Loading...
HomeMy WebLinkAboutNoll & Tam ArchitectsThis Addendum To Professional Services Agreement (the "Addendum") is made and entered into on the 9th day of December, 2020 by and between the Town of Los Altos Hills (herein referred to as "Town") and Noll & Tam Architects (herein referred to as "Contractor"). In consideration of their mutual covenants, the parties hereto agree as follows: This Agreement amends and modifies the Professional Services Agreement ("Agreement") dated September 21, 2020 made and entered into by the parties here as follows: a. The scope of work is amended to include integration of the public art/sculpture into the site and landscape plan design and development, and design of a fire suppression system in the Town Hall Addition, as outlined in the attached Additional Service Request No. 1. b. The compensation for full performance of the scope of work for this Addendum is an amount not to exceed eleven thousand seven hundred and eighty dollars and zero cents ($11,780) during the Deign Development (DD) and Construction Drawing (CD) phases of the project. c. With this Addendum to the Agreement, the total compensation for the Contractor is an amount not to exceed two hundred and twenty thousand six hundred and fifty-six dollars and zero cents ($220,656) 2. All other provisions of the Agreement remain in full force and effect, other than any provision that conflicts with the terms and spirit of this Addendum, which shall be deemed to be amended appropriately in order to be consistent with this Addendum. IN WITNESS WHERE, OF, the Parties have executed this Addendum on the date first written above. By: Janet Tam, Principal TOWN OF LOS ALTOS HILLS: By: Carl Cahill, City Manager M 12 - Date Los Altos Hills Town Hall Expansion ADDITIONAL SERVICE REOUEST NO. I November 24,2020 Zach Dahl Planning and Building Director TownofLooAltos Hills 2b37PFremont Rd LoaAltos Hills, CAP4-O22 Re: Public Art Coordination and Fire Suppression System Scope Dear Mr. Dahl, Per Town request, weare submitting anadditional service request tocover A}Coordination ofpublic art / aou|ptuepmpooa|(datadJuk/2O20byStoUexStudk)inimthepnojatdeokJnandE0Amaeoamertanddeaignvia performance specification of Fire Suppression system for new Town Hall addition. Thomas KloDe. Landscape Architect Scope ofwork • Proposed fees include DID phase only for the following design and coordination services: o Pedestrian paving layout and paving material selection o Conceptual Grading Design o Traffic Safety Design o Seating design and layout o Planting Design and plant material selection • Also included are coordination and design meetings with the Public Art Committee, Stoller Studio, Noll & Tam Architects Scope of Work: m Fees cover additional meetings for coordination and design with Public Art Committee, Stoller Studio, and Town Staff. • Coordination of design between Stoller Studio, Klope Landscape Architects, and Lea & Braze Civil. m Incorporation ofdesign revisions into DDphase documents. 729 Heinz Avenue #7 1 Berkeley CA 94710 1 510'542'2200 1 **mnuUendmm.cnm Page 1 of B) Fire Suppression System Alter Engineering / HYT � One project site visit to observe current conditions and existing fire sprinkler system features. • Prepare design -build sprinkler specifications in accordance with applicable codes and standards for incorporation into the project documents. m DD/CD phase work includes only design -build specifications for planned expansion ofthe existing fire sprinkler system. • Bid/ CA phase work includes review and response -to bidder questions, and providing addenda to specs, as needed. Review ofcontractor shop drawings and submittals, and review and response to contractorRF|m. Deliverables: As noted above. Fees: The -fee for this scope shall not exceed $11,780, billed monthly as a percentage of completion based on hours accrued. FeeyahaUnctexceed-thestatedva|uewithout -the Town's prior written approval. Total ASIR1 Noll & Tam Architects $2,050 Thomas K|opeLandscape Architect $6,930 Alter Engineering $2,800 Total Additional Fee Requested $11,780 Sincerely, Janet Tam date Principal Noll &'FamArchitects /T12W/2O2D Zach Dahl Planning and Building Director Town of Los Altos Hills Noll & Tam Architects | November 24,2O2O | Los Altos HU|sTown Flail Expansion | Additional Service Request Nn.1 Page 2uf2 Novezxxiber-16, 2020 Ms. Dora Pollak Noll and'Iam Architects 729 Heinz Avenue #7' Berkeley, CA 94711, Subject Public Art"Compotxent Additional Scope of Work Proposal Los .Altos Mills Town gall Expansion Project Los. Altos Hills,, Cali£orna Dear bora: P i ANVP4C.UT'. Attctfrri;C'rs We are pleased to provide this proposal for additional landscape architectural design development services to our contta ct for the i elusion of a public art component to the Los Altos Hills Town Center Expansion Project. `l"his proposal is based on the Site Concept document, dated July 2020 by Stoller Studio. Cour outline of additional services required for the design of the sitework assoaatedvriflt the new public art component and. estimated hours includes: Pedestr=ian T Conceptual Exterior Li;? Seating Desi Planting De, Services Paving Material Selection Design .l .,Material Selection. Itemized Tasks and Hours Base Sheet Preparation 2 0 Project'Tearn and Tovnz Staff Coordination Meetings 2,f) Stoller Studio Coordination Meetings 2.0 Public Art Committee Meetings and Coordination 4,0 Conceptual Design and Drafting 16.0 Conceptual Design Refinement 6.0, 3-D Rendering 6.0 egi Presentation Preyarat on : 4.0 TOTAL 110VIISi 42:0 :Based on otir average office: staff billing rate of $150:00 per hour, we propose a j5xed fee of X6,300.00 for abo.ve'scope of work We propose that servic6s be provided at the same terms as our project Agreement. We look :forward to the opportunity of including the Public: Art Component Additional Scope of Services to our contract. Please feel free to contact me vrith any questions or comments regarding t1 -As proposal: Yours MAY, At" Thomas Klope, ASLA quA #2337) 5150111. C ' INO IgA1 -1 LDG. B, SUI TE 20 a LOS TOS, CA 9022 -1' 650.691,1000o o F^ 50. r91,1ti14 CAJUA123311 November 11, 2020 Janet Tarn Noll and Tarn Architects 729 Fleinz Avenue #7 Berkeley, CA 94710 Protect Understanding The scope of this add service covers the 2,000 CSF addition to the existing town hall building, Scope of Professional Services HYT Corporation will provide the fire protection consulting services associated with the development of a "clesign-build" specification for the proposed expansion project. Design Development HYT Corporation will visit the project site once to observe the current conditions and existing fire sprinkler system features and meet with the protect. personnel (concurrent with the site visit) as necessary, HYT will prepare a design -build fire sprinkler specification in accordance with applicable codes and standards for incorporation into the project documents. Deliverables will consist of a design -build specification for the planned expansion of the existing fire sprinkler, system Currently serving the building. No drawings or calculations will be provided as part of these services. FlYT will furnish the design-bUild fire sprinkler specification in electronic form, only (Word.DOC and PDF files) via e-mail attachment for incorporation into the project dOCUrnents. Construction Documents No new/additional services or deliverables anticipated. I IYT will update the provided specification, as necessary. Bidding and Construction Period Construction period services are essential to a SUCCeSSfUl project. I­lYT Corporation offers to provide construction period set -vices associated with the system installations, These set -vices will consist of thefollowing: 1. Review and respond to bidder questions, as needed. 2. Provide addenda to specification, as needed. 3. Reviewing contractor shop drawings and submittals, 4. Review and respond to contractor' requests for information. We will deliver letter reports to document design clarifications arid submittal review. We are assuming that the contractor" will assume responsibility for the installation, in accordance with www.AlterEngiiieers.com 1624 Franklin St. Suite 1300, Oaklaud, CA 94612 AAIter consliffing Ingineers California contractor's license reqtArernents, by displaying their c(:)ntractor's license riLimber on the fabrication drawings, and will be responsible for the day to day construction managerrient arid inspection of their work. AsSUrIlptiOrIS • Drawings will be provided in electronic format in ALItoCAD or PDF. • ConstrUCtiOn cost estimating will be completed by a different consultant. Fees Our fee to provide the above-described scope of consulting engineering services will be a fixed fee, billed monthly, based on percentage complete and the terms OUtlined in the proJect's master contract. Design Development $2,000 Construction Docurnents $0 Bidding arid Construction $800 Total $2,800 Terms Refer to base scope proposal "Los Altos Town I -loll DD -CA AlterCE Proposal.pdf'. Proposal Approval / Billing Confirmation To: Janet Tam, Noll and Tam Architects 729 Heinz Avenue #7 Berkeley, CA 94-710 Re: Proposal for fire sprinkler desig-r) Wild services for the Los Altos Hills Town I lall Addition D To confirryi acceptance/approval of any eler-rierit of this proposal, please sig-ri and return to shannorinq altererip-ineers.coryi, Accepted by: signature Date Job or PO Mirnber (if required) Phone NMI= Contact Name www.AlterEngiiieers.com 1624 Franklin St. Suite 1300, Oakland, CA 94612 A I t e r Consulting Engineers