HomeMy WebLinkAboutJuly 27PATHWAYS COMMITTEE Regular Meeting Agenda
July 27, 2020 at 7:00pm
TELECONFERENCE SPECIAL NOTICE
Pursuant to Executive Order N-29-20:
NOTICE OF TELECONFERENCED MEETING
Pursuant to the Governor's Executive Order N-29-20 (dated March 17, 2020), Committee
Members may participate via teleconference. Teleconference locations are not open to the
public pursuant to California Governor Executive Order N-29-20. For this meeting, there will be
no physical location from which members of the public may observe/comment.
Members of the Public may participate and provide public comments to teleconference
meetings as follows:
To participate via a computer, visit:
https://us02web.zoom.us/j/89236833656?pwd=K3hqdWlPWjQ0MGNHSHA2czhGL2VNUT09
or To participate via a telephone, dial: (669) 900 6833; Meeting ID: 892 3683 3656 Passcode:
408373
Before speaking, please identify yourself by name and where you reside. Note: All votes shall
be made by roll call and individual votes will be stated in the minutes
1.Call to Order (roll call)
a.Members
i.Alisa Bredo AB
ii.Ann Duwe AD
iii.Nick Dunckel ND
iv.Bob Elson BE
v.Val Metcalfe VM
vi.Bridget Morgan BM
vii.Judy Nagy JN
viii.Richard Partridge RP
b.Associate Members
i.Jim Waschura JW - resigned associate status as he is now on the
Planning Commission.
ii.Nina Sutaria
c.Staff
1
i.Nichol Bowersox
ii.Christine Hoffman
d.Town Council
i.Roger Spreen
ii.Courtenay Corrigan
e.Public
i.Howard Lee
ii.Jay Sutaria
iii.6508236831
iv.George Clifford - Open Space Committee
2.Agenda Review
3.Review & Approval of Minutes of:
a.June 22, 2020 - Will be presented at the next meeting
4.Ex Parte Communications - AB email exchange with George Clifford regarding the
Sherlock Property.
5.Announcements/Updates
a.Town Staff Updates
i.GIS Map Update - Zach is out this week so there is no update.
ii.Status of approved CIP Projects
1.Altamont Plunge - Trail People have given some suggestions.
These will be forwarded to the committee.
2.La Paloma to Robleda - Sophia Zander reviewed Tim Best’s report
and has given some feedback. The report will be shared with the
committee and residents that are interested in this topic. This is a
draft report. This report is extra and is not the environmental study.
The document mentions the current “unofficial path”. Bridget
Morgan wants to go on record that the illegally built path should
not be called an “unofficial path”. The fence by the Millner property
has been vandalized again.
3.Central Drive - pathway has been resolved as best it can. It is
steep but does have water bars and a hand railing installed.
4.Summerhill - RFP for the survey work for Phase 2 including
confirmation of the road right of way and the current easements.
The RFP will go to the Town Council in August.
iii.2020 CIP Project Updates - none
iv.Native Path specification - Staff has worked on this and have incorporated
Bob Elson’s comments. Most of the comments have been incorporated
and the document will be ready to come back to the PWC committee. ND
mentioned that water bars every 3 ft of elevation might be too far apart.
Nicol replied that she has modified that section to allow staff the flexibility
to change this as necessary. AD would like to add that fencing would be
split rail style.
b.Maintenance and Enforcement Issues
2
i.Update on blocked paths
1.Fran’s Path - Staff will be digging in the next few weeks to try to
figure out where the water is coming from.
2.BE asked about the blocked path at 28545 Matadero Creek with
two gates blocking the path. This is in Zach’s area so she has no
new information at this time. The issue is in code enforcement.
3.Blocked path on Oak Knoll. AD mentioned that it is an emergency
access easement.
ii.Maintenance
1.Sewer work on Elena. Gravel was added but no side boards or
curb to hold the gravel in. Also on Elena Road, in the segment
across from 25680 Elena, all the surface material is gone, and
there are hazardous roots. Shrubs need some trimming to clear
the path as it heads toward Green Hills Court. Nichol mentioned
that this will be addressed before the project is finished.
2.There have been a few water main breaks that have washed out
some pathways. Staff is keeping track and will get these pathways
restored.
3.Bob Stutz trail - There is a header board that has nails sticking up
that is a safety issue.
c.Update on planned schedule for Planning Commission and City Council review of
pathways - There is no one on the call from planning to report.
6.New Business
a.Property Review
i.25680 Elena Rd (New Residence & ADU, File SD20-0050 , APN
182-16-053) The plans do not include any of the existing 2B pathway on
the plan set. AD made a motion to have the current 2B pathway that is on
this property be added to the plans and to restore it after construction is
completed. BE seconded (BM, JN, AD, VM, BE, RP, ND, AB - yes)
Approved unanimously.
ii.27388 Sherlock Ct (Lands of Chung, New Residence, File SD19-0003,
APN 182-29-038) This property was previously reviewed at the Jan 28,
2019 meeting. Previously an off road pathway from Moody Ct to Sherlock
Ct was recommended. George Clifford mentioned there is a private road,
Toyon Place and a public road, Moody Ct along the West side of this
property. There was discussion about whether we could ask for a pathway
easement along the proposed driveway that connects Toyon Place to
Sherlock Ct, as was previously recommended. Jim Washura mentioned
that this property has an easement granted from the neighboring property
to get to 27388 from Sherlock Ct so the homeowner on 27388 can not
grant access to Sherlock Ct. There is a large Open Space easement on
this property. It was agreed that Roger will work to get clarification.
3
b.Stinkwort (Open Space Committee Update) - George Clifford from the Open
Space committee mentioned that the committee works around this time of the
year to help map out where Stinkwort is in our town. The Open Space Committee
focuses on the roads and would like to encourage pathway members to walk
pathways and report any along the town pathways. Please email George at
George@Clifford.net .
c.Election of Officers - Bob would like to throw his hat in the ring for Chair. AD
seconded. BM asked if VM would be Chair or Vice Chair. VM declined the
nomination for chair but agreed to vice chair nomination. BE nominated AD could
be secretary. BM mentioned that AD is off the committee in November so that
would only be temporary. VM asked if Judy would continue as secretary. Judy
agreed. (Unanimous for all 3 votes).
7.Old Business
a.Master Path Plan Update Refresher - Removed from the agenda
b.2021 CIP Projects
i. La Paloma connections - no report
ii. Altamont to Silent Hills Connection - VM confirmed with Jacob that this is a
maintenance issue.
iii. Missing Segments on Magdalena - No report. Please reach out to Jim if you
would like to work on this project.
iv. New suggestions - none
c.5 Year Plan – Suggestions - VM thinks we should be thinking about the role of
the committee as things have changed and we should think about and give input
on what our committee’s role going forward.
8.Presentations from the Floor - none
9.Topics of Interest / Open Discussion - None
10.Agenda Topics for Next PWC Meeting - AB mentioned as we will have new members in
December, we should review on boarding new members. VM asked if we should
consider reducing the size of the committee.
11.Reports from Other Meetings
a.VTA Meeting - Most meetings have been cancelled or rescheduled.
b.City Council - none
c.Planning Commission - None
d.Fast Track
i.27408 Deer Springs Rd - AD attended the meeting. Zach recommended
that the pathway easement be together with the emergency access
easement. There is a chain across the emergency access easement.
Staff is working to ensure horses can get around the chain and safely
onto the pathway.
12.Pathway Promotion & Communications
13.Next Pathway ‘ Walk ’ (independently): August 22, 2020
14.Next Pathway Meeting: August 24, 2020
4
15.Adjournment
5