Loading...
HomeMy WebLinkAbout55-20RESOLUTION 55-20 A RESOLUTION OF THE CITY COUNCIL OF THE TOWN OF LOS ALTOS HILLS AWARDING A CONTRACT FOR THE ENGINEERING ANALYSIS OF THE ADOBE CREEK SEWER SYSTEM TO FREYER & LAURETA WHEREAS, the Town of Los Altos Hills is a sewer operator and manages a sanitary sewer collection system; and WHEREAS, the 2018 Sanitary Sewer Master Plan identified sewer capacity deficiencies at two locations along the Adobe Creek sewer main and CCTV results show multiple defects and infiltration along said branch; and WHEREAS, the Public Works Director released a Request for Proposal for the engineering analysis of the Adobe Creek Sewer System, and the Public Works Director thoroughly evaluated the proposals and conducted interviews with highest ranked consultants; and WHEREAS, F&L was selected as the consultant with the qualifications and expertise to complete the study; NOW, THEREFORE, BE IT RESOLVED by the City Council of the Town of Los Altos Hills that the City Manager is hereby authorized to award a contract to HF&H for a not -to -exceed amount of $48,460. The above and foregoing resolution was passed and adopted by the City Council of the Town of Los Altos Hills at a regular meeting held on the 15th day of October 2020 by the following vote: AYES: Wu, Tanklia, Corrigan, Spreen, Tyson NOES: None ABSTAIN: None ABSENT: None ATTEST: t 44&�U_ eborah Padovan, City Cleric BY: Michelle Wu, Mayor Resolution 55-20 Page 1