HomeMy WebLinkAboutFinal Minutes May 10LAH PATHWAY COMMITTEE (PC) SPECIAL MEETING MASTER PATHWAY PLAN (MPP) UPDATE Minutes for May 10, 2004 ROLL CALL at 6:06 pm, COUNCIL CHAMBERS, 26379 Fremont Road Present: Chris Vargas (CV), Chair, Nancy Ewald (NE), Charlene Geers (CG), Nancy Ginzton (NG), Secretary, Mike Kamangar (MK), DuBose Montgomery (DM) (left at 8:30), Bob Stutz (BS), Ginger Summit (GS), Vice Chair Absent: Richard Cassam (DC), Fred Fallah (FF), Jorge Fernandes (JF) Also present: Adhoc committee members Dot Schreiner, Carol Gottlieb, Les Earnest PRESENTATIONS FROM THE FLOOR related to the MPP Update: • Dot S: Pinewood School comes before Planning Commission this Thursday (5/13). Staff has recommended denying their request for use of artificial turf (new to the town). Re our path recommendations: 1) cannot get Proscriptive easements on school property and 2) Pinewood cannot legally grant path use. The PC generally felt that the school should not be penalized for what they have no control over. DM was concerned that if not allowed the turf, Pinewood may decide to gate the path. NE suggested keeping our April 26th recommendation; said that the Pathway Committee was doing its job; knowing that Planning Commission may overrule it. CV noted that the negotiation was done in good faith. Dot feels it important to read the Staff Report before attending the meeting. NE and GS will attend Planning Thursday. • CV: the goal for public hearings has been changed to the end of August/September. Although we cannot get everything done by June 21st, it will remain our goal. CV reported that Carl Cahill Eric confirmed that 2 members’ appointments were up in July. Postponing the joint Pathway/Planning meeting until after that, maintaining continuity throughout the MPP Update process. • NE brought food and drink. They were much appreciated. MASTER PATHWAY PLAN UPDATE May regular path inspection walk: May 22 at 8:30 am May regular Pathway Committee meeting Monday, May 24, 2004 at 6:00 pm June special MPP Update meetings: Monday, June 7 and 14, 2004 at 6:00 pm June regular Pathway Committee meeting Monday, June 26, 2004 at 6:00 pm The working map: notation review: green: retain on MPP; red: remove from MPP; yellow: under discussion; blue: potential for new critical connection(s); want resident input; hollow big circles: ‘Z’, zones up for discussion; arrows. Continued with the Master Pathway Plan update by quadrants: Quadrant A2, B2, C2 changes Quadrant D3 (CV, FF not present) 1st review Quadrant C3 (BS) 1st review Quadrant C4 (BS) 1st review Quadrant D4 (MK) postponed Quadrant B3 (NG) not done Carol G would like Quadrant C2: Atherton Ct route(s) to be reconsidered – a good connecting path From Vista Serana, NW to Robleda, then, via Atherton Ct, to La Paloma Quadrant B2 changes: B2.13d red off Elena at 280, paralleling 280 B2.22.2 blue Dan Alexander’s portion of B2.22. NG will ask Dan’s route preference Quadrant A2 changes: A2.6a green W-E, Middle Fork through 13124 Byrd Lane A2.6b green southern boundary of 13115 Maple Leaf Ct A2.9c green-dotted and red Leave red because path in use; dotted green to shown line modification: line closer to southern boundary; need 2 switchbacks through conservation A2.9a (the west boundary of 27330 was the easement already vacated) A2.Zone 8 blue (was A2.12) Quadrant D3 (CV, FF not present) 1st review: Voorhees to Hilltop Barley Hill to Miraloma ‘center point’ is approximate intersection of these 2 lines D3.leg 1 green Miraloma to ‘center point’ D3.leg 2 yellow Hilltop to ‘center point’ D3.leg 3 green Barley Hill to ‘center point’ D3.leg 4 green Voorhees to ‘center point’ Check color of path and road of Miraloma Way (the road is private; is there a public easement?) D3.5a (existing path along 280 , from Clausen Ct to Dawnridge) D3.5b (existing path at northern end of D3.5a, to Barley Hill; an emergency access road, ) D3.6a blue from Princess Elleena bulb to/along 280, N at 24274/24300 connecting to Dawnrigde Rd. If local Princess Elleena Ct want it; redundant; change route D3.6b red 280 side of 24300 Dawnridge D3.7 green N-S, Hilltop end to Dawnridge end connection D3.8 (PUE) remove from MPP D3.9a green along 280, 12400 El Monte through 11637 Magdalena D3.9b green 280 to Rebecca Ln, between 11623/11627 Rebecca Ln D3.9c red north boundaries of 11637/11633 Rebecca Ln (dark green) D3.9d green along 280, between 12129/12131 Oak Park Ct D3.10 green/green arrows 11641 Dawson, with green arrows at either end D3.11 green 11653/11683 end of Dawson (gated fire road), towards Oak Knoll Circle D3.12 green 280 to Barley Hill, between 12291/12135 Barley Hill Motion: to approve D3.1-12, excepting D3.leg 3; and corrections to other sections as noted on map. Unanimous approval. Motion: to approve D3.leg 3. Approved (5-3). Quadrant C3 (BS) 1st review: (C3.3a 12235 Stonebrook Ct – look at permit for ___________) C3.1 green along 280 C3.2 green Foothill College: existing path(s) must be renegotiated. Hold off on these paths until BS can meet with them and find out what they are doing. Keep pink; convert light green lines to green arrows. C3.3a green Stonebrook Ct to junction of 12150,12020,12200 Edgecliff Pl C3.3b green junction of C3.3a to El Monte C3.3c red junction of C3.3a to Edgecliff Pl C3.4a red W-E, from NW corner of 15451 Vista Serena to NE corner of 25383 La Rena C3.4b green arrow from NE corner of 25383 La Rena towards Robleda C3.5 blue request resident input, connecting ends of Adobe Ln and Summitwood Ct, 25466/25440 Adobe Ln C3.6a green south end of Finn Ln, dark green of 1 property, towards Laura Ct C3.6b green arrows N-S light green line to 2 green arrows, Finn Ln to Laura Ct C3.7 red N-S 25010/24990 La Loma Dr (old road) C3.8 yellow Cantanta Way to O’Keefe Open Space C3.9 red S corner of O’Keefe Open Space to 280 C3.10 green light green at end of Priscilla Ln C3.11 red dark green, 12380/12378 Priscilla Ln to 280 C3.12 green county road, connecting Basset Rd to La Loma C3.13 red NE boundary of 25740 Josepha Quadrant C4 (BS) 1st review - not completed - Choose either C4.1a or C4.1b, Laura Ct to La Loma C4.1a northern route C4.1b southern route Quadrant C2 changes: C2.17 green arrow Dover Ct north towards C2.16 (a future Los Altos path) Motion: to approve C3 and further changes to other section(s). Unanimous approval. MEETING ADJOURNED AT 9:22 pm