Loading...
HomeMy WebLinkAboutFinal Minutes May 22LOS ALTOS HILLS PATHWAY COMMITTEE MEETING Minutes of May 22, 2006 1. A. The meeting was called to order at 6:10 p.m. by Chairman Ginger Summit. B. Present were: Duwe, Brunzell, Corrigan, Ginzton, Silver, Stutz, Wagner and Welch. Vargas arrived late. Ad hoc committee was represented by Earnest and Schreiner. C. The agenda was approved as amended below. Corrigan moved; Stutz seconded. 2.New Business A. Review of off-road path areas recommended for review by Council ii. Zappettini Ct/Central Drive connection. The Committee is sticking to its original recommendation as per the Minutes of September 26, 2005. Silver agreed to work with the Town Engineer on details of the route. The Committee agreed to seek an easement across the portion of 11641 Buena Vista, north of Central Drive from the existing conservation easement at the boundary where 12541 Zappettini meets 11641 Buena Vista. Silver moved; Duwe seconded. Unanimous Yes. i. Story Hill/Page Mill area. Ginzton stressed the need to put A2.3a and A2.3b on the Off-Road Map. Duwe agreed to work with Dr. Loeb, owner of the property at 28140 Story Hill, to seek the needed easement. The goal is to connect Story Hill to the existing path built by the Loebs along their property line with Foothill Park and further to connect with the path of long standing along the creek at 12345 Page Mill Road. The Committee agreed to stick to its original recommendation as per the Minutes of September 26, 2005. By way of clarification the Committee agreed the path leading back to Page Mill Road from 12345 should avoid the driveway if possible. Ginzton moved; Stutz seconded. 8Yes, 1 No. iii. Maple Leaf Ct/Via Feliz connection. The question is whether the owner at 27801 Via Feliz would trade the existing easement for an easement running where the green dotted line is drawn (between B2.9 and B2.10.) The owner has not been reachable. The Committee agreed to have the map reflect two routes, pending discussion with the owner over the choice, with the proviso that the Committee prefers the southern route (the dotted green line.) The lot will not be surrounded. Vargas moved; Silver seconded. Unanimous Yes. iv. Lands of Evershine. La Paloma/Atherton Ct connection. The Committee agreed to stay with its original recommendation and switch easement on 12940 Atherton Ct. to the dotted green line at the top of Atherton Ct. cul de sac. Two other hot spots will be discussed at future meetings after owners are notified. The two are: St. Nicholas/Vorhees Dr. and Fernhill/Magdalena. 2B. Review of Master Path Plan recommendations for roadside paths (Committee members are reviewing their squares with respect to the map of 5/2/06, which is incorrectly labeled as an Off-Road Pathway Plan.) Committee members are also reviewing the Maintenance Priorities list Chairman Summit developed from the individual reports on each grid. 2C. Maintenance concerns. Chairman Summit reminded everyone to prepare to submit our Capital Improvement list at the June meeting. 3. Old Business 3B. Chairman Summit invited everyone to the Foothill/El Monte pathway groundbreaking ceremony on June 9. Rsvp to Karen Jost. She also reminded everyone about the Town Picnic June 4. Summit, Brunzell and Duwe will sit at the Pathway table. 4. Communications Schreiner reminded Committee members that the Town is working on the General Plan. The Housing and the Circulation elements are done. Bill Silver was officially welcomed onto the Committee. B. Meeting schedule: Next regular meeting June 26, 2006, 7:00 p.m. Next pathway walk, June 24, 2006, 8:30 a.m., Town Hall The minutes of the meeting of April 24 were approved. Ginzton moved; Wagner seconded. Silver abstained. Unanimous Yes. The meeting was adjourned. Respectfully submitted by Ann Duwe