HomeMy WebLinkAbout47-23RESOLUTION 47-23
RESOLUTION APPROVING FISCAL YEAR 2023-24 PROJECT LIST TO BE FUNDED
BY THE STATE SENATE BILL 1, THE ROAD REPAIR AND ACCOUNTABILITY
ACT OF 2017
WHEREAS, Senate Bill 1 (SB 1), the Road Repair and Accountability Act of 2017 (Chapter 5,
Statutes of 2017) was passed by the Legislature and Signed into law by the Governor in April
2017 to address the significant multi -modal transportation funding shortfalls statewide; and
WHEREAS, SB 1 includes accountability and transparency provisions that will ensure the
residents of the Town are aware of the projects proposed for funding in our community and
which projects have been completed each fiscal year; and
WHEREAS, the Town must adopt by resolution a list of projects proposed to receive fiscal year
funding from the Road Maintenance and Rehabilitation Account (RMRA), created by SB 1,
which must include a description and the location of each proposed project, a proposed schedule
for the project's completion, and the estimated useful life of the improvement; and
WHEREAS, the Town,will receive an estimated $210,196 in RMRA funding in Fiscal Year
2023-24 from SB 1; and
WHEREAS, this is the seventh year in which the Town is receiving SB 1 funding and will
enable the Town to continue,,! essential road maintenance and rehabilitation projects, safety
improvements, repairing and replacing aging bridges, and increasing access and mobility options
for the, traveling public that would not have otherwise been possible without SB 1; and
WHEREAS, the Town has undergone a robust public process to ensure public input into our
community's transportation priorities/the project list (Attachment A); and
WHEREAS, the Town used a Pavement Management System to develop the SB 1 project list to
ensure revenues are being used on the most high-priority and cost-effective projects that also
meet the communities priorities for transportation investment; and
WHEREAS, the funding from SB 1 will help the Town maintain and rehabilitate streets and
roads, and add active transportation infrastructure throughout the Town this year and similar
projects into the future; and
WHEREAS, the 2021 California Statewide Local. Streets and Roads Needs Assessment found
that the Town's streets and, roads are in a "good" condition and this revenue will help us increase
and maintain the overall quality of our road system; and,
WHEREAS, the SB 1 project list and overall investment in our local streets and roads
infrastructure with a focus on basic maintenance and safety, investing in complete streets
infrastructure, and using cutting-edge technology, materials and practices, will have significant
positive co -benefits statewide.
Resolution 47-23 Page 1
NOW, THEREFORE IT IS HEREBY RESOLVED, ORDERED AND FOUND by the City
Council of the Town of Los Altos Hills, State of California, as follows:
The foregoing recitals are true and correct.
2. The fiscal year 2023-24 list of projects planned to be funded with Road Maintenance and
Rehabilitation Account revenues (Attachment A).
The above and foregoing Resolution was passed and adopted by the City Council of the Town of
Los Altos Hills as a special meeting held on 17th of May 2023 by the following vote:
AYES: Swan, Mok, Schmidt, Tankha, Tyson
NOES: None
ABSTAIN: None
ABSENT: None
BY:
Linda G. Swan, Mayor
ATTEST:
Pebo,ah L. Padovan, City Clerk
Resolution 47-23 Page 2
Z
F-4
4-J
4-J
0
L.
CL
4-J
E
0
0 L. -
4-J CL
E
to0
..j CQ
4— 0
0 no -
c
0
ca
(on
0
CN4
C-4
-0 L.L r -I
�:,- r*--.
c 0
co rJ
4-
I-
0
cu
cu
+5 m
OJ Co
+-)
+-, C.
cu =3
4- 0
-0 0 U
QJ
bi) c -
CL cu
L-
=3 CL
4- (L)
C
• 0
0 4--J CD
r-4 M 0
4-J CC
4-
0 0 C)
(A CL
C)c-
4-J 4-J
N
4-J
M 4-J
4-J co
L O
E
co
E
4-J
QJ
V-)
4-
0
O 'E
bn
Nai E
w
Ln
aj
cu
4-j
0 C) 0
u 4-J 3:
L- OL (Ij
CIJ 4-J
CU
L-
_0 . 4-J
CU 0. CL C)
0
-0 4-J
N 0 rL
L
0
>
re0 CL (1) 4-
'< -0 OJ
w c C-
C- 4-J
4-J 4-
0 0
CD CU 0
Ln >
0 E
ai
CO 4-J 4-j
U
W >
•0
0
L-
CL
0
cli 0 r--4
C)
-C 4-J m
. a r44 •Ln
uj
ui
H:
i
co
co
LL
ui
0
r4
0
Lu
Lr)
Lr)
LLJ
N
LLJ
Z
0
r*4
0
0
NLJJ
p
j
0
CL
-J
u
W4
500
0
0
W
0
ui
0
®
C)0
<
(D
0
m
r
M
N
m
kD
co
4./*)-
ui
N
4-J
Ln
Lr)
u
V)
co
r4 a
4-J 0
:3 4-
+J
cl)
Cl)
3r.
0
.-a
Ln co
CU MO
0 - 4-J.
= :B
>-
-0
0
CL
4-J
a)
I -C
0
-0
-0 c
.0
•
Z
:3 u
M
4-
=3 X
0
a)
a
M
4-J
L-
a—
=
C=
c
0
>
CU
C:
0
4,
0
0
C:
0
cn
0
-;-j
E
m
V
u
u
CU m
+-#
CU
M
L-
W
4-1
-0
0
0.
.01
U O
L0
-C
C
0
z(wo
4-
V)
4-J
0
0
0
buO 4-
0-
0
E
o
w
0
tw
V
4-
L-
+J
0
0
L -
(A
LU
U
W
r
C-
4-J'
-C
4-J
E 0
4-J
U
4-J
+-j
4-J
•-
t
u
-4.
ai
E
r
(n
Nm
0
U
ui
0
E
0
CL
C:
0
4 -J bD+.1
0)
L-
4-
c
Q)
>
C:
m
D-
w
CG
CL
>
F—
. 0
m
:3
Q. 4-J Ln
Ln
4-
E
C:
NN
-0
cca
c
4 -JL
C: CU
-w0
+j0
(n
co
r4
co
fo.
E
v)
>
E
E
.Ln 0
0
u
E
4-JCU
CL
-C
4-J
0
x
Ln
>
cn
L
u
0)
4-J
U
C)
0
Cl)
4-J
0
4-J
u
Q) 0
b-0 4-J
E m
cu E
ui
>
CU
CU
0
C-
0
a-
> 0
E
Ln
2
4-J
CUO.
ce.
m CU
L
N
-W
0
0 w
'N cr-
Ln
CU
CO
r4
2023 Pavement Rehabilitation and Drainage Improvement Project Specifications -- Streets List
Street
From
To
Length
(Feet)
Area
(Square Feet)
Type of Work
Adobe Creek Lodge
Road
Moody Rd.
End
560
-
14,407
Microsurfacing
Alejandro Drive
St Francis Rd.
End (south)
393
9,174
Microsurfacing
Arroyo Oaks Drive
Ravensbury Ave.
End
565
12,92.2
Microsurfacing
Beatrice Lane
Robleda Rd.-
End (CDS)
245
10,1000
Microsurfacing
Berry Hill Court
Page Mill Rd.
End
547
.9,542
Microsurfacing
Berry Hill Lane
Berry Hill Ct.
End
745
.16,055
Microsurfacing
Black Mountain
Road
N/A
/
N A
/
0
0
6" digouts, 4" A.C.
" ,
dike 6A�C. dike
2' valley gutter
Canario Way
Viscaino Rd.
End
950
24,484
Microsurfacing
Carrillo Lane
La Cresta Dr.
End
450
13,944
Microsurfacing
Conejo Court
Ascension Dr.
End
310,
10,444
Microsurfacing
Dawn Lane
Elena Rd.
End
380
9,300
2" Overlay
Donelson Place
Fremont Rd.
End
630
16,826
Microsurfacing
Eshner Court
Altamont Rd.
End
381
10,974
Microsurfacing
Fawn Creek Court
Page Mill Rd.
End
695
16,452
Microsurfacing
Frampton Court
Magdalena Rd.
End
240
10,725
Microsurfacing
Francemont
Avenue
Moody Rd.
End
425
11,175
Microsurfacing
Fremont Road
N/A
N/A
0
0
6" digouts
Gigli Court
Elena Rd.
End
430
11,563
Microsurfacing
Green Hills Court
Elena Rd.
End
540
12,820
Microsurfacing
Hilltop Drive
N/A
N/A
0
0
6" digouts
Horseshoe Lane
Arastradero Rd.
End
828
20,300
Microsurfacing -
La Barranca Road
Purissima Rd.
Elena Rd.
2,080
51,582
Microsurfacing
La Cresta Drive
Arastradero Rd.;
Viscaino Rd.
900' S. Nina PI.;
End
41370
95,025
Microsurfacing
La Paloma Road
Newbridge Dr.
Alta Tierra Rd.
2,060
50,262
Microsurfacing
Laurel Lane
Concepcion Rd.
End (CDS)
222
6,000
Microsurfacing
La Vida Real
Natoma Rd.
End
600
12,140
Microsurfacing
Liddicoat Circle
Liddicoat Dr.
Liddicoat Dr.
21320
49,554
Microsurfacing
Magdalena Road
N/A
N/A
21860
65,780
Microsurfacing
Manuella Road
N/A
N/A
0
0
6" Digouts
Street
From
To
Length
(Feet)
Area
(Square Feet)
-Type of Work
Resolution 47-23 Page 4