TOWN OF LOS ALTOS HILLS December 3, 2015
Staff Report to the Planning Commission
SUBJECT: SITE DEVELOPMENT PERMIT FOR A NEW TWO STORY RESIDENCE
WITH A BASEMENT AND A SWIMMING POOL; LANDS OF PICHAI; 25857
WESTWIND WAY; FILE#-338-ZP-SD-GD
FROM: Suzanne Avila, Planning Director SA
RECOMMENDATION: That the Planning Commission:
Approve the requested Site Development Permit, subject to the recommended conditions of
approval in Attachment 1.
BACKGROUND .
The subject property is a 3:17 acre parcel located on the southwest corner of Westwind Way and
La Paloma Road. The property was.created as part of a 7-lot subdivision approved by the Town
in 1980(Tract 6928,recorded April 1;981). .Two of the lots were later combined to form one larger
lot(Parcel Map 544, recorded March 1985). Vehicular access from Westwind Way is prohibited
by the recorded maps. The property is currently developed with a residence,hardscape and pool.
Access is from a shared driveway off Westwind Way that serves four lots. Surrounding properties
are all developed with single family homes.
There is an existing pathway along the Westwind Way and La Paloma Road frontages. A portion
of the path is -located outside of the recorded pathway easement. The easement will be
reconfigured so it includes the entire pathway. Other easements on the property include an ingress-
egress easement that includes a portion of the shared driveway, and a public utility easement along
La Paloma Road.
The project complies with Fast Track criteria, however, all of the proposed floor area is within a
single building that will collectively be larger than 10,000 square feet, therefore the project is
governed by the Estate Home Ordinance (total proposed floor area is 10,557 square feet). Estate
Homes are required to be reviewed by the Planning Commission.
CODE REQUIREMENTS
Pursuant to Section 10-1.508 (Estate Homes Ordinance) of the Municipal Code, this application
for a new residence has been forwarded to the Planning Commission for review. The Zoning and
Site Development Ordinances are used to evaluate proposed projects including floor and
development area limitations, grading, drainage, height, setbacks, visibility and parking
requirements.
Staff Report to the Planning Commission
Lands of Pichai
December 3,2015 •
Page 2 of 12
DISCUSSION
Site Data:
Gross Lot Area: 3.17 acres
Net Lot Area: 3.12 acres
Average Slope: 26.12%
Lot Unit Factor: 2.058
Floor Area and Development Area (square feet):
Area Maximum Existing Proposed Increase Remaining
Development 18,929* 13,752 18,528 4,776 401
Floor 10,689 5,114 10,557** 5,443 132
*includes 500 square foot bonus for roof mounted solar
**3,651 sq.ft. basement exempt from MFA
Site and Architecture
The applicant is requesting approval of a Site Development Permit to construct a 9,716 square foot
two story residence with 3,651 square foot basement and an attached 840 square foot three-car
garage. The total proposed floor area is 10,557 square feet exclusive of the basement which is
exempt since it is entirely below ground. The new residence has been sited in the same location
as the existing house.
The main floor of the residence has 6,473 square feet of living space consisting of a laundry room,
guest bedroom, offices, 2%2 baths, kitchen, family room, dining room,living room and gym. This
level also includes the 841 square foot garage.
The main level has 3,244 square feet of living space with a master bedroom and bath, two
additional bedrooms,two baths and a family room.
The basement is 3,651 square feet and includes a mechanical room, storage, wine cellar, laundry
room and nanny's quarters.
As required by the Estate Home Ordinance, the minimum setbacks are 44 feet from the front
property line and 33 feet from the sides and rear property lines. The applicant has further increased
three of the setbacks as follows:
Front - 62 feet
Rear 100 feet
West Side 33 feet
East Side 179 feet
The maximum building height on a vertical plane is 24 feet 6 inches and the maximum overall
height of the building from the lowest point to the highest point is 31 feet. Proposed exterior
materials consist of cement plaster and wood siding with limestone and wood trim. Building
elevations are shown on sheets SD 9 and SD 10 of the development plans, Attachment 5. The
Staff Report to the Planning Commission
Lands of Pichai
December 3,2015
Page 3 of 12
contemporary design presents a low profile, and the variety of exterior materials including cement
plaster,wood,limestone and glass will provide interest and help break up the massing of the home.
Story poles have been installed to aid the Commission in reviewing the proposed project.
Green Building Ordinance
The project is required to comply with the Green Building Ordinance. The new residence is
designed to achieve 131 points under Build it Green's GreenPoint Rated program where a
minimum of 50 points is required for certification. Condition#15 requires the applicant to submit
documentation verifying that the new residence has been constructed to meet green building
certification standards prior to final inspection.
Driveway&Parking
The existing driveway will be removed and a new driveway will be constructed off the shared
driveway, closer to Westwind Way. Nonconforming parking spaces off the private driveway will
be removed.
Pursuant to Section 10-1.601 of the Zoning Ordinance, a total of four on-site parking spaces are
required. The applicant is proposing a three car garage that is part of the main level of the house
(see sheet SD4 of the development plans) and three uncovered spaces for a total of six parking
spaces.
Trees &Landscaping
An arborist report was submitted that provides information on the size,health and condition of 63
trees on the property(see Attachment 3). The applicant is proposing to remove the redwoods and
orchard trees as well as three olives and two mayten trees. There are 10 oaks on the site that will
be retained (five are heritage oaks). A conceptual landscape plan has been provided (see sheet
L1.0 of the development plans).
A landscape plan will be required after the new residence has been framed. Any landscaping
required for screening or erosion control will be required to be installed,and a maintenance deposit
to ensure viability of plantings will be collected, prior to final inspection and issuance of an
occupancy permit for the new residence. As required by the Estate Home Ordinance,the landscape
screening plan will be forwarded to the Planning Commission for review (see condition#2).
Outdoor Lighting
The applicant is proposing shielded and down directed lights on the exterior of the residence (see
sheet SD13 of the development plans for proposed locations and lighting details). Condition#10
requires outdoor lighting fixtures to be in compliance with the Town's Outdoor Lighting Policy.
Staff Report to the Planning Commission
Lands of Pichai
December 3,2015
Page 4 of 12
Drainage
The drainage system for the new development includes storm drain piping and area drains around
the residence, with an earthen swale along the front of the residence. Pursuant to Section 10-
2.503 of the Municipal Code (Drainage Facilities Standards), the Engineering Department has
reviewed and determined that the proposed drainage design complies with Town requirements.
The Engineering Depainiient will review and approve the final drainage plan prior to acceptance
of plans for building plan check. Final "as-built" grading and drainage will be inspected by the
Engineering Department and any deficiencies will be required to be corrected prior to final
inspection.
Grading
Proposed grading incudes 2,350 cubic yards of cut and 800 cubic yards of fill,with export of 1,550
cubic yards. Most of the earthwork is excavation for the basement. Cut and fill depths are in
compliance with the Town's Grading Policy.
Fire Department Review
The Santa Clara County Fire Department has reviewed the plans and is requiring a sprinkler system
throughout all portions of the new residence and garage. The property is located within the
Wildland Urban Interface Fire Area and will be required to comply with the provisions of Chapter
7A of the California Building Code. Fire Department requirements are included in the conditions
of approval in Attachment 1.
Geotechnical Review
The Town's Geotechnical Consultant, Cotton, Shires & Associates, reviewed the plans and
geotechnical report and determined that the project geotechnical consultant's recommendations
are in conformance with prevailing professional standards. The Town Geotechnical Consultant
recommends that one of two proposed stormwater energy dissipaters be relocated to reduce
potential erosion and slope instability. The project consultant will review the construction and
drainage plans to ensure that their recommendations have been incorporated. The project
consultant is also required to submit a final letter verifying that they have done any necessary site
observation and inspections, and that the as-built conditions are consistent with their
recommendations (see condition#17).
Committee Review
The Environmental Design and Protection Committee commented that no irrigation should be
placed within five feet of the pathway, and that the 48-inch oak located near the house should be
protected. The applicant intends to retain the large oak.
The Pathways Committee recommended that the existing pathway be restored at the end of
construction, and that water bars be installed along Westwind to prevent erosion. In addition,the
Committee asked that the pathway easement be modified to align with the existing pathway.
Staff Report to the Planning Commission
Lands of Pichai
December 3,2015
Page 5 of 12
Condition #28 requires dedication of a new pathway easement. Condition #29 requires the
pathway to be restored at the end of construction,prior to occupancy of the new residence.
Neighbor Comments
The applicant and project architect met with surrounding neighbors and shared the plans for the
new residence. One neighbor that did not meet with the owners or architect contacted staff and
expressed concern that the proposed residence will affect a portion of their view. Four neighbors
have submitted letters of support for the proposed project(see Attachment 4).
CEQA STATUS
The project is categorically exempt from CEQA pursuant to Sections 15303(a) which allows for
the construction of one single-family residence and Section 15303(e) which allows for accessory
structures inclusive of swimming pools.
ATTACHMENTS
1. Recommended Conditions of Approval
2. Worksheet#2 (one page)
3. Arborist report(nine pages),received October 29, 2015
4. Letters of support(four pages total),dated August 23,August 21, September 12 and September
28, 2015
5. Development plans (35 sheets),received October 29, 2015
Staff Report to the Planning Commission ATTACHMENT 1
Lands of Pichai
December 3,2015
Page 6of12
ATTACHMENT 1
RECOMMENDED CONDITIONS FOR SITE DEVELOPMENT PERMIT
FOR A NEW RESIDENCE AND SWIMMING POOL
LANDS OF PICHAI, 25857 WESTWIND WAY
File#338-15-ZP-SD-GD
PLANNING DEPARTMENT:
1. No other modifications to the approved plans are allowed except as otherwise first reviewed.
and approved by the Planning Director or the Planning Commission,depending on the scope
of the changes.
2. After completion of rough framing or at least six (6) months prior to scheduling a final.
inspection,the applicant shall submit landscape screening and erosion control plans for review.
by the Planning Commission. The application for landscape screening and erosion control
shall be accompanied by the applicable fee and deposit. The plans shall be reviewed at a
noticed public hearing. Attention shall be given to plantings which will be adequate to break
up the view of the new residence from surrounding properties and streets. All landscaping.
required for screening purposes and for erosion control (as determined by the City Engineer)
must be installed prior to final inspection of the new residence. The landscape screening plan
shall comply with Section 10-2.809 (water efficient landscaping) of.the Los Altos Hills
Municipal Code.
3. A landscape maintenance deposit in the amount of $5,000 shall be posted prior to final
inspection. An inspection of the landscape to ensure adequate establishment and
maintenance shall be made two years after the installation. The deposit will be released at
that time if the plantings remain viable.
4. Prior to beginning any grading operation, all significant trees that may be impacted by . .
construction or construction staging, are to be fenced at the drip line. The fencing shall be
of a material and structure (chain-link) to clearly delineate the drip line. Town staff must
inspect the fencing and the trees to be fenced prior to commencement of grading. The
property owner shall call for said inspection at least three days in advance of the inspection.
The fencing must remain throughout the course of construction. No storage of equipment,
vehicles or debris shall be allowed within the drip lines of these trees. Existing perimeter
plantings shall be fenced and retained throughout the entire construction period.
6. Exterior finish colors of all buildings shall have'a light reflectivity value of 50 or less and roof
materials shall have a light reflectivity value of 40 or less,per manufacturer specifications. All
color samples shall be submitted to the Planning Department for approval prior to acceptance
of plans for building plan.check. All applicable structures shall be painted in conformance
with the approved color(s)prior to final inspection.
Staff Report to the Planning Commission
Lands of Pichai
December 3,2015
Page 7 of 12
7. Prior to requesting the foundation inspection, a registered civil engineer or licensed land
surveyor shall certify in writing and state that"the location of the new residence, roof eaves
and cabana are no less than 68'from the front property line and 51'from the side and rear
property lines." The elevation of the new residence shall be similarly certified in writing to
state that"the elevation of the new residence and cabana matches the elevation and location
shown on the Site Development plan." The applicant shall submit the stamped and signed
letter(s) to the Planning Depaitment prior to requesting a foundation inspection and prior to
final inspection.
8. Prior to requesting the final framing inspection, a registered civil engineer or licensed land
surveyor shall certify in writing and state that "the height of the new residence and cabana
complies with the 32' maximum structure height, measured as the vertical distance at any
point from the bottom of the crawl space or basement ceiling if excavated below natural
grade, to the highest part of the structure directly above (including roof materials)." The
overall structure height shall be similarly certified in writing and state that"all points of the
building(including chimneys and appurtenances)lie within a thirty-five(35)foot horizontal
band based, measured from the lowest visible natural or finished grade topographical
elevation of the structure along the building line and the highest topographical elevation of
the roof of the structure." The applicant shall submit the stamped and signed letter(s)to the
Planning Department prior to requesting a final framing inspection and prior to final
inspection.
9. No new fencing is approved. Any new fencing or gates shall require review and approval by
the Planning Department prior to installation. Fences shall not encroach within any
easements on the property.
10. Outdoor lighting is approved as shown. Light fixtures shall be down directed or shielded.
No lighting may be placed within setbacks except two entry or driveway lights. Any
additional outdoor lighting shall be approved by the Planning Department prior to
installation.
11. Skylights, if utilized, shall be designed and constructed to reduce emitted light (tinted or
colored glass, or other material).No lighting may be placed within skylight wells.
12. Fire retardant roofing(Class A) is required for all new construction.
13. All properties shall pay School District fees to either the Los Altos School District or the
Palo Alto Unified School District, as applicable,prior to acceptance of plans for building
plan check. The applicant must take a copy of worksheet#2 to school district offices (both
elementary and high school in the Los Altos School District), pay the appropriate fees and
provide the Town with a copy of the receipts.
Staff Report to the Planning Commission
Lands of Pichai
December 3,2015
Page 8 of 12
14. At time of submittal of plans for building plan check, the applicant shall submit one of the
following checklists to demonstrate compliance with the Town's Green Building Ordinance:
a. A GreenPoint Rated checklist with the building permit application to indicate that the
project will achieve a minimum of fifty (50) points. The checklist shall be completed
by a qualified green building professional and shall be attached to the front of the
construction plans. The construction plans shall include general notes or individual
detail drawings,where feasible,showing the green building measure to be used to attain
the required points.
b. A LEED for Homes checklist with the building permit application to indicate that the
project will achieve a minimum of forty-five (45) points or LEED certification. The
checklist shall be completed by a qualified green building professional and shall be
attached to the front of the construction plans. The construction plans shall include
general notes or individual detail drawings,where feasible,showing the green building
measure to be used to attain the required points.
15. Prior to final inspection and occupancy, a qualified green building professional shall provide
documentation verifying that the building was constructed in compliance with GreenPoint
Rated or LEED®certification.
16. Standard swimming pool conditions:
a. Lights shall be designed so that the source is not visible from off-site.
b. Drainage outfall structures shall be constructed and located to the satisfaction of the
City Engineer.
c. Equipment shall be enclosed on all four sides with a roof for noise mitigation and
screening.
17. For swimming pools, at least one of the following safety features shall be installed to the
satisfaction of the Town Building Official:
a. The pool shall be isolated from access to the residence by an enclosure(fencing).
b. The pool shall be equipped with an approved safety pool cover.
c. The residence shall be equipped with exit alarms on those doors providing direct access
to the pool.
d. All doors providing direct access from the home to the swimming pool shall be
equipped with a self-closing, self-latching device with a release mechanism placed no
lower than 54 inches above the floor.
Staff Report to the Planning Commission
Lands of Pichai
December 3,2015
Page 9 of 12
ENGINEERING DEPARTMENT:
18. As recommended by Cotton, Shires &Associates, Inc., the applicant shall comply with the
following:
a. Geotechnical Plan Review — The project geotechnical consultant shall review and
approve all geotechnical aspects of the project building and grading plans (i.e., site
preparation and grading, site drainage improvements and design parameters for
foundations) to ensure that their recommendations have been properly incorporated.
The consultant shall also evaluate the location and design of the proposed storm
drainage discharge structures.
The results of the plan review should be summarized by the geotechnical consultant in
a letter and submitted to the Town Engineer for review prior to acceptance of plans
for building plan check
b. Geotechnical Field Inspection—The project geotechnical consultant shall inspect, test
(as needed), and approve all geotechnical aspects of the project construction. The
inspections should include, but not necessarily be limited to: site preparation and
grading, site surface and subsurface drainage improvements, and excavations for
foundations and retaining walls and pool prior to the placement of steel and concrete.
The results of these inspections and the as-built conditions of the project shall be
described by the project geotechnical consultant in a letter and submitted to the Town
Engineer for review prior to final inspection.
For additional details, please see the September 15, 2015 report form Cotton Shires &
Associates.
19. Peak discharge at 25857 Westwind Way, as a result of Site Development Permit 338-15,
shall not exceed the existing pre-development peak discharge value of the property.
Detention storage must be incorporated into the project to reduce the predicted peak
discharge to the pre-development value. Provide the data and peak discharge hydrologic
model(s) utilized, as well as, the calculations of the peak discharge value prior and post
development. Determine the design peak runoff rate for a 10-year storm and provide
detention storage design plans to reduce the predicted peak discharge to the pre-development
value. All documentation, calculations, and detention storage design(2 plan copies) shall be
submitted for review and approval to the satisfaction of the City Engineerprior to acceptance
of plans for building plan check.
20. The Engineer of Record shall observe the installation of the drainage system, construction of
the energy dissipaters,and completion of the grading activities and state that items have been
installed and constructed per the approved plans. A stamped and signed letter shall be
prepared and submitted to the Town prior to final inspection.
Staff Report to the Planning Commission
Lands of Pichai
December 3,2015
Page 10 of 12
21. All hydrant use is strictly prohibited by the Purissima Hills Water District. A permit for
obtaining water for grading and construction purposes must be obtained from the Purissima
Hills Water District, and submitted for approval to the Town Engineering Department prior
to acceptance of plans for building check. The permit will authorize the use of water from
specific on-site or off-site water sources.
22. Any, and all, changes to the approved grading and drainage plan shall be submitted as
revisions from the project engineer and shall first be approved by the Town Engineering
Department. No grading shall take place during the grading moratorium(October 15 to April
15) except with prior approval from the City Engineer. No grading shall take place within
ten feet of any property line except to allow for the construction of the driveway access.
23. All public utility services serving this property shall be placed underground. The applicant
should contact PG&E immediately after issuance of building permit to start the application
process for undergrounding utilities which can take up to 6-8 months.
24. Two copies of an Erosion and Sediment Control plan shall be submitted for review and
approval by the Engineering Department prior to acceptance of plans for building plan
check. The contractor and the property owner shall comply with all appropriate requirements
of the Town's NPDES permit relative to grading and erosion/sediment control. The first 100
feet of the driveway shall be rocked during construction and all cut and fill slopes shall be
protected from erosion. All areas on the site that have the native soil disturbed shall be
protected for erosion control during the rainy season and shall be replanted prior to final
inspection.
25. Two copies of a Grading and Construction Operation plan shall be submitted by the property
owner for review and approval by the City Engineer and Planning Director prior to
acceptance of plans for building plan check. The grading/construction operation plan shall
address truck traffic issues regarding dust, noise, and vehicular and pedestrian traffic safety
on Westwind Way and surrounding roadways, storage of construction materials, placement
of sanitary facilities, parking for construction vehicles, clean-up area, and parking for
construction personnel. A debris box (trash dumpster) shall be placed on site for collection
of construction debris. Arrangements must be made with the GreenWaste Recovery, Inc. for
the debris box, since they have a franchise with the Town and no other hauler is allowed
within the Town limits.
26. The property owner shall inform the Town of any damage and shall repair any damage caused
by the construction of the project to pathways, private driveways, and public and private
roadways,prior to final inspection and release of occupancy permits and shall provide the
Town with photographs of the existing conditions of the roadways and pathways prior to
acceptance of plans for building plan check.
Staff Report to the Planning Commission
Lands of Pichai
December 3,2015
Page 11 of 12
27. A sewer plan for the sanitary sewer main relocation shall be required to be approved by the
City Engineer prior to acceptance of plans for building plan check. An as-built mylar shall
be required to be submitted to the Town prior to project approval and final inspection. An
encroachment permit shall be required by the Town's Public Works Depai tment for all work
within the sanitary sewer easement prior to start of work.
28. The property owner shall dedicate additional Pathway Easement to the Town adjacent to La
Paloma Road at least 2 feet beyond the inside edge of existing pathway. The property owner
shall provide legal description and plat exhibits that are prepared by a registered civil
engineer or a licensed land surveyor and the Town shall prepare the dedication document.
The dedication document, including the approved exhibits, shall be signed and notarized by
the property owner and returned to the Town prior to acceptance of plans for building plan
check.
29. The property owner shall restore the existing pathway along Westwind Way and La Paloma
Road to Type 2B standards and shall add water bars as needed along Westwind Way to the
satisfaction of the Engineering Department prior to final inspection. An encroachment
permit is required for all work within the public right-of-way.
30. The driveway shall be required to be fully constructed and to be roughened where the
pathway intersects, to the satisfaction of the City Engineer,prior to final inspection. An
encroachment permit shall be required by the Town's Public Works Department for all work
proposed within the public right of way prior to start of work.
31. The property owner shall be required to connect to the public sanitary sewer prior to final
inspection. A sewer hookup permit shall be required by the Town's Public Works
Department prior to acceptance of plans for building plan check. An encroachment permit
shall be required for all work within the public sanitary sewer easement prior to start of work.
FIRE DEPARTMENT:
32. An automatic residential fire sprinkler system approved by the Santa Clara County Fire
Department shall be included in all portions of the dwelling. Covered porches,patios,balconies,
and attic space may require sprinkler coverage. A Fire Department Connection(FDC) shall be
provided. The FDC shall consist of at least one 2.5"hose connection that is connected to the
sprinkler riser with a pipe not less than the diameter of the sprinkler riser. A State of California
licensed (C-16) Fire Protection Contractor shall submit plans, calculations, a completed permit
application and appropriate fees to the Fire Department for review and approval prior to
beginning their work. The fire sprinkler system installation shall be inspected and approved by
the Fire Department,prior to final inspection and occupancy of the new residence.
33. The project is located within the designated Wildland Urban Interface Fire Area. Building
construction shall comply with the provisions of California Building Code (CBC) Chapter
7A. Vegetation clearance shall be in compliance with CBC Section 701A.3.2.4 prior to final
inspection.
Staff Report to the Planning Commission
Lands of Pichai
December 3,2015
Page 12 of 12
34. Potable water supplies shall be protected from contamination cause by fire protection water
supplies. It is the responsibility of the applicant and any contractors to contact the water
purveyor supplying the site of such project, and to comply with the requirements of that
purveyor. Such requirements shall be incorporated into the design of any water based fire
protection systems, and/or fire suppression water supply systems or storage.
35. All construction shall comply with applicable provisions of the CFC Chapter 33 and Standard
Detail and Specifications SI-7.
36. Approved numbers or addresses shall be placed on all new and existing buildings in such a
position that it is plainly visible and legible from the street or road fronting the property.
Numbers shall contrast with their background.
CONDITION NUMBERS 6,13,18a,19,21,24,25,26,27,28 and 31 SHALL BE COMPLETED
AND SIGNED OFF BY THE PLANNING DEPARTMENT AND THE ENGINEERING
DEPARTMENT PRIOR TO ACCEPTANCE OF CONSTRUCTION PLANS FOR PLAN
CHECK BY THE BUILDING DEPARTMENT.
Project approval may be appealed if done so in writing within 22 days of the date of this notice.
The building permit cannot be issued until the appeal period has lapsed. The applicant may submit
construction plans to the Building Department after December 25,2015 provided the applicant has
completed all conditions of approval required prior to acceptance of plans for building plan check.
Upon completion of the construction, a final inspection shall be required to be set with the
Planning and Engineering Departments two weeks prior to final building inspection approval.
NOTE:The Site Development permit is valid for one year from the approval date(until December
3, 2016). All required building permits must be obtained within that year and work on items not
requiring a building permit shall be commenced within one year and completed within two years.
•
ATTACHMENT 2
RECEIVED
TOWN OF LOS ALTOS HILLS SEP 2015
PLANNING DEPARTMENT
26379 Fremont Road•Los Altos Hills,California 94022•(650)941-7222•FAX(650)941-3160 •
WORKSHEET #2 TA9a OF LAS ALTOS HILLS
EXISTING AND PROPOSED DEVELOPMENT AREA AND FLOOR
•TURN IN WITH YOUR APPLICATION°
PROPERTY OWNER'S NAME ptt4SALI AND. 51.ANDAR PIGHAI - latA I PAv1 ILy -mac,T
PROPERTY:ADDRESS 2.5057. V1IE5TWINI) WAY
CALCULATED BY g.west C L+6) P.wo►J(n- o LIv�Ros CS NIA.) DATE O' /0/(5
1. DEVELOPMENT AREA Existing Proposed DA Credit Total
A. House and Garage(from part 2.A) 5114* 10,557 10,657
B. Decking _ 0 752- 752.
C. Driveway and Parking •//7't2. 2,651 2,6510 507, //324
D. Patios and Walkways 4,03 7 4,2-0 zi, 26`1
E. Tennis Court d' U:. f t °U U
F. Pool and Pool Decking 7( 7 1, 131 _ 1 �13
G. Accessory Building(from part 2.B)
H. Solar Panels (ground mounted) • • ' '
I. Any Other Coverage 52 1-1-613 `113
" Total' ` ' 3p q2 , 1 ,853 /x,528'
Roof Mounted Solar Bonus
(LAHMC Section 10-1.502) yes X No_ SF 5-00
Maximum Development Area-MDA(from worksheet#1) / /412-q
Maximum Development Area w/Solar Credit /014/Z9'
2. FLOOR AREA Existing. Proposed Total
A. HOUSE AND:GARAGE
a. First Floor . 3,y7'1 (,y72 6,'-t73
b. Second Floor �, 1/ f 34,2yt1
.c. Attic
d. Basement 3,�5 I ' ( ?,65- 1 )
e. Garage q70 gy I Sq
f. Area over 17 .
B. ACCESSORY BUILDINGS
a. First Floor S1O
b. Second Floor .
c. Attic
d. Basement
Total 67,1 I y ` 10 557 1015.57
Maximum Floor Area-MFA(from worksheet#1) 10,6gq
TOWN USE ONLY CHECKED BY SA . DATE t (2.-0(5
p514NA1 E s FtooR NA514 T4K&If rn o/1 2EcoR0 A-CC6SSoIS /,NroA 1.477 J
47z6 • r BE /Z}io&'ert
ATTACHMENT 3
Kielty Arborist Services LLC
Certified Arborist WE#0476A .
P.O.Box 6187 :.
San Mateo,CA 94403 IECEW®
650-.51.5=9783
OCT29
August 4,2015 2015 ..
Sundar And Anjali Pichai • ®F(QSq(r
TOWN
14155 Donelson Place- : . °SHILLS
Los Altos Hills, CA 94022 .
Site:25857 Westwind Way, Los Altos Hills, CA
Dear Mr.And Mrs. Pichai,
As requested_on Tuesday,-July 14, 2015;.I visited the above site to inspect and comment on the
trees. A new home and landscape is being designed,,for this site and your concern as to the future
healthand safety of the trees has.prompted.this visit. ..
Method:
The significant trees on this site were located on.a reap provided by you. Each tree was given an
identification number. This number was inscribed on a metal foil tag and nailed to the trees at
eye level. The trees were then measured for diameter at 54 inches above ground level (DBH or
diameter at breast;height). Each tree was assigned a condition rating from 1 to 100 for form and
vitalitysm t
.u:�...g, hey o owing sca e;
1 29 Very Poor
y:30 ;49 ,Poor
50 - 69 Fair
70 - 89 Good
90 - 100 Excellent
•
The.height of each tree was,estimated and_the spread,was.paced off Lastly,a comments section
;provided ;. , . . ,
•
25857 Westwind Way/8/4/15 (2)
Survey:
Tree# Species DBH CON HT/SP Comments
1 Plum 8.0 45 15/15 Poor vigor,poor form, multi leader at 3 feet,
(Prunus cerasifera) in decline, over mature, remove.
2 Coast live oak 10.2 55 25/20 Fair vigor, fair form, old wound on trunk
(Quercus agrifolia) @base, bleeding canker at 3 feet,
codominant at 5 feet,with included bark.
3 . Plum 9.1 45 20/15 Poor vigor,poor form, multi leader at 2 feet,
(Prunus cerasifera) in decline,tip die back, over mature,
remove.
4 Plum 8.2 45 20/15 Poor vigor,poor form, multi leader at 2 feet,
(Prunus cefasifera) in decline,tip die back, over mature,
remove.
5 _ Plum 9.9 45 20/15 Poor vigor,poor form, multi leader at 3 feet,
(Prunus cerasifera) in decline,tip die back, over mature,
remove.
6 Redwood 19.0 65 50/30 Fair vigor, fair form, 5 feet from existing
(Sequoia sempervirens) driveway, beginning stages of drought
stress.
7 Redwood 23.4 60 60/30 Fair vigor, poor-fair form, codominant at 20
(Sequoia sempervirens) feet.
8 Redwood 16.3 70 50/25 Fair vigor, fair form.
(Sequoia sempervirens)
9 Redwood 12.5 60 40/20 Fair vigor, fair form, suppressed.
(Sequoia sempervirens)
10 Redwood 13.3 ' 70 40/20 Fair vigor, fair form.
(Sequoia sempervirens)
11 Redwood 9.5 60 25/15 Fair vigor, fair form, suppressed.
(Sequoia sempervirens)
12 Redwood 12.4 70 40/20 Fair vigor, fair form.
(Sequoia sempervirens)
25857 Westwind Way/8/4/15 (3)
Survey:
Tree# Species DBH CON HT/SP Comments
13 Redwood 14.6 70 45/20 Fair vigor, fair form.
(Sequoia sempervirens)
14 Redwood 19.0 65 50/25 Fair vigor, fair form,beginning stages of
(Sequoia sempervirens) drought stress.
15 Redwood 12.3 70 40/20 Fair vigor, fair form.
(Sequoia sempervirens)
16 Redwood 19.2 70 50/25 Fair vigor, fair form.
(Sequoia sempervirens)
17 Redwood 9.5 65 30/15 Fair vigor, fair form, suppressed by#16.
(Sequoia sempervirens)
18 Redwood 10.8 60 45/20 Fair vigor, fair form, beginning stages of
(Sequoia sempervirens) drought stressed.
19 Redwood 15.5 70 55/30 Fair vigor, fair form.
(Sequoia sempervirens)
20 Redwood 9.8 45 25/20 Poor vigor, fair form, drought stressed.
(Sequoia sempervirens)
21 Coast live oak 12.2 50 25/15 Fair vigor,poor form, codominant at 4 feet
(Quercus agrifolia) with included bark, 3 feet from road, 2 feet
from path.
22 Olive 4.4-5.9 50 15/20 Fair vigor,poor form, multi leader at base.
(Olea europaea)
23 Olive 4x6 50 15/20 Fair vigor,poor form, multi leader at base.
(Olea europaea)
24 Olive 8@base 50 15/20 Fair vigor,poor form,multi leader at base.
(Olea europaea)
25 Green ash 8.0 45 35/25 Fair vigor, poor form, multi leader at 6 feet,
(Fraxinus pennsylvanica) with included bark and split crotch.
25857 Westwind Way/8/4/15 (4)
Survey:
Tree# Species DBH CON HT/SP Comments
26 Green ash 11.5 50 40/25 Poor-fair vigor, fair form,minor dieback in
(Fraxinus pennsylvanica) canopy.
27- Valley oak 10.2 50 35/25 Fair vigor,poor form, codominant at 4 feet,
(Quercus lobata) minor die back in canopy, expose root
crown.
28 Valley oak 44.6 70 55/70 Fair vigor, fair form, multiple cables
(Quercus lobata) installed,well maintained, good crotch
formations, majestic tree.
29 Coast live oak 13.4 60 25/25 Fair vigor,poor-fair form, multi leader at 7
(Quercus agrifolia) feet,poor crotches, 6 feet from path.
30 Coast live oak 13.3 60 25/25 Fair vigor, fair form, 7 feet from path.
(Quercus agrifolia)
31 Coast live oak 13.5 60 30/25 Fair vigor, fair form, codominant at 6 feet.
(Quercus agrifolia)
32 Coast lige oak 10est 60 20/15 Fair vigor, fair form.
(Quercus agrifolia)
33 Valley oak 10.0 55 25/20 Fair vigor, fair form, 15 feet from path.
(Quercus lobata)
34 Valley oak 19.5 60 50/40 Fair vigor, fair form, expose root crown.
(Quercus lobata)
35 Valley oak 8.9 50 25/20 Fair vigor,poor form, codominant with
(Quercus lobata) included bark at 3 feet.
36 Almond 11.7@base 50 15/20 Fair vigor, poor form, multi leader at 1 foot.
(Prunus dulcis)
37 Apricot 13.2@base 40 10/15 Poor vigor,poor form, multi leader at base,
(Prunus armeniaca) decay.
38 Italian stone pine 5.8-12.7 45 30/30 Fair vigor, poor form, codominant.
(Pinus pinea)
25857 Westwind Way/8/4/15 (5)
Survey:
Tree# Species DBH CON HT/SP Comments
39 Apricot 8est 40 10/15 Poor vigor,poor form, over mature, decay.
(Prunus armeniaca)
40 Apricot 8est 40 10/15 Poor.vigor,poor form, over mature, decay.
(Prunus armeniaca)
41 Apricot 8est 40 10/15 Poor vigor,poor form, over mature, decay.
(Prunus armeniaca)
42 Plum 8.9 40 15/20 Poor vigor,poor form, in decline, remove.
(Prunus cerasifera)
43 Plum 8.0 40 10/10 Poor vigor, poor form, in decline, remove.
(Prunus cerasifera)
44 Canary island pine 18.0 45 70/35 Fair vigor, fair form,poor live crown ratio.
(Pinus canariensis)
45 Canary island pine 19.2 55 70/35 Fair vigor, fair form,poor live crown ratio.
(Pinus canariensis)
46 Canary island pine 18.0 60 70/35 Fair vigor, fair form.
(Pinus canariensis)
47 Canary island pine 23.6 50 70/30 Fair vigor,poor form, codominant at 60 feet.
(Pinus canariensis)
48 - Redwood 10.0 55 30/15 Fair vigor, fair form, suppressed by#47.
(Sequoia sempervirens)
49 Redwood 11.8 65 40/20 Fair vigor, fair form.
(Sequoia sempervirens)
50- Redwood 15.4 65 40/20 Fair vigor, fair form.
(Sequoia sempervirens)
51 Redwood 14.5 65 45/20 Fair vigor, fair form.
(Sequoia sempervirens)
52 Redwood 12.7 65 45/20 Fair vigor, fair form.
(Sequoia sempervirens)
25857 Westwind Way/8/4/15 (6)
Survey:
Tree# Species DBH CON HT/SP Comments
53 Valley oak 8.9 65 45/20 Fair vigor, fair form.
(Quercus lobata)
54 Redwood 13.7 45 40/20 Poor vigor, fair form, top is dead.
(Sequoia sempervirens)
55 Redwood 10.6 65 30/20 Fair vigor, fair form.
(Sequoia sempervirens)
56 Redwood 12.3 65 40/20 Fair vigor, fair form.
(Sequoia sempervirens)
57 Redwood 13.0 65 40/20 Fair vigor, fair form.
(Sequoia sempervirens)
5.8 Redwood 14.5 65 40/20 Fair vigor, fair form.
(Sequoia sempervirens)
59 Redwood 10.1 65 40/20 Fair vigor, fair form.
(Sequoia sempervirens)
60 Redwood 11.3 65 40/20 Fair vigor, fair form, 5 feet from existing
(Sequoia sempervirens) drive way.
61 Redwood 18.6 70 55/30 Fair vigor, fair form, 5 feet from existing
(Sequoia sempervirens) drive way.
62 Mayten 8.2 60 15/20 Fair vigor, fair form.
(Maytenus boaria)
63 Mayten 8.4 45 20/20 Poor-fair vigor, fair form,tip die back.
(Maytenus boaria)
25857 Westwind Way/8/4/15 (7)
Summa ry:
The trees on"site are a mix of native oaks and several
species of imported trees. There are 12 native oak
species on site with.a.diaineter over.8-inches. All of
these native oak trees:are planned to be retained as they
5� a: ".l� = are assets to the property. Valley oak tree#28 has a
.: 4*r,{ .; diameter of 44.6 inches. .This tree is a magnificent.tree,
_ •
` •., = . with a great deal of maintenance applied to the tree in
g the past. There is'multiple cables installed in the
' `� canopy of the tree,to ensure:the trees safety, as well as
,., •�t• _ 4 a constant maintenance trimming done in the past to .. .
•Sx; lighten the heavy lateral limbs. This tree is the main
•�� tl °d ` t •focal point of the property and will be well protected
.tee �. W 4
44.
1.41:1( ,�, ; 6 ,_ 4;:A during construction activities. The new proposed
" 9 ,< building deck and overhang will be located 43 feet
away from valley oak#28. The construction will not
§ ¢ ; ; 1 ;-r 4x affect the oak as the work being done is of considerable
=�"{ s distance away from the tree Any roots found here
.a.o2-:.,.,� . ..
would be insignificant in size and to the trees health.
pimpacts tree#28 This tree is expected to have no im acts f rom
construction.activities.
There are 28 redwood trees on the property. These trees are not native to this section of Los
Altos hills. Redwood trees around town have been showing symptoms of drought stress,
although a majority of these redwoods seem to be in good health, a few of them have begun to
show minor symptoms of drought stress: These symptoms may be reversed by deep water
fertilizing the trees and putting them on an irrigation schedule. A few of these redwood trees .:
will need to be removed to facilitate the new driveway and parking area for the new proposed
home.
The north:east side of the property is on a slope. On this slope is what appears to be an old :.
apricot orchard. All of the fruit trees on this orchard are over mature and are in decline. A
majority of them are decaying at a rapid rate: There are no existing plans at this time for this
area.
All of the trees in the courtyard where the existing pool is located will be removedto facilitate
construction. These are allsmallimported trees under 10 inches in diameter. There are 2 nice
Japanese maples in the pool area that can be moved and saved if needed or wanted.
There are flowering plum trees that line the existing driveway. .All of these trees are in decline
as a majority othem have an abundance o ecay. These tree have a short life span and wil.
need to be replaced soon. A few trees located close to the existing home are not expected to.
survive demolition.of the home and will need to be removed. None of these trees are of heritage
size. The following tree protection plan will help to insure the future health of the retained trees:
25857 Westwind Way/8/4/15 (8)
Tree Protection Plan:
Tree protection zones should be established and maintained throughout the entire length of the
project. Fencing for the protection zones should be 6 foot tall metal chain link type supported
my 2 inch metal poles pounded into the ground by no less than 2 feet. The support poles should
be spaced no more than 10 feet apart on center. The location for the protection fencing should be
as close to the dripline as possible still allowing room for construction to safely continue. Signs
should be placed on fencing signifying"Tree Protection Zone -Keep Out". No materials or
equipment should be stored or cleaned inside the tree protection zones.
Any roots to be cut should be monitored and documented. Large roots or large masses of roots to
be cut should be inspected by the site arborist. The site arborist may recommend fertilizing or
irrigation if root cutting is significant. Cut all roots clean with a saw or loppers. Roots to be left
exposed for a period of time should be covered with layers of burlap and kept moist. The site
arborist will be on site for the excavation the foundation.
Trenching for irrigation, electrical, drainage or any other reason should be hand dug when
beneath the driplines of protected trees. Hand digging and carefully laying pipes below or beside
protected roots will dramatically reduce root loss of desired trees thus reducing trauma to the
entire tree. Trenches should be backfilled as soon as possible with native material and
compacted to near its original level. Trenches that must be left exposed for a period of time
should also be covered with layers of burlap and kept moist. Plywood over the top of the trench
will also help protect exposed roots below.
Normal irrigation should be maintained throughout the entire length of the project. The imported
trees on this site and any oaks near the construction will require irrigation during the warm
season months. Some irrigation may be required during the winter months depending on the
seasonal rainfall. During the summer months the trees on this site should receive heavy flood
type irrigation 2 times a month. During the fall and winter 1 time a month should suffice.
Mulching the root zone of protected trees will help the soil retain moisture,thus reducing water
consumption.
An inspection of the tree protection fencing may be required. Other inspections will be on an as
needed basis.
This information should be kept on site at all times. The information included in this report is
believed to be true and based on sound arboricultural principles and practices.
Sincerely,
Kevin R. Kielty David P. Beckham
Certified Arborist WE#0476A Certified Arborist WE#10724A
... _
//
• wAI
• .. . .. .. .. .. ARCHITECTS
ECT3 .
.
_ 4". . .
• • /. .
1... . .
..
% 41 (') 0 . elt ®`r )
` . .: .,,,, ,,,,,,t,,,,,,,.. ( ..^- �( i , . .. . .. ... . . ..
•
. . .
ars
.,. . ,, �r WOl
�‘k ik. II
1° r
�� ���
,. , , ,. :,'., ,.., ' ii: I ...
..1114. . , in .....; :_li:Li• -, :77. ,4):.:s„,;:.,,. .....:. ...... ,::, ,...,,,,, .:,,,,z ., ,. . , ,,,,,,.:. . .x.,„ . . .,, . .., .
a■�.■� ■■■■■■■■� � .�° HOUSE.•-
•fi • ).. TKO a ' F1u0t
_ '\. S5.0 9.mf
, P - • - in ow in, . i=WM . .
C®� ®.
• \ .��
.M
• •. 9455Y04 ]510.. - .,.....
... .n ry ,w0
WW Inn -`\. jam\\ .
110A..••IM n•S RO;k6.
4/1 n15011 Pa - Mm • / , /
MI • •••'
[KM GOVrt 417 .
!•W C1C. .. .500 •,I•
:
' wa .. .lon - : SITE PLAN
morn ,10t . 10553 • . '
•YS v um Vi0lWFOl Mk.• /'O I !
s[f5u5 ammo so n w a°m PROMO
a.
7•.
.I
sr ar-s //
nun v n
VST 90C »' N' IA'-]' ..
1 nr I - • I I r S I `C g — ��
•
ATTACHMENT 4
To: Los Altos Hills Planning Commission cc: Mr.and Mrs.Sundar Pichai
Phoebe Wong-Oliveros,Swatt Meier Architects
From: Stephen and Amy Kwan
Date: August23,2015
Ir
Subject:25857 Westwind Way,Los Altos Hills,CA 94022
We understand that Mr.and Mrs. Pichai have purchased the above property and are planning to build a new
home on it. We live on 25850 Westwind Way,right across from their property. The Pichai's home will be
very visible to us.
Last week, the Pichais and,their architect from Swatt Meier Architects held a review meeting with the
neighbors. They shared details of their plan,selected building materials,and a preliminary landscape plan.
We found their plans to be respectful of the environment and they observe the building ordinance of Los Altos
i Hills. We are very supportive of their plans,and we welcome them to the neighborhood.
Sincerely,
4.„
StWhen and Amy Kwan
•
•
1.
Gregory:L.Melchor,Trustee .
Jack L. Melchor Survivor's Trust Dated 2/17/11
635 Emerson St.
Palo.Alto, CA 94301
Tel.312.925,8234
27 August 2015
Los Altos Hills
Planning Commission
26379 Fremont Road
Los Altos Hills,CA 94022
RE 25857 Westwind Way-Pichai
To Whom It May Concern:
I am writing this letter in support of the proposed residential project of Anjali and
Sundar Pichai at 25857 Westwind Way.
As the owner of the house at 26000 Westwind Way and the three (3) smaller
adjacent 1.8 acre.parcels (apricot orchards) I was very pleased to see the proposed
plans. The family residence Swatt Meirs Architects designed will be a beautiful,
appropriate and compatibleaddition to our neighborhood.
We are very much in favor of the planning commission's approval of this project as
it will improve the entire neighborhood as well as add a very nice neighbor to our
small Westwind Way community.
If I may be of further assistance, please do not hesitate to let me know.
Very truly yours,
h.
Gregory L. Melchor,Trus ee
cg Christine Abraham c3
September 14,2015
Dear Members of the Los Altos Hills Planning Commission,
I am writing in support of the home being planned for the Pichai family at 25857 Westwind Way. I
attended a presentation by the architects from Swatt Miers at the property and was very impressed with the
beauty and appropriateness of the design. Tasteful,organic,clean lines,warm materials,and with careful
attention to how it is situated on the gently sloping property,the design is one I can fully support. While it
is a large home,they are within all of the square foot guidelines andseveral feet below the maximum
height. I feel it will blend beautifully into the natural environment.
They did not have a landscaping plan at the time of the presentation,but from what I saw from the other
Swatt Miers properties that they showed,and with the architects'vision of warmth and naturalness within a
modern sensibility,I can imagine it will thoughtfully designed. I do hope they continue to maintain the
existing orchard and incorporate the mature trees into the landscape plan.
Sincerely,
Christine Abraham
12630 Corte Madera Lane
Abraham.Christine@gmail.com
12630 Corte Madera Lane, Los Altos Hills,CA 94022
650-391-5116
Bill&Gay Krause
25855 Westwind Way
Los Altos Hills,CA 94022
Tel:650-948-4457
September 28, 2015
Los Altos Hills Planning Commission
26379 Fremont Road
Los Altos Hills, CA 94022
Re: 25857 Westwin Way-Pichai Family Home
To Whom It May Concern:
The purpose of this letter is to express our support of the proposed residential
project of Anjali and Sundar Pichai at 25857 Westwind Way.
As the owner of the property at 25855 Westwind Way,we were very pleased to see
the proposed architectural plans. The family residence the Swatt Meirs Architects.
have designed will be a beautiful,appropriate and compatible addition to our
neighborhood.
We are very much in favor of the planning commission's approval of this project as
it will be an appropriate addition to neighborhood.
We welcome Anjali and Sundar to our Westwind community.
Sincerely,
GIJdi'�'.c, /c�4c
L.William Krause