering Department prior to acceptance of plans for building plan check. The contractor and the property owner shall comply with all appropriate requirements of the Town's NPDES permit relative to grading and erosion/sediment control. The first 100 feet of the driveway shall be rocked during construction and all cut and fill slopes shall be protected from erosion. All areas on the site that have the native soil disturbed shall be protected for erosion control during the rainy season and shall be replanted prior to final inspection. 21. Two copies of a Grading and Construction Operation plan shall be submitted by the property owner for review and approval by the City Engineer and Planning Director prior to acceptance of plans for building plan check. The grading/construction operation plan shall address truck traffic issues regarding dust,noise, and vehicular and pedestrian traffic safety on Moody Road and surrounding roadways, storage of construction materials, placement of sanitary facilities, parking for construction vehicles, clean-up area, and parking for construction personnel. A debris box (trash dumpster) shall be placed on site for collection of construction debris. Arrangements must be made with the GreenWaste Recovery,Inc. for the debris box,since they have a franchise with the Town and no other hauler is allowed within the Town limits. 22. The property owner shall inform the Town of any damage and shall repair any damage caused by the construction of the project to pathways, private driveways, and public and private roadways,prior to final inspection and release of occupancy permits and shall provide the Town with photographs of the existing conditions of the roadways and pathways prior to acceptance of plans for building plan check. 23. The property owner shall dedicate a 10' wide pathway easement adjacent to Moody Road and Mood Court to the Town. The property owner shall provide legal description and plat exhibits that are prepared by a registered civil engineer or a licensed land surveyor and the Town shall prepare the dedication document. The dedication document, including the approved exhibits, shall be signed and notarized by the property owner and returned to the Town prior to acceptance of plans for building plan check. 24. The property owner shall construct a Type 2B pathway along Moody Road within the 10' pathway easement to the satisfaction of the Engineering Department,prior to final inspection. 25. The driveway shall be required to be fully constructed and to be roughened where the pathway intersects, to the satisfaction of the City Engineer,prior to final inspection. 26. A permit for the septic system shall be issued by Santa Clara County Health Department prior to acceptance of plans for building plan check. 27. Conditions of Santa Clara County Health Department shall be met prior to final inspection. Staff Report to the Planning Commission 26691 Moody Road August 6,2015 Page 10 of 11 28. The property owner shall submit an elevation certificate for the Construction Drawings of the new residence to the Town that indicates the new residence meets F.E.M.A. requirements for the new construction prior to acceptance of building permit plan check. 29. The property owner shall submit elevation certificates for the new residence to the Town that indicates the new residence meets F.E.M.A. requirements for the new construction during Building under Construction and at Finished Construction prior to final inspection. FIRE DEPARTMENT 30. This project is located within the designated wildland urban interface fire area. The building construction shall comply with the provisions of CA building code chapter 7A. Note that vegetation clearance shall be in compliance with CBC 701A.3.4 prior to project final approval. 31. An automatic residential fire sprinkler system approved by the Santa Clara County Fire Department shall be included in all portions of the building. Three sets of plans prepared by a sprinkler contractor shall be submitted to the Santa Clara County Fire Department (14700 Winchester Blvd., Los Gatos, CA 95032) for review and approval. The sprinklers shall be inspected and approved by the Fire Department,prior to final inspection and occupancy of the new residence. 32. Approved numbers or addresses shall be placed on all new and existing buildings in such a position as to be plainly visible and legible from the street or road fronting the property. Numbers shall contrast with their background. 33. All construction sites must comply with applicable provisions of the CFC Chapter 14 and standard detail and specifications SI-7. CONDITION NUMBERS 5, 10, 12, 15, 17,20, 12,22,23,25 and 28 SHALL BE COMPLETED AND SIGNED OFF BY THE PLANNING AND ENGINEERING DEPARTMENTS PRIOR TO ACCEPTANCE OF CONSTRUCTION PLANS FOR PLAN CHECK BY THE BUILDING DEPARTMENT. Project approval may be appealed if done so in writing within 22 days of the date of approval. The building permit cannot be issued until the appeal period has lapsed. The applicant may submit construction plans to the Building Department after the appeal period provided the applicant has completed all conditions of approval required prior to acceptance of plans for building plan check. Please refer to the Conditions of Project Approval set forth herein. If you believe that these Conditions impose any fees, dedications, reservation or other exactions under the California Government Code Section 66000, you are hereby notified that these Conditions constitute written notice of a statement of the amount of such fees, and/or a description of the dedications, reservations, and other exactions. You are hereby further notified that the 90-day approval period Staff Report to the Planning Commission 26691 Moody Road August 6,2015 Page 11 of 11 in which you may protest such fees, dedications, reservations, and other exactions, pursuant to Government Code Section 66020(a), has begun. If you fail to file a protest within this 90-day period complying with all of the requirements of Section 66020, you will be legally barred from later challenging such exactions. Upon completion of the construction, a final inspection shall be required to be set with the Planning and Engineering Departments two weeks prior to final building inspection approval. NOTE: The Site Development permit is valid for one year from the approval date(until August 6, 2016) All required building permits must be obtained within that year and work on items not requiring a building permit shall be commenced within one year and completed within two years. AleAz ENVIROMENTAL DESIGN and PROTECTIOr - ATTACHMENT 3 Application For: 711 L L rz a�` %ECE E° ®9 ZOIS Applicant Name: 9 TOWN OF LOS PITS HILLS Reviewed by � - (,t;)wi Date: r 7 COMMENTS Site Impact • Lighting Noise Creeks 2-Sc► i1-h pa_3rick L- r�n�i P Drainage Easements Existing Vegitation Mitigation wlw: Volunteer-LAH 12/5/14 EbAIDDLEFIELD ROAD.Si IITF 900 ENVIRONMENTAL EXH I BIT-D ATTACHMENT,4 TRA.SCIENCES, Inc. July 22, 2014 MAR 2 3 2015 Srinivas and Vidya Hanabe 26691 Moody Road TOWN OF LOS ALTOS HILLS Los Altos Hills, CA, 94022 SUBJECT: Intermittent Drainage Study—26691 Moody Road Property Dear Mr. and Mrs. Hanabe, As requested, TRA Environmental Sciences, Inc. (TRA) has conducted an evaluation of the habitat values and functions of the intermittent drainage located adjacent to your. Property at 26691 Moody Road in Los Altos Hills, California. The Los Altos Hills General Plan: Conservation Element, Program 1.1 states that"Structures must be set back at least 25 feet from the top of creek banks. To ensure adequate protection of these valuable resources, the expansion beyond 25 feet to the drip line of mature oak trees within the setback is advised."The existing residence and detached garage are situated within this setback buffer. You propose to demolish the garage and a portion of the residence and to reconstruct the residence at a maximum.distance of 20 feet from the intermittent drainage. The following report evaluates the impacts of the existing and proposed new structure on the intermittent drainage. 1.0 Site Location The Hanabe Property(Property) consists of 0.83 acre situated north of Moody Road and south of an unnamed intermittent drainage tributary to Adobe Creek. The property is located just east of the intersection of Moody Road and Moody Court in the Town of Los Altos Hills. To the immediate northwest are several other residences, with lands to the north and east undeveloped and consisting of a mosaic of oak woodland, coyote brush scrub, and annual grassland habitat. Hidden Villa is situated to the south, across Moody Road from the Hanabe residence. It is comprised of a wide band of open agriculture fields bordered to the south by a similar mosaic of oak woodland and coyote brush scrub habitat. To the west of the site are scattered, low-density residential developments which generally preserve the surrounding natural oak woodland and coyote brush scrub habitat. 2.0 Methodology I performed a site visit on May 23,2014. Weather conditions were cool and partly cloudy with a slight breeze. During the visit, I walked the site, and evaluated the habitats that were present, the condition of the creek, and developed a list of plants and animals that were observed on the site. She also evaluated the potential for the site to support plants and animals that were not presently occupying the site, but could potentially occur. I also reviewed the California Natural Diversity Database to obtain a list of special-status species that have occurred on or within a five-mile radius of the site and within the last 25 years. I evaluated the potential for the habitats on the site and immediately surrounding areas to support special-status species breeding, foraging or migratory habitat. ENVIRONMENTAL AND BIOLOGICAL IMPACT ANALYSIS PERMITTING I APPLIED GIS SERVICES + I Hanabe Property—Intermittent Drainage Study 2 Addendum July 22, 2014 3.0 Site Description The Property consists of a single family dwelling that is situated immediately southwest of a southward bend in an unnamed tributary to Adobe Creek. The south'side of the Property is landscaped with Monterey pine and a variety of ornamental shrubs and bushes and has a small lawn and graveled area for parking. The north side of the Property has a lawn, two small brick hardscape areas, and minimal landscape planting consisting of a fig tree and several large cherry trees (Prunus sp.). Naturally-occurring non-native Himalayan blackberry(Rubus armeniacus) and California bay(Umbellularia californica) have been heavily pruned along the boundary of the hardscape. The unnamed intermittent drainage flows in a west to east direction, turning south immediately adjacent to the dwelling and discharging to a set of two corrugated metal culverts at Moody Road at the southeast corner of the Property. A small, private concrete footbridge spans the drainage just upstream of the culverts. A detached garage is situated east of the bend in the drainage approximately 25 feet east of the residence. South of the garage is a chipped gravel driveway and parking area and west of the garage is a narrow brick paved pathway(Attachment 1, Site Plan). Upstream of the Property the intermittent drainage provides high-quality habitat for plants and wildlife. There is a dense canopy of mixed oak riparian habitat associated with the drainage which is likely to support foraging and breeding habitat for wildlife and habitat for native plant species. Within the Property boundaries the drainage has been impacted by the proximity of the residence and human activities, including what appears to have been historical clearing of over story and in-channel vegetation. Downstream of the Property the channel flows in a southward direction across the Hidden Villa agriculture fields where it joins Adobe Creek. Within the Property boundaries the channel consists of a defined bed and bank that has an average depth of approximately 3 feet. Near the west end of the Property there are two large cherry trees and a mature live oak (Quercus agrifolia)tree that provide a moderately dense canopy cover with an understory of annual grasses and blackberry and little to no in-channel vegetation. Immediately north of the Property, it appears that trees may have at one time, been cleared from the channel. No evidence of recent clearing, such as disturbed soils was evident at the time of the visit, but the presence of disturbance tolerant grass and forb species in the intermittent drainage channel and the absence of any canopy cover suggest that trees may have been removed historically. Dense ground cover has developed in the channel where tree canopy is absent. The ground cover is dominated by non-native grasses and forbs, including ripgut brome (Bromus diandrus), poison hemlock(Conium maculatum) and milk thistle (Silybum marianum). Native plant species are also present including dense thickets of blackberry, water smartweed (Persicaria amphibia), and soft rush (Juncus effusus), and on the south bank of the drainage, immature live oak and California bay trees. Along the eastern boundary of the Property, the tree canopy is still in place, and is comprised of several California bay trees and a large pine tree (Pinus sp.). The understory of this portion of the drainage has been colonized by non-native plants including common periwinkle (Vinca minor) and English ivy(Hedera helix), and some common natives such as mugwort(Artemisia douglasiana)and California blackberry ENVIRONMENTAL AND BIOLOGICAL IMPACT ANALYSIS I PERMITTING I APPLIED GIS SERVICES Hanabe Property—Intermittent Drainage Study 3 Addendum July 22, 2014 (Rubus ursinus). A complete list of plant species observed during the survey is included in Table 1, below. 4.0 Special-status Species A report of special-status plant and animal species that are known to occurr within a five mile radius of the property in the last 25 years was obtained using the California Natural Diversity Database. No special-status species were reported for the project site, however several species have been known to occur in.the general vicinity of the Project area. Special-status plants included: • Arcuate bush-mallow(Malacothamnus arcuatus)—occurs in chaparral habitat. Presumed absent due to lack of suitable habitat. • Western leatherwood (Dirca occidentalis)—occurs in riparian woodlands. Moderately likely to occur. • White-flowered rein orchid (Piperia candida)—occurs in upland forests with serpentine soils. Presumed absent due to lack of suitable soils. Special status animal species reported by CNDDB included: • Bay checkerspot butterfly(Euphydryas editha bayenis) Federal Threatened -occurs in grasslands with serpentine soils and where host plants, dwarf plantain, Indian paintbrush, and purple owl's clover are present. Presumed absent due to lack of suitable soils. • Unsilvered fritillary(Speyeria adiaste adiaste)—occurs in openings of redwood and coniferous forests and where host plant, violet species, is present. Presumedabsent due to lack of suitable habitat. • Steelhead —Central California coast DPS (Oncorhynchus mykiss irideus) Federal Threatened —occurs in aquatic habitats. The intermittent drainage is confluent with Adobe Creek, where steelhead are not known to be present(NMFS-NOAA GIS Shapefiles 2005). Presumed absent due to lack of suitable aquatic habitat and absence downstream. • California red-legged frog (Rana draytonii) Federal Threatened, California Species of Special Concern— Breeds in ponds and other sources of permanent deep water with dense emergent or shrubby vegetation. Not known to occur on the site or in nearby Adobe Creek, but is present 2.5 miles north of the site in Matadero Creek. Not likely to breed or forage on the site due to lack of suitable habitat, but could use the site as a migratory corridor. • California tiger salamander(Ambystoma californiense)— Federal Threatened, California Threatened occurs in annual grasslands with seasonally inundated breeding ponds and mammal burrows for aestivation. Presumed absent due to lack of suitable breeding and aestivation habitat. • Western pond turtle (Emys marmorata)—California Species of Special Concern —occurs in aquatic habitats with sandy banks or open grasslands for egg laying. Western pond ENVIRONMENTAL AND BIOLOGICAL IMPACT ANALYSIS I PERMITTING I APPLIED GIS.SERVICES Hanabe Property—Intermittent Drainage Study 4 Addendum July 22, 2014 turtle is not known to be present in the intermittent drainage or in Adobe Creek but is presumed to have a moderate potential to be present due to the presence of suitable habitat. • San Francisco dusky-footed woodrat(Neotoma fuscipes annectens)- California Species of Special Concern - occurs in forested habitats with a moderate to dense understory. No dusky footed woodrat stick houses were observed, so presumed absent, however suitable breeding and foraging habitat is present. • Hoary bat(Lasiurus cinereus)- Roosts in dense foliage of medium to large trees, near water and forages in open habitats. Moderate potential to occur. Other protected species that could be present on the site include nesting birds and raptors. During the site survey, multiple bird species were heard vocalizing and are assumed to breed in the habitats around the site. There was no evidence of current or past raptor nesting within the boundaries of the site, however dense riparian habitat and open agricultural land adjacent to the site provide suitable foraging and breeding habitat for red-shouldered hawk(Buteojamaicensis), red-tailed hawk (Buten lineatus), Cooper's hawk (Accipiter cooperii), and sharp-shinned hawk (Accipiter striatus). In addition, there is a potential for bat species to roost in trees on the Property as well as within the structures on the residence. A complete list of animal species observed during the survey is included as Table 2, below. Nesting birds, including raptors, are protected by the California Fish and Game Code section 3503 and section 3503.5.The Migratory Bird Treaty Act implements various treaties and conventions between the U.S. and Canada, Japan, Mexico and the former Soviet Union for the protection of migratory birds. Roosting bats are protected as non-game species under California Fish and Game Code §4150. 5.0 Evaluation The existing residence was constructed 10 to 18 feet from the drainage, with portions of the hardscape area and fences as little as three feet from the top of the bank of the drainage. The construction of the house close to the intermittent drainage has influenced the habitat in several ways. • More runoff from hardscape- Irrigation of the lawn and other landscape elements has altered the hydrology of the site over an extended period of time by contributing more runoff to the drainage and potentially by increasing the nutrient load of the drainage with added fertilizers. • Lack of natural erosion protection -Vegetation on the south bank of the creek appears to be providing insufficient bank protection. Several deep cracks run parallel to the banks of the channel, indicating that the channel is in danger of slope failure and erosion. • Less cover and foraging habitat for wildlife- Natural riparian systems typically have a well-developed tree canopy and an understory comprised of such species as blackberry and mugwort. Where trees are absent, the drainage has been colonized with species more typical of a disturbed annual grassland habitat. This lack of typical vegetative cover ENVIRONMENTAL AND BIOLOGICAL IMPACT ANALYSIS I PERMITTING I APPLIED GIS SERVICES • Hanabe Property—Intermittent Drainage Study 5 Addendum July 22, 2014 contributes to a break in the continuity of the riparian corridor and reduces the quality of the habitat as foraging, breeding and migratory habitat. • Presence of non-natives— Planting of non-native ornamental species provides opportunities for those species to invade adjacent habitats and outcompete native plant species, reducing the diversity of plant species and habitat quality for wildlife. English ivy and common periwinkle, two invasive non-native species have begun to colonize the intermittent drainage channel. • Proximity to humans—The presence of humans in the residence and surrounding areas and their activities such as conducting landscaping activities that impact vegetation has likely discouraged wildlife use of the area and has impacted natural vegetation. 6.0 Regional Influences Clearing of natural habitat and channelization of the intermittent drainage downstream of the Property at Hidden Villa has had a greater influence on the riparian corridor that those changes associated with the Property. The natural meandering configuration of the drainage has been altered for an approximately 300-foot reach of the drainage where is crosses the Hidden Villa agriculture fields. Some trees still remain, but the dense canopy that is typical of the drainage upstream of the Property and downstream of the agriculture fields is almost completely absent. While Hidden Villa is an organic farm, and as such is assumed to limit the use of chemical fertilizers in their agricultural efforts, this use of the surrounding land is still likely to increase the runoff of nutrients to the drainage along with increasing deposition of sediment as a result of tilling of soils, harvesting of crops and the need to drive equipment across the site. 7.0 Conclusions and Recommendations You have proposed demolishing the garage and a portion of the residence, and rebuilding the residence so that it is situated a minimum of 20 feet from the intermittent drainage. Relocating the residence to this distance will not greatly change or improve the influence of the structure and associated activities on the intermittent drainage. It will, however provide an opportunity to enhance and restore riparian habitat associated with the drainage. The following measures are recommended: • Replant with natives— Replace non-native plant species with drought tolerant natives common to the creek corridor upstream of the Property. These species are better adapted to the conditions of the site and will require less maintenance, fertilization and irrigation. This will reduce the impacts to the hydrology, increase habitat for wildlife, improve the connectivity of the riparian corridor, and reduce the need for landscape maintenance that is disturbs nesting birds and other wildlife. • Add natural erosion control to the banks of the drainage— Planting of blackberry and other ground cover vegetation that will establish roots and help to diffuse sheet flow of storm water will improve the stability of the banks of the drainage. Work within the bed and banks of the channel may require obtaining a Section 1600 Lake and Streambed Alteration Agreement from the California Department of Fish and Wildlife. ENVIRONMENTAL AND BIOLOGICAL IMPACT ANALYSIS PERMITTING I APPLIED GIS SERVICES Hanabe Property—Intermittent Drainage Study 6 Addendum July 22, 2014 • Use permeable hardscape — Replace brick pavers with permeable hardscape. This will further reduce the amount of runoff to the drainage and help to slow the erosion of the south bank. Provided that construction of the ,new residence is completed without a) any discharge of pollutants, sediment-laden storm water or fill to the intermittent drainage; or b) tree removal or other activities that may impact nesting songbird, raptor or bat species; the project is not anticipated to have any negative impact to the intermittent drainage. Relocating the residence to its proposed new location, 20 feet from the intermittent drainage will generally benefit the intermittent drainage by decreasing the impervious surfaces immediately adjacent to the creek and by slightly decreasing human interaction with wildlife that uses the drainage. Table 1 — Plant Species Observed Common Name Scientific Name Unidentified pine Pinus sp. Cherry tree Prunus sp. Coast live oak Quercus agrifolia California bay Umbellularia californica Ornamental.fig Ficus benjamina Wild rose Rosa californica English ivy Hedera helix Himalayan blackberrry Rubus armeniacus California blackberry Rubus ursinus Coyote rush Baccharis pilularis Ripgut brome Bromus diandrus Soft rush Juncus effusus Poison hemlock Conium maculatum Mugwort Artemisia douglasiana Water smartweed Persicaria amphibia Milk thistle Silybum marianum Italian thistle Carduus pycnocephalus Periwinkle Vinca minor Ornamental iris Iris sp. Table 2—Animal Species Observed Common Name Scientific Name Anna's hummingbird Calypte anna ENVIRONMENTAL AND BIOLOGICAL IMPACT ANALYSIS I PERMITTING I APPLIED GIS SERVICES Hanabe Property—Intermittent Drainage Study 7 Addendum July 22, 2014 Nuttall's woodpecker Picoides nuttallii Black phoebe Sayornis nigricans Western scrub jay Aphelocoma californica Stellar's jay Cyanocitta steller Wrentit Chamaea fasciata Chestnut-backed chickadee Poecile rufescens American robin Turdus migratorius Spotted towhee Pipilo maculatus House finch Carpodacus mexicanus 8.0 References Burrill, Steven A, Cudney, David W., Nelson, B.E, and Whitson, Tom D., 2001, Weeds of the West, University of Wyoming, 9th Edition. CNDDB 2014, California Natural Diversity Database, Biogeographic Data Branch, Department of Fish and Game. NOAA-NMFS 2005, Critical Habitat GIS Shapefile by the National Marine Fisheries Service (NOAA Fisheries) Southwest Regional Office (SWR). Sibley, David Allen 2000. The Sibley Guide to Birds, Alfred A. Knopf, 1st Edition. TRA has appreciated the opportunity to work with you on this project. Please do not hesitate to contact me should you have any questions or concerns or are in further need of our services. Si cerely, Robin Dakin Senior Biologist (408) 439-2938 (mobile) dakin@traenviro.com ENVIRONMENTAL AND BIOLOGICAL IMPACT ANALYSIS I PERMITTING I APPLIED GIS SERVICES Hanabe Property—Intermittent Drainage Study 8 Addendum July 22, 2014 Attachment 1 -Site Plan jPl eho derij ENVIRONMENTAL AND BIOLOGICAL IMPACT ANALYSIS I PERMITTING I APPLIED GIS SERVICES ) ., Hanabe Property—Intermittent Drai',_ __.Study;Attachment 1 Page 8 Attachment 1 —Site Plan III i�n0..., j% i 11\ . — 0. �.- ` II I' \. / �11 .4 1 \\\ \\' ....., \ „. :;".; \.. v, \ I1 11 , ; � 1 ` % 1, _ 1 g Irt1 0 .11 lr o I ' 4 _\• v -\ i'1 I : 4-' I 1 j_- 1 11 73 1 I Y. i I ,.,.... ., Ail; . . ., • \ F,, ,:Pa \ 1 1 ---/ 1 r-I` 11 - • I1111 1 I )\-' 11 �j ;SI_2x..''4_1__,, • . \\\ \ ,\ V; I, € I l 1 1. 1 .- 1, 'i# I (I 1 1 1 ' 1, 4p�►p I / \' f \ \ \I::4\ '';;•:;,.\ . 1 \ 1 ...; <N...„.....N.:. 8 /...+c;!..-- '/ ' V.',\ 1 \ i '! I , ' 1 '.N, /, ,- / .., / • \ I \ ''� \ \ 1 .. I F1�/ 1 l I 1. t. 1 .___ ill ' `' / �✓/c / I I ' 'yr • '; '1''''..';:,1-...-.•-,..----..;\ ....-,:i..--;.::': ...„,.. - -4,-'..-----1" • .. ',./ ' ____,,. lar �,, i_- _,--,,,i i-�' t� `.4 . , ,•. ',.--.--,,,,,,, r, i .. `I 1.1 _.^_1,,,./.... ,'\ \ 1 1[. 11 \ ',1r :71.' 1..../ /`,!. E I , , ,„, ,• , . . . '� 1 1 �°" 1 GG-, - I - ' _•�`. .., . , . ..!, / ,,,,,,.. / )/ 1 / II / , ) / i, // , , ) . / . ' / ./ ' ,, , . T LLLLL CHAPMAN CLIENT DATA NOTE * LLLLL ASSOCIATES P HANABE RESIDENCE JOB NO.21357 _ LLLLL Li ALTOS.G 9:0(650)941-6890 PHONE NO.MOODY RD., )2V3�9)S OS.CA 94022 DRAWN BY: ATTACHMENT 5 151 LI FT:171 CHAP.MA ; _ A k k ASSOrt S AFSi[)TNT/AL [)LSGN - 26991 Moody Road • ana e Residence • Variance Request 7/29/2015 Hanabe Residence Variance Request 26691 Moody Road Property Constraints This property has a highly irregular shape that prevents it from meeting any of the standard requirements for development in Los Altos hills. It is however a legal developable property with an existing residence and a modern septic field. The existing house is what would be called a legal non-conforming structure; a permitted building that does not meet the current required setbacks. The property is a long narrow sliver of land that hugs a curve of Moody road as it tapers to nothing on the Eastern end, abuts an open space reserve on its Northeast boundary, and has only one adjoining neighbor on the North side. The Western boundary fronts onto Moody Court. Due to the unusual shape, if you apply the required setbacks, 40' at the front, 30' at the sides & rear yard, make provision for a setbacks of 25' from the creek that cuts through the property as well as the required setback from the existing septic field that serves the property, there is virtual no building site left to develop. See attached Exhibit "A". As you can see on the diagram after taking into account all required setbacks the remaining developable footprint, 474.24 sq.ft., is not even large enough to accommodate the required four off street parking spaces let alone a reasonably sized home. This fact was acknowledged by both the Planning Commission and City Council when a lot line adjustment was approved in 2006. "The building area on the Kirk property (26691 Moody Road) is constrained by lot depth and the required setbacks..." "...any new construction or major project on the Kirk property would probably require Planning Commission review for a variance." In knowing this they added a Conditional Exception stating that "...any other landowner shall not be deprived of the reasonable use of his land nor be subjected to undue burdens or hardships or be deprived of any material use or enjoyment of his property." The approval of the lot line adjustment resulted in the Kirk property no longer being a substandard lot as it would have a Lot Unit Factor of greater than 0.50 which gives the property a FAR of 5,000 sq. ft. and a MDA of 7,500 sq. ft. The property owner recognizes that a house of 5,000 sq. ft. is not realistic on this site. What we have done, is to try and make sense of this property and apply reduced setbacks in a reasonable manner to create a viable building site. This will have minimal impact on adjoining properties. See Exhibit "B" The only fixed constraint is the required 10' from the septic field. Since the septic field is in what would technically be the front yard the proposed front setback for this new building envelope would be 87'-5". We are also proposing a street side yard of 15' where 30' is normally required. We are proposing a setback from the top of creek bank of 20' where 25' is normally required, and a 15' setback on the interior side yard of the property where 30' is normally required. Even with these reductions in setback the building site that has been created allows for a buildable area of 2414.0 sq. ft.. We are proposing a main floor of 1,719.60 which is only 550 sq.ft. larger than the size of the current structures. When including the second floor of 1,734 sq.ft., the total square footage is a modest two story home of 3,453.60 sq.ft.. See Exhibit "C". Neighborhood Impact When you look at the placement of the proposed residence relative to structures on other properties you will find that theses reduced setbacks do not result in any greater impact then the home that exists today. This is clearly demonstrated by the dashed line shown ringing the new residence. It represents the 60' distance that is maintained between residences in Los Altos Hills by the required 30' min. building setback. See Exhibit "D". The closest neighbor's home on the adjoining property is located at the opposite end of their property from the boundary closest to the proposed residence. Between the required setback from their common boundary and the riparian corridor that cuts through both properties, there would remain a substantial distance between the two homes. Moody Drainage Channel Sometimes referred to as a creek it is recognized as Moody Drainage Channel by SCVWD and is part of the watershed for Adobe Creek. It is considered a seasonal drainage channel by the Health Department and therefore requires a 50' setback for the septic system. Due to undersized culverts at the bridge on Moody Road the Channel is subject to flooding over its banks during heavy storms until the water can flow over Moody Road and back into the natural channel. A study has been done on the drainage basin above Moody Channel by Lea & Braze Engineering to determine a Base Flood Elevation for the property. The proposed house has been designed to accommodate FEMA's requirements based on the appropriate flood zone designation of Zone "C". An environmental study has also been prepared by TRA Environmental Sciences to assess the health of the riparian corridor along the drainage channel were it crosses the property. Recommendations have been made for how to best restore the native vegetation on both sides of the channel once the existing home and detached garage are removed. The increase of setback from 4'-3" to 20' will allow for much improvement in this regard. See Exhibit "E". As proposed this project would result in a reduction of 75% of the current impact on the riparian corridor. Variance Requests Based on all of the afore mentioned constraints & data we are requesting the following variances; Street side yard setback of 15'-0" where 30' is required. Interior side yard setback of 15'-0" where 30' is required. Creek side setback of 20'-0" where 25'is required. Parking exception for both tandem parking and parking encroaching into the required street side setback to accommodate four off street vehicle spaces. By comparison the existing structure currently has setbacks as follow: Street side yard setback of 20'-10" where 30' is required. Interior side yard setback of 20'-1" where 30' is required. Creek side setback of 4'-3" where 25'is required. Parking is currently tandem and encroaches into the required street side setback. Note: All setbacks noted are to base of structures. See chart on Exhibit "F" which provides setbacks to eaves for proposed residence. Alternative Solution A remodel of the existing structure was considered. Under current planning and building codes the alternative choice for the property owner is to repair the current structure in its existing location which is 4'-3" from the top of bank and propose an addition or additions to expand the structure. See Exhibit "G". However, due to the constraints of the site, these improvements would also require set- back variances and exceptions from parking requirements and would accomplish nothing in regard to reducing impact on the Moody Drainage Channel riparian corridor. Variance Findings Based on all the pertinent data stated above it is clear that all necessary findings for the variance can be made. 1. Because of exceptional or extraordinary circumstances applicable to the subject property, including size, shape, topography, location or surroundings, the strict application of the provisions of this title is found to deprive such property of privileges enjoyed by others in the vicinity under identical zoning classifications. This has already been acknowledged by Planning Commission and City Council. 2. That upon granting of the variance, the intent and purpose of the applicable sections of this title will be served and the recipient of the variance will not be granted special privileges not enjoyed by other surrounding property owners. A single family residence falls within the applicable sections of this title. Reduced setbacks are currently enjoyed at this property and other properties located on upper Moody road. So approval of variances would not be granting of special privileges. 3. That granting of such variance will not be materially detrimental to the public welfare or injurious to the property, improvements or uses within the immediate vicinity and within the same zoning district. All proposed improvements to the site would not result in any increase of impact to the vicinity and if approved would result in direct benefit to environmental impact on the Moody drainage channel. 4. That the variance will not authorize a use or activity which is not otherwise expressly authorized by the zoning district regulations governing the parcel or property. Property is currently and will remain residential which use is specifically authorized by zoning district regulations. Thank you for your consideration of this matter. Walter Chapman . • FOOTPRINT OF EXISTING AVAILABLE BUILDABLE • DETACHED GARAGE • AREA=47424 SQ.FT. • (SHOWN HATCHED) *_—LNE • - ,1 jj•/e `,``, I. "))•-c ad _ ` �/ ;, (TOWN OF LOS ALTOS HILLS) \ pppNOVEO�Fofi ...r� BYRNE PARK ; s 1� \ - RESERVE __.--- Is \\\ . . ---, -- pE� uNE . `\ \ v 1 -- - FOOTPRINT OF EXISTING `�\ RESIDENCE N. j • `N • • HIDDEN VILLA I . • : I ' I . I PROPERTY CONSTRAINTS STUDY-EXHIBIT A I PROPOSED BUILDABLE --------_._ AREA= 2,414.42 SQ'.FT ---PERT!_•- - `� TOP OF \ ''' BANK `� . • TOP OF ````. \ BANK �` `\ rt.:7 • PROPERTY LINE _ - ` , A \ \ ------ ---- -- -------- 11 f 1 \ \\ \\ .. • .\ ;1 111 VS-0. 1 _ 1 J �� ;\\ `\\ j 1 \ 1 P-ovED \ % g pT1CFiELSFOR ; 1 �,\�,' �Ob\ r 7 gEOROOM 1 - -. - \\\\\\\\ \\ 1 \ _ ;1 1111 - �----... `\` `` ��_.-``'_ I -_�--r CURRENT BUILDABLE \\ \ \-_r- AREA \\ \. l- EpSEME --r--r--_ _ \\ ` \ \\�-- _ \ T= s _.� ~ rte' ..� ----t;--- .-. .. . r _ - --`� ._OFS'--PROPS__ u ., 1 i PROPOSED BUILDING ENVELOPE-EXHIBIT-B • ' • • ' I • PROPERTYIINE \ • '` TOP OF' '.\ mss. .. ---- `.`. . BANK '\ ``. p TOP OF `. . •\\ .\ ` \ _ K m BAN• _PATIO `� ` \\ � ��, • O a �' .. Li. \\ _ \ `.ARO • ' xi i n14 x 2oA 5�0. \\. \; \ • (i • LINE • -7.eo €• c�' �-'"v POQO \\ \ \1, PROPERTY - • at p t '" A*`x.. r P \ .. ���xw�� :T.`�caw S pis; \• - i ' 1-44,' ga t t xr r t, F2 ,, \ `� �� �i\PPS\PN \ \,` t a,crt t r. .� � 2\ ;'•y6 \OOP .. • \ --------- ' \ 44a e. ,f- ..A..1.14.1.4..*`.t, VOA-4, \ \� OOF� \ % \ r-- \ "t,�,,,, ,111 ,. `\" :,k a= \ ' \PC ; :; \ `�` • .\\ - tt - - i \\ g ", a E \ ,2 P\PLOP '`\ \ _ t` \\ tt PATIO ,,. - -47;t'''' -411111111 ^ • J 00°P\ ��1 \ - �` A\ it .'SEPTIGFIELOFOR 1s `__. 70 .. \ gyp\ T-BEDROOMS t \ _i '\�\- - \ '0\ 1 0 --- \\� \\ -�'� a 1t t, ENT \ Z` .t -� 5ig .TEASE= \\ \ \� • L_ `� _ .. FOOTPRINT OF PROPOSED \ \\\ -'-_-_• RESIDENCE \\\\\ -`-- \\-'� EDGE OFROPD - '=_ '\ \ .y- � _ _-- OPERN 'NEWRESIDENCE ... \ -✓ ----------- --- HOUSE =1288.80 SQ.FT. - _ - _ ------.--• ._ GARAGE =430.80 SQ.FT. BUILDING FOOTPRINT =1,719.60 SQ.FT. J , SECOND FLOOR =1734.00 SQ.FT. ure ! • • • ,TOTAL FLOOR AREA -3453.60 SQ.FT. .. " • . M.F.A.ALLOWABLE =5000.00 SQ.FT. • . ' . NEW RESIDENCE-EXHIBIT-C • \ \ ' .'. ': ' • '' . • . ..EMEZEI . . • \ 's • : '''. '' ' :. '(TOWN OF LOS ALTOS HILLS ) .• . , • .. . '• .• • •• ;., . ., • . , . . ..' : . • .• \s, . ; • : \ -:' •• • -- '- •• :. BYRNE PARK OPEN - •:-..:.-•: . ....- ‘.. .. . ..Y..:•,...'. .-...:.,• . .-. '....• •-.. .: ' :.: . . - 1 . , • • ..._ • • • . . . . . . .. .•\ ' -.'. .•'' ..•-', SPACE RESERVE • . ...• '.. •-. ..... .--.., r••••,, , •.L;... ...... - . • • . . \ .., ,.. ,..,... ; . . . . . • • -‘ .. . - •,,, ... • . . . • . 26811 MOODY COURT . : • ' - • - • . • %•.6... •••••• - -:. . . • • , • ' .LOS ALTOS HILLS, CA : . •' •• . ' ' • • • /- . - . - • • .• •• - . . .. . .; • • • Cis••• .' ' ' • ' MOODY CREEK-.. .' • - . . • • ,\ \ • - *\ \:, • • ., .. \A \ : • • . : -.•••• .. .. .. i: i,' ' .-:: ' . • ----., --.„.......... ..• ,::•. • ..., • , , ..- • •,,,,,...x< - ••• ''. ' '• '-, - •••• '' . •••••• •••• ••• .. : - - • . • . ' ' • .. , ------- •------'-••• .. •• . ' ' vgi,-, -,,a, , . . . . 60'.MINIMUM SETBACK L...--------___ ---, • --..--"' ''' ••- • •\, NV '' ' •. BETWEEN STRUCTURES , 7 . . • • „v.v..= - ,.., ,....—_"-:,- --, - . .:• aa,:k•E • ,.... \ - .. S. S. ft c7!t*,4...Z.:-..-, \\ . :30' SETBACK : ' ' • . •• • , • --.. • ••,,,,,,,,,,,,,,,,:,,,,,, , in s „ . • : ... - .. - - -------------) 1 \ ----...... • ___:__ -__,___ . .., .. , ‘ , •. \ - . i %, -, \,,' 7-'----... " . . . .. (TOWN OF LOS ALTOS.HILLS ) , _-., , _---- --j.-_j ----.---- --------__ ------_---- ------) _'----_-_--------- " BYRNE PARK OPEN : ._____---------------- - ---. ------------------------------------- -----NI 10' -- ' -• : ' . - • •• . SPACE RESERVE • 'i vi-0-01) . I • '' .• :. •.' • , _. . . . . . . . . , . . . . , . PROJECT ADDRESS - "'T . ',.. :-. .. ' . '.- • . . . - ' . •N N 26691 MOODY ROAD • .. - • . . -• -- '• -... LOS ALTOS HILLS N , CA . N " • . • : ,.. ..•.-.• • •• •_.. . . ., ..- ... N N . •, I I-- 0 • . -•' - . r....-.• . •• HIDDEN VILLA. .:-. :. ,•:. •• . .: ........: .. . L.. \ -\ . . z \ . . . . - - - NEIGHBORHOOD IMPACT-EXHIBIT-D . ..• . -•- ' :..: : ' -... : . . . ' .i . . . . . . , . . • . , - .. .... . . .... . ... _. .. .. .... . . . . . , . • • • . . . ' . . . . • •• . • . . . . . • . . . . . • • • • •, . . " "• 1.. -• , . . . . • • , . • • • . • • • ..•-• - -------- ' • ss,., 0 EXISTING DETACHED . . .. ...,' • • - " • : ‘''s GARAGE ' . - ...-.• ... . - •• -- ..._._-.---- s, 4,,, `.... . -•..,'.• TOP OF BANK ' \ , . • , . • . .. _. . . .• . . ' . • . , -. . • - ENCROCHMENT s ‘ • - •:‘,'fAr.c ' . . . • i 1 \ \ . ,,,,,...., „,,,, . ...,. , • .. .. .. , • : •u.1 z • ' 1 -°CI • - . • \ c•\ - •••• •' ',',A .Yt,%%"\ • Ns. ' • . ' . . . , - • •P x • ' ',.%' • v'' " \.o, • . . . . • , . • ' • r4 - • • ........::::,,,...,....a..z..ggARR.:,?....,.,....1 -• .: ' . \1f.v\ % . • ,/A . . . • • :.:,..::::::::0-6E.M.1:RESNEERI8:.-•,..- ,0,2 i. •\is ` • • ',.1 . . ...:0,0 . . - \•((%A. .), • • ' •. . .•...., ' • • • . . ' ,"•• .iii,PERMIP:}:::4:.M.Rigg.agN.V.-.91:1:ti. •,, • . • • .PROP. ERTY LINE'.. - . . -- I.-. •- •-.1-.. .•:•,. ' ••..' .,...•::Ie:•::.0:...s::.40lig45s.0ge:0g0gisE:•.RNENBE0Es84 ®RESIDENCEi•••.••. \\-.••-\N.• . /,'2.,1.7.•7 7.7..,.•.,,..,.1,/,,,,',• \\ • •. . ..,,-N/s-e.4 1-•.. • , ... . \ • 1 • ' .. •,'• ''.,'• •.-...------------1" . ' • •::•fig::••••••••••...MEgiggigaggagnieggA.:K....K:M'....••••'Regag:I•••..7t.t.'-:- • 0 . \ \ '''''''%''O'F',6r'S • \ •! • \ ; \ •. . • ..•••••••.::5]•illgKi;i.:giiM:.••:.•,N.::::•••:n•':]:.-.:-.-•:55••.-]:iigii•i•-:4::•''•••:-•: ••',:i-••:::::-:•::ial::•-..-:-:•:•.:-.0,1•11 . • . \ ."V .4,005'k, ,‘ • % • , \ '.••••••:•.!!".•:••••••.7.••••••••••'.•••••7f."."'.:1•••••••"'•••••••-----941_'•••••. 7-:-7:-.:':-.:;-''' 1 - •• • ..• \..• \ ',, ° -/',-,'', • . ' \ . . • r_ . . 1:••:-:::::•••:1•••1•i:•,.:::•i•i:-..•':::••••:•ing,1-'4:•':i•••00.:'.•• ''•••••••••1.--;!•:JefIV:. 1 • Pi\C'I'l \ \ -'(i0%02,'• .. \ • - \ • \ . - ............_._........... . - X • - • '• ••- - '-. • .. "•--• :\. •.' • . . NiZ77..::::.'§i:-..;:Mg.f.:-2:7- - - ..-v;;INg., - 21:00°11,____-:.• -‘-10-011-\ %%';',%;-%%'%, \ '. • . . , - c°' • 1/11 .114.-----‘. ',',,,,,,,;•,:,,, \ • . • . \ . , ,-. • -. •• 1 - •,,,,,,f•ggg:E.f:,.::::••••••.,..M.V.R .. 1\ \\ '';',',:,:',!:,', " • \ " . , • ' 10\ . .\ .: :•4,APsePplitvAELD_FoR '."• •.•!.• . " .\ ... ! ! ! •:...-..,]•?....!•;•:,.g.:•:::Kg§::::::::-:••••:.••••••- • • • \ 1. \\•...,.\\ .,,,,,,,,,,, ,,,, \ . .• . co 1 .- 1 7.60)Ft001415 , • 0 PROP06ED(N)PARKING •'• : \\.\A i4/./,' ' -; • \ .. • • .' ENCROCiiMENT ..:.. ...-. \ _,-'. ...Z.:,,,, '', \ . . ." • A . - ' . .. , ... ..., .. ....... .... \,.,, \\ ............... \ CA • 1 . ...• ' . .......;..... '.....---% ' .•• \\-#S • '.."....... . . . , ., -• . • . • ... . . ------- FOOTPRINT OF PROPOSED• - ,- NO \ . - . , :-.-• • .. -. •-,... ' .1 .• .- _eel.EAS _____.- RESIDENCE , : '.• , , . . , t • % .- •. -. . .. ., .• -- -------- • STI2........_-- .\\\ • . 0 EXISTING DRIVEWAY' ...'"...... . .\ . . , _,..:... ___ •-. . . \' \ •:- • AND WALKWAY 1 • N . • ---- • - . . .. • 1 ' VV' . -------- •""• ........'..." " " . \\ \ . • . \ l..------ • •, . ' '• . • • \ •' . , . . . .. . . . . • • . -. \ \ . . . . • • .. . . . _- . • . \ ••• • . . • .. .\\ \ - • . __N.. • . • . ., . • . • .. .. . . .. • .. . . • • • . .. ...---• -- -- \\ _ \ . -----:.-- . ‘ • --- --. .,. • . • - • " • • - eman -'"--- . • csT exs -- 7 ......._--- • \\ \ • • ----‘-- . • \ . " • f SIR- ............'. . , . V -) ........... .....-.......-...................-..'.... . . ." • ........, _.----- 1 " • • ',.. , . N • .: ' . . • • • . • ---.- ----. LINE • • ..TRUCTUR, _2 • ' .. . , • , 1 ' ' - ROPERTY - -, EXISTING sES 8,IMPROVEMENTS IN RIPARIAN CORRIDOR \ ‘ --------.-- . .....0 EXISTING RESIDENCE -= 552.00 SQ. . ...----- . . .0 EXISTING DETACHED GARAGE •• = 186.00 SQ.FT. _-...- . . • . V • . _ - -..--- • ' , • ' 0 EXISTING DRIVEWAY . ... = 454.00 SQ.FT. ' . - '. . • . •••.' TOTAL .• "=1,192.00 SQ.FT. . • • . . • . . . • • • . .• • • . ' • . . , • • . . . • • . , • • . • ' ' . . . . .. . • , . ' . . • .. . . .. • ' .. 0 PROPOSED STRUCTURE•-. .•= 104.34 SQ.FT. • • . . ' . • ' , . . . • ' . . .. , 0 PROPOSED PORCH&PARKING * = 185.18 SQ.FT. . • . • - • • . , . • , ... • • • • •• ' • • . : • • -TOTAL • •. : '•= 289.52 SQ.FT. . . ...V . .. . . . • - .' . . "•••• REDUCTION IN IMPACT' • =75.72% -• ' - , • RIPARIAN CORRIDOR STUDY-EXHIBIT-E . , , . . . . • .. . ... . . • . . - • . • , . . . . ,• . . . • . . . ... .., . .. . . • - • - • • ' • . . . ..- • . - . . . , . • - ' \\ • .. PROPERTY LINE�-- .-- -=R�- -..p\;`, _ • . .: --.- ---- . ... 70P •OF `s • r `.\ '.``�`‘ BANK . .\ .` . , . • ' .TOP OF `�s� `��� \ •.♦\ . . o " BANK `\ \ \\'. • u • PROPERTY LINE .,�1 \`(�`` P�yOQ g ; `` \ `�� • • " ; - •. 11 .\\� " _, \\.......:::::,,,\•.\\.15°..':99:?: �` • . PPO \ \ :19' . r� i.i • ^ - \:.�`- .\ - \\ ms • s. \ _ .. �. '.:.-\‘,. . \-ki\I:::::::........::' APPR OR,. GFIEL SF "� -1-- ........... -o \ \\`` \ • - rnl ROOF -� - -\ _; LINE OF Cl)m - - . , _- • • \\• \ • C�^` 1 �� ... EAVE O - \�Q-X�� y0% • .i _---__- , ' STREE(FASEM=_- •! FOOTPRINT OF PROPOSED .\\-\ ' . \ `--\ . , _ :. ..-! !-- RESIDENCE• __-----.- . .\\ \ - . !. i -f- -:: -- -- \ \ -_� - of ROPD \\ \ -SN STREglEAS�T- --l-'� ------ -.---1.---1..:"-0-"""--; \\\\ \\\ � - _ - PROPERn I • .� i --�� -- - PROPOSED STRUCTURE EAVES REQUIRED - _ SETBACK SETBACK .. __ _ .� - - _.,,..7-7-'''• FRONT 89'-0" 88'-0" 40'-0" • . SIDE 15'-0" 14'0" 30'-0 ' . ---217.17.. CREEK 20'-0" 14'-0" 25-0" ' • . • - _.. STREET 15'-0" 14'-0° 30'-0° • • . • ' • SIDE .- , PROPOSED&REQUIRED SETBACKS-EXHIBIT-F ` ALLOWABLE BUILDING \ • " - FOOTPRINT' --•� • (SHOWN HATCHED) -^--•_-•--• •-- • Q EXISTING DETACHED N LINE -- -' \` GARAGE • • PROPOSED SINGLE -•__PROPER•_�_-._-•--• `.� • BANKTOP ' . • - CAR GARAGE ___ -• -- .\`4l�O`` _BANK .. �`. .•• ' .. .. TOP OF - `�. ' .::\` \ `N` :. � W` BANK .` �` t` • . J A • a �L---, • ` \� \\\ ,�Ppp$Q • 1510 ^•1 `r:. \ \ \ ` 'J- PROPERIY�IN ___._:�-. • O �` `. \ • <4)�. • . EXISTING, \ �� \ �� II------------------------------------------ - -\ t .' •• • .\' ;• ,\ 25 R• . F \ �.� s. \`` • ,,�AA - ,\1 \\ 25 a\PpPOS .` \\\ `` A • •13 A . .A . .gPPROVEO`D FOR-•••. A� \ \`� \ \ •90\ SEpTICFIE S ,. .. CO PROPOSED ADDITION m`\ .. 7-BEDROOM .. WITH SECOND FLOOR • b ' \ • _ ` : \ \ • . _ • (SHOWN SHADED) _ �``•f�; __!,� .� - -__ —_ _ STREET pSEMENT ` \\ . '. ..------- --- --\- ' \ , . . . - - . • • Genf solo • __,-- , • _ ` • ' gEMFNT _ \\\\\ • '` • STREP .,;, ` • ' .• 1; �- _� —• --_ eons OF ROP.O_.--.-_.-_ REMODEL:. .: :.. • _ - _- --PROPERTY6INE O EXISTING RESIDENCE . _ 982.00SQ.FT. `.ti ' f - _ _-. _ • ..OB EXISTING DETACHED GARAGE .• = 186.00 SQ.FT. - - `�- -- -- - - - . •.TOTAL EXISTING BLDG.FOOTPRINT =1168.00 SQ.FT. -I • _. O ADDRION TO RESIDENCE .. • ' (N)SINGLE CAR GARAGE - 242.00 SQ.FT. • .. . . MAIN FLOOR ADDITION =772.00 SQ.FT. ' . • . ' . . .SECOND FLOORADDITION I =1512.50 SQ.FT - - .. .. • - TOTAL ADDITION _ =2526.50 SQ.FT. • . TOTAL FLOOR AREA OF STRUCTURES=3694• .50 SQ.FT. •• 'REMODEL EXISTING STRUCTURE-EXHIBIT-G • M F•q.ALLOWABLE �. =5660. 66 SQ.FT ATTACHMENT 6 TOWN OF LOS ALTOS f-IlLL 4�� 0 PLANNING DEPARTMENT 20/5 26379 Fremont Road•Los Altos Hills,California 94022 (650)941-7222'•F r4`��941-3160 WORKSHEET#2 �'�!l® EXISTING AND PROPOSED DEVELOPMENT AREA AND FLOOR AREA �.I!`s •TURN IN WITH YOUR APPLICATION• PROPERTY OWNER'S NAME \/11)Y A A N!C) S RI KI 1^✓AS 1-I,4 PROPERTY ADDRESS 2 ter'9 1 DY' ;gip. L A LTC? , Citi ' 71.'1•02.2 CALCULATED BY (DATE 1 DEVELOPMENT AREA Existing Proposed DA Credit Total A. House and Garage(from part 2.A) I167.Utz (T)2215.71 3453.G.3 B. Decking 26,1.SG (-)2G1,5 , C. Driveway and Parking - I led, m 1141. 00 D. Patios and Walkways 520.2 S (4-) 7 23,7S E. Tennis Court F. Pool and Pool Decking -G. Accessory Building(from part 2.B) H. Solar Panels(ground mounted) -I. Any Other Coverage ( .961 t <,4.51 Total 2D1. r.3�; S I$3,72 Roof Mounted Solar Bonus (LAHMC Section 10-1.502) Yes No SF Maximum Development Area-MDA (from worksheet#1) 75Od. Oo Maximum Development Area w/Solar Credit 2 FLOOR AREA Existing Proposed Total A. HOUSE AND GARAGE a.First Floor u 1, 2 (-)3(X,.611 '288.2)3 b. Second Floor - (+) 14113.13 1 e). J 3 c.Attic - - - d.Basement - - e. Garage 18 e.00 (-t)211'.$ 430. Bo f.Area over 17' (t) 85.g7 05,67 B. ACCESSORY BUILDINGS a.First Floor b. Second Floor c.Attic d.Basement Total I 1(0 7 "4g.343 Maximum Floor Area-MFA (from worksheet#1) vcoo.GYM TOWN USE ONLY CHECKED BY DATE