HomeMy WebLinkAboutSeptember 25 2017LOS ALTOS HILLS PATHWAYS COMMITTEE
Final Minutes of Regular Meeting of Monday September 25, 2017
Scribe: Alisa Bredo
1. ADMINISTRATIVE
a)Call to Order: PWC Chair RM called the meeting to order at 7:00pm
b)Roll Call:
Members Associates
Alisa Bredo (AB)
Nick Dunckel (ND)
Ann Duwe (AD)
Melissa Dyrdahl (MD)
Bob Elson (BE)
Rachelle Mirkin (RM)
Bridget Morgan (BM)
Judy Nagy (JN) (left 9:04)
Sonja Wilkerson (SWi)
Denise Williams (DW)
Susan Cretekos (SC)
Eileen Gibbons (EG)
Bob Stutz (BS)
Council Liaison(s) present: Roger Spreen
Members of the public Present:
1.Allen Chen, Public Works Director
2.Erin
3.Kjell Karlsson (7:35)
c)Agenda: AB moved to approve agenda, ND seconded, and the motion passed
with all in favor (AB, ND, BE, RM, JN, DW, SW)
2.APPROVAL OF MINUTES
a)Approval of Minutes from Aug 28, 2017 Pathways Committee Meeting:
ND moved to approve minutes as edited, BE seconded, and the motion passed
with all in favor (AB, ND, BE, RM, JN, SW) except DW who abstained due to
absence from last meeting
3.NEW TOPICS & ANNOUNCEMENTS
a)Staff update:
I.LAH Staff will start to prepare for winter (leaf blowing, etc.) mid to late
Oct
II.BE is working on a letter to Summerhill residents, was sent out to 6
residents (with more difficult properties) on Sept 21.
LOS ALTOS HILLS PATHWAYS COMMITTEE
Final Minutes of Regular Meeting of Monday September 25, 2017
Scribe: Alisa Bredo
1.24616 residents sent back note saying in support of PW project
but wanted to learn more about it. BE and Allen Chen, LAH
Public Works Director, will follow up.
III.Allen Chen. LAH Public Works Director, sent a letter last week regarding
herbicide spray on roadside paths for stinkwort in the most problematic
areas. The letter was addressed to all residents, but only affects a
quarter of residents (those with a pathway in front of their property).
There were prior LAH ordinances against herbicide sprays, but stinkwort
control is needed due to very high germination rate. Spraying will be
conducted the week of Sept 25 to first week of October. There is a map
of sprayed areas on town website, with dates.
b)Town Council Meeting Debrief:
I.AB provided update that request to remove requirement for path on
Ursula was denied in 3-2 vote.
II.Council Member Spreen noted that when property owner desires
alternate route to that on approved plan, it would be good for property
owner to work with PWC to discuss potential alternate routes.
III.PWC discussed native paths and the confusion that some property
owners may have regarding the definition of a native path. Allen Chen,
Public Works Director, sent a draft of a native path definition to AD some
time ago. Allen will resend draft native path definition to RM who will
agendize as continuing business for Oct PWC meeting. A native path
specifications document also exists and will be reviewed/made available.
PWC also discussed responsibility for maintaining native paths, which
rests on LAH Town Staff if not completed by homeowners.
c)PWC Operating Principles: PWC Chair shared draft of Operating Principles for
PWC Committee and requested input from PWC. PWC discussed and added to
the list [Attachment A]. RW will send to all PWC members for review, and PWC
will continue discussion at October PWC meeting.
4.CONTINUING BUSINESS
a)Property Review: APN 175-44-027, 12857 La Cresta, lands of Talagadadeevi &
Kagolanu, new residence
I.This property was discussed at the August PWC meeting but a decision
was not made due to a lack of clarity regarding existing easements and
whether a pathways easement could be requested over an existing
driveway easement. The proposed path is on the Master Path Plan and
would ultimately be part of a connection to Deer Creek Ln. PWC Chair
LOS ALTOS HILLS PATHWAYS COMMITTEE
Final Minutes of Regular Meeting of Monday September 25, 2017
Scribe: Alisa Bredo
shared email from LAH Sr. Planner [Attachment B], which stated that a
pathways easement could indeed be requested over the existing
driveway easement. PWC discussed the best location of the path, noting
that a native path adjacent to the driveway would be mostly in the
driveway easement, though it would need to meander around some
vegetation. In one area in particular it may need to be in the driveway in
order to go around an existing tree, but the driveway could be roughened
in that spot to allow safe travel. JN moved for the property owner at
12857 La Cresta to install a native path within the driveway easement
on the Southern property line to the most West point of the property as
close to the edge of the driveway as possible, noting that there will be a
slight overlap on the driveway that should be roughened. AB seconded,
and the vote was unanimously in favor (AB, ND, BE, RM, JN, SW) except
DW who abstained.
b)Master Path Plan – steps to approval
I.This item was not discussed due to absence of PWC member AD.
c)Maps
PWC discussed implementation of the GIS map, and whether it would be
advantageous to identify the side of the street for paths to be built in future.
The 2005 map had proposed paths, and the ‘Bubble Map’ identified the
preferred side of the street. AB agreed to follow up with Marni Moseley, LAH
Sr. Planner, regarding the feasibility in the context of the current contract for
the GIS map, and what next steps would be required.
d)Pathway Connectors / Potential CIP Projects
BE noted that currently there are 32 project suggestions. BE will contact PWC
members who suggested projects to identify 6-10 potential projects to present
to the Town Council for CIP approval. PWC will create packages for Council, and
should plan to have 8 or more by February. Progress made with Summerhill
(well on its way, reaching out to residents now) and ‘Altamont Plunge’. PWC
discussed doing new call quarterly to add project suggestions to the list. PWC
should contact BE for assistance with assigned projects as needed.
PWC discussed need for shared respository for PWC documents. Previously BE
had discussed this with Carl Cahill and RW had discussed with Allen Chen. RW
will follow up to identify repository.
PWC to let Rachelle know as new projects identified
e)Budget
I.VTO Update: SC updated committee based on last VTO meeting.
LOS ALTOS HILLS PATHWAYS COMMITTEE
Final Minutes of Regular Meeting of Monday September 25, 2017
Scribe: Alisa Bredo
Currently VTO is just vetting proposals, and there is no timeline for
submissions yet (should be communicated at next VTO meeting). There
are $5M in funds to be divided between counties and town, with San Jose
receiving majority. Summerhill is on the VTA path map for bicycles as a
route that is widely used without a preferred trail, so funding may be
possible for that. The path behind Bullis school would be another
possibility. SC has been involved with surveys on Fremont for bike traffic,
which is not currently on VTO map. PWC discussed using the Potential
CIP Project list to present proposals.
f)Communication and Marketing
I.SW provided update on Hoedown:
1.SW (and AB partially) participated, and sold 30 Pathways Walking
Maps. Giant map of pathways was available.
II.PWC discussed actively participating in more LAH Town events (recent
participation has been only Town Picnic and Hoedown).
III.PWC discussed and other means of possible communication/marketing
including:
1.Posting quarterly updates on PWC activities on the Town website
and possibly Town Crier
2.Communicating with realtors (PWC member noted that realtors
have been using Pathways Maps to help sell houses). Prior
presentation on PWC and how it works might be good resource to
share.
3.Quarterly walks, with prizes to kids for doing loops, scavenger
hunt on loops, or ‘can you find’ activity, taking pictures in front of
a number of things, etc.
4.Give Town Staff feedback in Our Town magazine
5.Create card for LAH Connect app to communicate its availability
6.Adopt a Pathway, possibly in conjunction with notification about
stinkwort, or start a ‘Friends of the Pathways’ group
7.T-shirts to support and communicate re: Pathways (e.g. ‘Pathways
are cool’, ‘Do you walk the pathways?’)
5.COMMUNICATIONS FROM THE FLOOR
There were no communications from the floor
6.OPEN DISCUSSION
Heather Rose from Education Committee requested a joint meeting with the PWC to
discuss routes to schools. BM, SW, JN, BE will attend. RW will forward introduction.
LOS ALTOS HILLS PATHWAYS COMMITTEE
Final Minutes of Regular Meeting of Monday September 25, 2017
Scribe: Alisa Bredo
7.NEXT PATHWAY WALK & MEETING
a)Next Pathway walk is Oct 21 at 9am, ND will lead.
b)Next PWC Meeting is Oct 23 at 7:00pm
8.TOPICS FOR NEXT AGENDA
a)PWC agreed to add the following topics to the October Agenda: native path
specifications, updates on business, properties
b)IIB path specifications update
I.Current IIB specification could be updated to better address eroding
issues. BE will talk with Allen and PWC may agendize.
9.ADJOURNMENT
a)DW moved to adjourn the meeting at 8:47, SW seconded, and with all in favor
the meeting was adjourned.