Loading...
HomeMy WebLinkAboutKPA Group AgreementCONSULTING SERVICES AGREEMENT BETWEEN THE TOWN OF LOS ALTOS HILLS AND THE KPA GROUP THIS AGREEMENT for consulting services is made by and between the Town of Los Altos Hills ("Town") and The KPA Group ("Consultant") (together sometimes referred to as the "Parties") as of December 14, 2023 (the "Effective Date"). Section 1. SERVICES. Subject to the terms and conditions set forth in this Agreement, Consultant shall provide to Town the services described in the Scope of Work attached as Exhibit A at the time and place and in the manner specified therein. In the event of a conflict in or inconsistency between the terms of this Agreement and Exhibit A, the Agreement shall prevail. 1.1 Term of Services. The term of this Agreement shall begin on the Effective Date and shall end on June 30, 2025, and Consultant shall complete the work described in Exhibit A on or before that date, unless the term of the Agreement is otherwise terminated or extended, as provided for in Section 8. The time provided to Consultant to complete the services required by this Agreement shall not affect the Town's right to terminate the Agreement, as referenced in Section 8. 1.2 Standard of Performance. Consultant shall perform all services required pursuant to this Agreement in the manner and according to the standards observed by a competent practitioner of the profession in which Consultant is engaged. 1.3 Assignment of Personnel. Consultant shall assign only competent personnel to perform services pursuant to this Agreement. In the event that Town, in its sole discretion, at any time during the term of this Agreement, desires the reassignment of any such persons, Consultant shall, immediately upon receiving notice from Town of such desire of Town, reassign such person or persons. 1.4 Time. Consultant shall devote such time to the performance of services pursuant to this Agreement as may be reasonably necessary to meet the standard of performance provided in Section 1.1 above and to satisfy Consultant's obligations hereunder. Section 2. COMPENSATION. Town hereby agrees to pay Consultant a sum not to exceed One Hundred Thousand Dollars ($100,000.00), notwithstanding any contrary indications that may be contained in Consultant's proposal, for services to be performed and reimbursable costs incurred under this Agreement. In the event of a conflict between this Agreement and Consultant's proposal, attached as Exhibit A, regarding the amount of compensation, the Agreement shall prevail. Town shall pay Consultant for services rendered pursuant to this Agreement at the time and in the manner set forth herein. The payments specified below shall be the only payments from Town to Consultant for services rendered pursuant to this Agreement. Consultant shall submit all invoices to Town in the manner specified herein. Except as specifically authorized by Town in writing, Consultant shall not bill Town for duplicate services performed by more than one person. Consulting Services Agreement between December 14, 2023 Town of Los Altos Hills and The KPA Group Page 1 of 13 Consultant and Town acknowledge and agree that compensation paid by Town to Consultant under this Agreement is based upon Consultant's estimated costs of providing the services required hereunder, including salaries and benefits of employees and subcontractors of Consultant. Consequently, the parties further agree that compensation hereunder is intended to include the costs of contributions to any pensions and/or annuities to which Consultant and its employees, agents, and subcontractors may be eligible. Town therefore has no responsibility for such contributions beyond compensation required under this Agreement. 2.1 Invoices. Consultant shall submit invoices, not more often than once a month during the term of this Agreement, based on the cost for services performed and reimbursable costs incurred prior to the invoice date. Invoices shall contain the following information: ■ Serial identifications of progress bills; i.e., Progress Bill No. 1 for the first invoice, etc.; ■ The beginning and ending dates of the billing period; ■ A Task Summary containing the original contract amount, the amount of prior billings, the total due this period, the balance available under the Agreement, and the percentage of completion; ® At Town's option, for each work item in each task, a copy of the applicable time entries or time sheets shall be submitted showing the name of the person doing the work, the hours spent by each person, a brief description of the work, and each reimbursable expense; ■ The total number of hours of work performed under the Agreement by Consultant and each employee, agent, and subcontractor of Consultant performing services hereunder; ■ The Consultant's signature; ■ Consultant shall give separate notice to the Town when the total number of hours worked by Consultant and any individual employee, agent, or subcontractor of Consultant reaches or exceeds 800 hours within a 12 -month period under this Agreement and any other agreement between Consultant and Town. Such notice shall include an estimate of the time necessary to complete work described in Exhibit A and the estimate of time necessary to complete work under any other agreement between Consultant and Town, if applicable. 2.2 Monthly Payment. Town shall make monthly payments, based on invoices received, for services satisfactorily performed, and for authorized reimbursable costs incurred. Town shall have 30 days from the receipt of an invoice that complies with all of the requirements above to pay Consultant. 2.3 Final Payment. Town shall pay the last 10% of the total sum due pursuant to this Agreement within 60 days after completion of the services and submittal to Town of a final invoice, if all services required have been satisfactorily performed. 2.4 Total Payment. Town shall pay for the services to be rendered by Consultant pursuant to this Agreement. Town shall not pay any additional sum for any expense or cost whatsoever incurred by Consultant in rendering services pursuant to this Agreement. Consulting Services Agreement between December 14, 2023 Town of Los Altos Hills and The KPA Group Page 2 of 13 Town shall make no payment for any extra, further, or additional service pursuant to this Agreement. In no event shall Consultant submit any invoice for an amount in excess of the maximum amount of compensation provided above either for a task or for the entire Agreement, unless the Agreement is modified prior to the submission of such an invoice by a properly executed change order or amendment. 2.5 Hourly Fees. Fees for work performed by Consultant on an hourly basis shall not exceed the amounts shown on the compensation schedule attached hereto as Exhibit A. 2.6 Reimbursable Expenses. Reimbursable expenses are specified below, and shall not exceed $ . Expenses not listed below are not chargeable to Town. Reimbursable expenses are included in the total amount of compensation provided under this Agreement that shall not be exceeded. 2.7 Payment of Taxes. Consultant is solely responsible for the payment of employment taxes incurred under this Agreement and any similar federal or state taxes. 2.8 Payment upon Termination. In the event that the Town or Consultant terminates this Agreement pursuant to Section 8, the Town shall compensate the Consultant for all outstanding costs and reimbursable expenses incurred for work satisfactorily completed as of the date of written notice of termination. Consultant shall maintain adequate logs and timesheets to verify costs incurred to that date. 2.9 Authorization to Perform Services. The Consultant is not authorized to perform any services or incur any costs whatsoever under the terms of this Agreement until receipt of authorization from the Contract Administrator. Section 3. FACILITIES AND EQUIPMENT. Except as set forth herein, Consultant shall, at its sole cost and expense, provide all facilities and equipment that may be necessary to perform the services required by this Agreement. Section 4. INSURANCE REQUIREMENTS. Before beginning any work under this Agreement, Consultant, at its own cost and expense, unless otherwise specified below, shall procure the types and amounts of insurance listed below against claims for injuries to persons or damages to property that may arise from or in connection with the performance of the work hereunder by the Consultant and its agents, representatives, employees, and subcontractors. Consistent with the following provisions, Consultant shall provide proof satisfactory to Town of such insurance that meets the requirements of this section and under forms of insurance satisfactory in all respects, and that such insurance is in effect prior to beginning work to the Town. Consultant shall maintain the insurance policies required by this section throughout the term of this Agreement. The cost of such insurance shall be included in the Consultant's bid. Consultant shall not allow any subcontractor to commence work on any subcontract until Consultant has obtained all insurance required herein for the subcontractor(s) and provided evidence that such insurance is in effect to Town. Verification of the required insurance shall be submitted and made part of this Agreement prior to execution. Consultant shall maintain all required insurance listed herein for the duration of this Agreement. Consulting Services Agreement between December 14, 2023 Town of Los Altos Hills and The KPA Group Page 3 of 13 4.1 Workers' Compensation. Consultant shall, at its sole cost and expense, maintain Statutory Workers' Compensation Insurance and Employer's Liability Insurance for any and all persons employed directly or indirectly by Consultant. The Statutory Workers' Compensation Insurance and Employer's Liability Insurance shall be provided with limits of not less than $1,000,000 per accident. In the alternative, Consultant may rely on a self- insurance program to meet those requirements, but only if the program of self-insurance complies fully with the provisions of the California Labor Code. Determination of whether a self-insurance program meets the standards of the Labor Code shall be solely in the discretion of the Contract Administrator. The insurer, if insurance is provided, or the Consultant, if a program of self-insurance is provided, shall waive all rights of subrogation against the Town and its officers, officials, employees, and volunteers for loss arising from work performed under this Agreement. 4.2 Commercial General and Automobile Liability Insurance. 4.2.1 General requirements. Consultant, at its own cost and expense, shall maintain commercial general and automobile liability insurance for the term of this Agreement in an amount not less than $1,000,000 per occurrence, combined single limit coverage for risks associated with the work contemplated by this Agreement. If a Commercial General Liability Insurance or an Automobile Liability form or other form with a general aggregate limit is used, either the general aggregate limit shall apply separately to the work to be performed under this Agreement or the general aggregate limit shall be at least twice the required occurrence limit. Such coverage shall include but shall not be limited to, protection against claims arising from bodily and personal injury, including death resulting therefrom, and damage to property resulting from activities contemplated under this Agreement, including the use of owned and non -owned automobiles. 4.2.2 Minimum scope of coverage. Commercial general coverage shall be at least as broad as Insurance Services Office Commercial General Liability occurrence form CG 0001 (most recent edition) covering comprehensive General Liability on an "occurrence" basis. Automobile coverage shall be at least as broad as Insurance Services Office Automobile Liability form CA 0001, Code 1 (any auto). No endorsement shall be attached limiting the coverage. 4.2.3 Additional requirements. Each of the following shall be included in the insurance coverage or added as a certified endorsement to the policy. a. The Insurance shall cover on an occurrence or an accident basis, and not on a claims -made basis. b. Town, its officers, officials, employees, and volunteers are to be covered as insureds as respects: liability arising out of work or operations performed by or on behalf of the Consultant; or automobiles owned, leased, hired, or borrowed by the Consultant Consulting Services Agreement between December 14, 2023 Town of Los Altos Hills and The KPA Group Page 4 of 13 C. For any claims related to this Agreement or the work hereunder, the Consultant's insurance covered shall be primary insurance as respects the Town, its officers, officials, employees, and volunteers. Any insurance or self-insurance maintained by the Town, its officers, officials, employees, or volunteers shall be excess of the Consultant's insurance and shall not contribute with it. Each insurance policy required by this clause shall be endorsed to state that coverage shall not be canceled by either party, except after 30 days' prior written notice has been provided to the Town. 4.3 Professional Liability Insurance. 4.3.1 General requirements. Consultant, at its own cost and expense, shall maintain for the period covered by this Agreement professional liability insurance for licensed professionals performing work pursuant to this Agreement in an amount not less than $1,000,000 covering the licensed professionals' errors and omissions. Any deductible or self-insured retention shall not exceed $150,000 per claim. 4.3.2 Claims -made limitations. The following provisions shall apply if the professional liability coverage is written on a claims -made form: The retroactive date of the policy must be shown and must be before the date of the Agreement. Insurance must be maintained and evidence of insurance must be provided for at least five years after completion of the Agreement or the work, so long as commercially available at reasonable rates. C. If coverage is canceled or not renewed and it is not replaced with another claims -made policy form with a retroactive date that precedes the date of this Agreement, Consultant shall purchase an extended period coverage for a minimum of five years after completion of work under this Agreement. d. A copy of the claim reporting requirements must be submitted to the Town for review prior to the commencement of any work under this Agreement. 4.3.3 Additional Requirements. A certified endorsement to include contractual liability shall be included in the policy. 4.4 All Policies Requirements. Consulting Services Agreement between December 14, 2023 Town of Los Altos Hills and The KPA Group Page 5 of 13 4.4.1 Acceptability of insurers. All insurance required by this section is to be placed with insurers with a Bests' rating of no less than A:VII. 4.4.2 Verification of coverage. Prior to beginning any work under this Agreement, Consultant shall furnish Town with complete copies of all policies delivered to Consultant by the insurer, including complete copies of all endorsements attached to those policies. All copies of policies and certified endorsements shall show the signature of a person authorized by that insurer to bind coverage on its behalf. If the Town does not receive the required insurance documents prior to the Consultant beginning work, it shall not waive the Consultant's obligation to provide them. The Town reserves the right to require complete copies of all required insurance policies at any time. 4.4.3 Deductibles and Self -Insured Retentions. Consultant shall disclose to and obtain the written approval of Town for the self-insured retentions and deductibles before beginning any of the services or work called for by any term of this Agreement. At the option of the Town, either: the insurer shall reduce or eliminate such deductibles or self-insured retentions as respects the Town, its officers, employees, and volunteers; or the Consultant shall provide a financial guarantee satisfactory to the Town guaranteeing payment of losses and related investigations, claim administration and defense expenses. 4.4.4 Wasting Policies. No policy required by this Section 4 shall include a "wasting" policy limit (i.e. limit that is eroded by the cost of defense). 4.4.5 Waiver of Subrogation. Consultant hereby agrees to waive subrogation which any insurer or contractor may require from vendor by virtue of the payment of any loss. Consultant agrees to obtain any endorsements that may be necessary to affect this waiver of subrogation. The Workers' Compensation policy shall be endorsed with a waiver of subrogation in favor of the entity for all work performed by the consultant, its employees, agents, and subcontractors. 4.4.6 Subcontractors. Consultant shall include all subcontractors as insureds under its policies or shall furnish separate certificates and certified endorsements for each subcontractor. All coverages for subcontractors shall be subject to all of the requirements stated herein. 4.5 Remedies. In addition to any other remedies Town may have if Consultant fails to provide or maintain any insurance policies or policy endorsements to the extent and within the time herein required, Town may, at its sole option exercise any of the following remedies, which are alternatives to other remedies Town may have and are not the exclusive remedy for Consultant's breach: Consulting Services Agreement between December 14, 2023 Town of Los Altos Hills and The KPA Group Page 6 of 13 ■ Obtain such insurance and deduct and retain the amount of the premiums for such insurance from any sums due under the Agreement; ■ Order Consultant to stop work under this Agreement or withhold any payment that becomes due to Consultant hereunder, or both stop work and withhold any payment, until Consultant demonstrates compliance with the requirements hereof; and/or ■ Terminate this Agreement. Section 5. INDEMNIFICATION AND CONSULTANT'S RESPONSIBILITIES. Consultant shall, to the fullest extent allowed by law, with respect to all Services performed in connection with this Agreement, defend with counsel acceptable to Town, indemnify, and hold Town, its officers, employees, agents, and volunteers, harmless from and against any and all claims that arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of the Consultant, ("Claims"). Consultant will bear all losses, costs, damages, expense and liability of every kind, nature and description that arise out of, pertain to, or relate to such Claims, whether directly or indirectly ("Liability"). Such obligations to defend, hold harmless and indemnify the Town shall not apply to the extent that such Liabilities are caused by the sole negligence, active negligence, or willful misconduct of the Town. With respect to third party claims against the Consultant, the Consultant waives any and all rights of any type of express or implied indemnity against the Indemnitees. Notwithstanding the forgoing, to the extent this Agreement is a "construction contract" as defined by California Civil Code section 2783, as may be amended from time to time, such duties of Consultant to indemnify shall not apply when to do so would be prohibited by California Civil Code Section 2782. Section 6. STATUS OF CONSULTANT. 6.1 Independent Contractor. At all times during the term of this Agreement, Consultant shall be an independent contractor and shall not be an employee of Town. Town shall have the right to control Consultant only insofar as the results of Consultant's services rendered pursuant to this Agreement and assignment of personnel pursuant to Subparagraph 1.3; however, otherwise Town shall not have the right to control the means by which Consultant accomplishes services rendered pursuant to this Agreement. Notwithstanding any other Town, state, or federal policy, rule, regulation, law, or ordinance to the contrary, Consultant and any of its employees, agents, and subcontractors providing services under this Agreement shall not qualify for or become entitled to, and he agree to waive any and all claims to, any compensation, benefit, or any incident of employment by Town, including but not limited to eligibility to enroll in the California Public Employees Retirement System (PERS) as an employee of Town and entitlement to any contribution to be paid by Town for employer contributions and/or employee contributions for PERS benefits. 6.2 Consultant Not an Agent. Except as Town may specify in writing, Consultant shall have no authority, express or implied, to act on behalf of Town in any capacity whatsoever as an agent. Consultant shall have no authority, express or implied, pursuant to this Agreement to bind Town to any obligation whatsoever. Consulting Services Agreement between December 14, 2023 Town of Los Altos Hills and The KPA Group Page 7 of 13 Section 7. LEGAL REQUIREMENTS. 7.1 Governing Law. The laws of the State of California shall govern this Agreement. 7.2 Compliance with Applicable Laws. Consultant and any subcontractors shall comply with all laws and regulations applicable to the performance of the work hereunder, including but not limited to, the California Building Code, the Americans with Disabilities Act, and any copyright, patent or trademark law. Consultant's Failure to comply with any law(s) or regulation(s) applicable to the performance of the work hereunder shall constitute a breach of contract. 7.3 Other Governmental Regulations. To the extent that this Agreement may be funded by fiscal assistance from another governmental entity, Consultant and any subcontractors shall comply with all applicable rules and regulations to which Town is bound by the terms of such fiscal assistance program. 7.4 Licenses and Permits. Consultant represents and warrants to Town that Consultant and its employees, agents, and any subcontractors have all licenses, permits, qualifications, and approvals of whatsoever nature that are legally required to practice their respective professions. Consultant represents and warrants to Town that Consultant and its employees, agents, any subcontractors shall, at their sole cost and expense, keep in effect at all times during the term of this Agreement any licenses, permits, and approvals that are legally required to practice their respective professions. In addition to the foregoing, Consultant and any subcontractors shall obtain and maintain during the term of this Agreement valid Business Licenses from Town. 7.5 Nondiscrimination and Equal Opportunity. Consultant shall not discriminate, on the basis of a person's race, religion, color, national origin, age, physical or mental handicap or disability, medical condition, marital status, sex, or sexual orientation, against any employee, applicant for employment, subcontractor, bidder for a subcontract, or participant in, recipient of, or applicant for any services or programs provided by Consultant under this Agreement. Consultant shall comply with all applicable federal, state, and local laws, policies, rules, and requirements related to equal opportunity and nondiscrimination in employment, contracting, and the provision of any services that are the subject of this Agreement, including but not limited to the satisfaction of any positive obligations required of Consultant thereby. Consultant shall include the provisions of this Subsection in any subcontract approved by the Contract Administrator or this Agreement. Section 8. TERMINATION AND MODIFICATION. 8.1 Termination. Town may cancel this Agreement at any time and without cause upon written notification to Consultant. Consulting Services Agreement between December 14, 2023 Town of Los Altos Hills and The KPA Group Page 8 of 13 Consultant may cancel this Agreement upon thirty (30) days' written notice to Town and shall include in such notice the reasons for cancellation. In the event of termination, Consultant shall be entitled to compensation for services performed to the effective date of termination; Town, however, may condition payment of such compensation upon Consultant delivering to Town any or all documents, photographs, computer software, video and audio tapes, and other materials provided to Consultant or prepared by or for Consultant or the Town in connection with this Agreement. 8.2 Extension. Town may, in its sole and exclusive discretion, extend the end date of this Agreement beyond that provided for in Subsection 1.1. Any such extension shall require a written amendment to this Agreement, as provided for herein. Consultant understands and agrees that, if Town grants such an extension, Town shall have no obligation to provide Consultant with compensation beyond the maximum amount provided for in this Agreement. Similarly, unless authorized by the Contract Administrator, Town shall have no obligation to reimburse Consultant for any otherwise reimbursable expenses incurred during the extension period. 8.3 Amendments. The parties may amend this Agreement only by a writing signed by all the parties. 8.4 Assignment and Subcontracting Town and Consultant recognize and agree that this Agreement contemplates personal performance by Consultant and is based upon a determination of Consultant's unique personal competence, experience, and specialized personal knowledge. Moreover, a substantial inducement to Town for entering into this Agreement was and is the professional reputation and competence of Consultant. Consultant may not assign this Agreement or any interest therein without the prior written approval of the Contract Administrator. Consultant shall not subcontract any portion of the performance contemplated and provided for herein, other than to the subcontractors noted in the proposal, without prior written approval of the Contract Administrator. 8.5 Survival. All obligations arising prior to the termination of this Agreement and all provisions of this Agreement allocating liability between Town and Consultant shall survive the termination of this Agreement. 8.6 Options upon Breach by Consultant. If Consultant materially breaches any of the terms of this Agreement, Town's remedies shall include, but not be limited to, the following: 8.6.1 Immediately terminate the Agreement; 8.6.2 Retain the plans, specifications, drawings, reports, design documents, and any other work product prepared by Consultant pursuant to this Agreement; 8.6.3 Retain a different consultant to complete the work described in Exhibit A not finished by Consultant; or Consulting Services Agreement between December 14, 2023 Town of Los Altos Hills and The KPA Group Page 9 of 13 CONSULTING SERVICES AGREEMENT BETWEEN THE TOWN OF LOS ALTOS HILLS AND THE KPA GROUP THIS AGREEMENT for consulting services is made by and between the Town of Los Altos Hills ("Town") and The KPA Group ("Consultant") (together sometimes referred to as the "Parties") as of December 14, 2023 (the "Effective Date"). Section 1. SERVICES. Subject to the terms and conditions set forth in this Agreement, Consultant shall provide to Town the services described in the Scope of Work attached as Exhibit A at the time and place and in the manner specified therein. In the event of a conflict in or inconsistency between the terms of this Agreement and Exhibit A, the Agreement shall prevail. 1.1 Term of Services. The term of this Agreement shall begin on the Effective Date and shall end on June 30, 2025, and Consultant shall complete the work described in Exhibit A on or before that date, unless the term of the Agreement is otherwise terminated or extended, as provided for in Section 8. The time provided to Consultant to complete the services required by this Agreement shall not affect the Town's right to terminate the Agreement, as referenced in Section 8, 1.2 Standard of Performance. Consultant shall perform all services required pursuant to this Agreement in the manner and according to the standards observed by a competent practitioner of the profession in which Consultant is engaged. 1.3 Assignment of Personnel. Consultant shall assign only competent personnel to perform services pursuant to this Agreement. In the event that Town, in its sole discretion, at any time during the term of this Agreement, desires the reassignment of any such persons, Consultant shall, immediately upon receiving notice from Town of such desire of Town, reassign such person or persons. 1.4 Time. Consultant shall devote such time to the performance of services pursuant to this Agreement as may be reasonably necessary to meet the standard of performance provided in Section 1.1 above and to satisfy Consultant's obligations hereunder. Section 2. COMPENSATION. Town hereby agrees to pay Consultant a sum not to exceed One Hundred Thousand Dollars ($100,000.00), notwithstanding any contrary indications that may be contained in Consultant's proposal, for services to be performed and reimbursable costs incurred under this Agreement. In the event of a conflict between this Agreement and Consultant's proposal, attached as Exhibit A, regarding the amount of compensation, the Agreement shall prevail. Town shall pay Consultant for services rendered pursuant to this Agreement at the time and in the manner set forth herein. The payments specified below shall be the only payments from Town to Consultant for services rendered pursuant to this Agreement. Consultant shall submit all invoices to Town in the manner specified herein. Except as specifically authorized by Town in writing, Consultant shall not bill Town for duplicate services performed by more than one person. Consulting Services Agreement between December 14, 2023 Town of Los Altos Hills and The KPA Group Page 1 of 13 8.6.4 Charge Consultant the difference between the cost to complete the work described in Exhibit A that is unfinished at the time of breach and the amount that Town would have paid Consultant pursuant to Section 2 if Consultant had completed the work. Section 9. KEEPING AND STATUS OF RECORDS. 9.1 Records Created as Part of Consultant's Performance. All reports, data, maps, models, charts, studies, surveys, photographs, memoranda, plans, studies, specifications, records, files, or any other documents or materials, in electronic or any other form, that Consultant prepares or obtains pursuant to this Agreement and that relate to the matters covered hereunder shall be the property of the Town. Consultant hereby agrees to deliver those documents to the Town upon termination of the Agreement. It is understood and agreed that the documents and other materials, including but not limited to those described above, prepared pursuant to this Agreement are prepared specifically for the Town and are not necessarily suitable for any future or other use. Town and Consultant agree that, until final approval by Town, all data, plans, specifications, reports and other documents are confidential and will not be released to third parties without prior written consent of both parties. 9.2 Consultant's Books and Records. Consultant shall maintain any and all ledgers, books of account, invoices, vouchers, canceled checks, and other records or documents evidencing or relating to charges for services or expenditures and disbursements charged to the Town under this Agreement for a minimum of 3 years, or for any longer period required by law, from the date of final payment to the Consultant to this Agreement. 9.3 Inspection and Audit of Records Any records or documents that Section 9.2 of this Agreement requires Consultant to maintain shall be made available for inspection, audit, and/or copying at any time during regular business hours, upon oral or written request of the Town. Under California Government Code Section 8546.7, if the amount of public funds expended under this Agreement exceeds $10,000.00, the Agreement shall be subject to the examination and audit of the State Auditor, at the request of Town or as part of any audit of the Town, for a period of 3 years after final payment under the Agreement. Section 10 MISCELLANEOUS PROVISIONS. 10.1 Attorneys' Fees. If a party to this Agreement brings any action, including an action for declaratory relief, to enforce or interpret the provision of this Agreement, the prevailing party shall be entitled to reasonable attorneys' fees in addition to any other relief to which that party may be entitled. The court may set such fees in the same action or in a separate action brought for that purpose. 10.2 Venue. In the event that either party brings any action against the other under this Agreement, the parties agree that trial of such action shall be vested exclusively in the uonsuiting Services Agreement between December 14, 2023 Town of Los Altos Hills and The KPA Group Page 10 of 13 state courts of California in the County of Santa Clara or in the United States District Court for the Northern District of California. 10.3 Severability. If a court of competent jurisdiction finds or rules that any provision of this Agreement is invalid, void, or unenforceable, the provisions of this Agreement not so adjudged shall remain in full force and effect. The invalidity in whole or in part of any provision of this Agreement shall not void or affect the validity of any other provision of this Agreement. 10.4 No Implied Waiver of Breach. The waiver of any breach of a specific provision of this Agreement does not constitute a waiver of any other breach of that term or any other term of this Agreement. 10.5 Successors and Assigns. The provisions of this Agreement shall inure to the benefit of and shall apply to and bind the successors and assigns of the parties. 10.6 Use of Recycled Products. Consultant shall prepare and submit all reports, written studies and other printed material on recycled paper to the extent it is available at equal or less cost than virgin paper. 10.7 Conflict of Interest. Consultant may serve other clients, but none whose activities within the corporate limits of Town or whose business, regardless of location, would place Consultant in a "conflict of interest," as that term is defined in the Political Reform Act, codified at California Government Code Section 81000 et seq. Consultant shall not employ any Town official in the work performed pursuant to this Agreement. No officer or employee of Town shall have any financial interest in this Agreement that would violate California Government Code Sections 1090 et seq. Consultant hereby warrants that it is not now, nor has it been in the previous 12 months, an employee, agent, appointee, or official of the Town. If Consultant was an employee, agent, appointee, or official of the Town in the previous twelve months, Consultant warrants that it did not participate in any manner in the forming of this Agreement. Consultant understands that, if this Agreement is made in violation of Government Code §1090 et seq., the entire Agreement is void and Consultant will not be entitled to any compensation for services performed pursuant to this Agreement, including reimbursement of expenses, and Consultant will be required to reimburse the Town for any sums paid to the Consultant. Consultant understands that, in addition to the foregoing, it may be subject to criminal prosecution for a violation of Government Code § 1090 and, if applicable, will be disqualified from holding public office in the State of California. 10.8 Solicitation. Consultant agrees not to solicit business at any meeting, focus group, or interview related to this Agreement, either orally or through any written materials. 10.9 Contract Administration. This Agreement shall be administered by WooJae Kim, Public Works Director ("Contract Administrator"). All correspondence, communications and Consulting Services Agreement between December 14, 2023 Town of Los Altos Hills and The KPA Group Page 11 of 13 meetings shall be directed to or through the Contract Administrator or his or her designee. The Consultant shall only take direction regarding the services provided under this Agreement from the Contract Administrator. Furthermore, Consultant agrees that the Contract Administrator shall be included any meeting, teleconference or written communication between any Town representative including Committee members and the Consultant. The Town may modify the Contract Administrator at any time upon providing written notice to the Consultant. 10.10 Notices. Any written notice to Consultant shall be sent to: Paul W. Powers, President 6700 Koll Center Parkway, Suite 125 Pleasanton, CA 94566 Any written notice to Town shall be sent to: WooJae Kim, Public Works Director Town of Los Altos Hills 26379 Fremont Road Los Altos Hills, CA 94022 10.11 Professional Seal. Where applicable in the determination of the contract administrator, the first page of a technical report, first page of design specifications, and each page of construction drawings shall be stamped/sealed and signed by the licensed professional responsible for the report/design preparation. The stamp/seal shall be in a block entitled "Seal and Signature of Registered Professional with report/design responsibility," as in the following example. Seal and Signature of Registered Professional with report/design responsibility. 10.12 Integration. This Agreement, including the scope of work attached hereto and incorporated herein as Exhibits A, represents the entire and integrated agreement between Town and Consultant and supersedes all prior negotiations, representations, or agreements, either written or oral. Exhibit A Scope of Services 10.13 Counterparts. This Agreement may be executed in multiple counterparts, each of which shall be an original and all of which together shall constitute one agreement. [SIGNATURES ON FOLLOWING PAGE] Consulting Services Agreement between December 14, 2023 Town of Los Altos Hills and The KPA Group Page 12 of 13 The Parties have executed this Agreement as of the Effective Date. TOW F OS OS HILLS CONSULTANT Peter Pirnejad, n Manager Padw, Powers,' President Attest: Approved as to Form: j.4 oy-- Steven T. Mattas, Town Attorney 1071914,1 Consulting Services Agreement between December 14, 2023 Town of Los Altos Hills and The KPA Group Page 13 of 13 EXHIBIT A SCOPE OF SERVICES uonsuitmg Services Agreement between December 14, 2023 Town of Los Altos Hills and The KPA Group --Exhibit A Page 1 of 1 LOS ALTOS HILLS CALIFORNIA REQUEST FOR PROPOSAL FOR TOWN OF LOS ALTOS HILLS HERITAGE HOUSE UPGRADE Cover Letter 1. Introduction and Approach 2. Qualifications covER LETTER 0 TNY; K PA raom, ENGINEERS ARCHITECTS October 24, 2023 Melissa Elian-Carrillo, Assistant Engineer Town of Los Altos Hills 26379 Fremont Road Los Altos Hills, CA 94022 Subject: Request for Proposal - Heritage House Upgrade Professional Design Services Dear Ms. Elian-Carrillo: The KPA Group is proud to present our professional qualifications for dependable architectural and engineering design services for the Heritage House Upgrade in the Town of Los Altos Hills. KPA is a full-service architectural firm with over 36 years of experience and is located nearby in Pleasanton. We are currently working on projects in the neighboring cities of Menlo Park, San Mateo and the Town of Los Gatos and it would be our pleasure to partner with the Town of Los Altos Hills for improvements at the Heritage House. KPA understands the importance of the Heritage House Upgrade project as this will bring new collaborative focus to the Los Altos Hills community and operations. Our project experience is broad, and our skill set includes new construction, building modernizations, renovations, re -purposing and retrofits, HVAC and ADA upgrade improvements and cost estimating. We are familiar with the scope of services required by the Town to complete this project and will strive to provide environmentally friendly solutions that is considerate to existing constraints and opportunities. KPA has worked to provide design and planning services for multiple historic facilities in the Bay Area. Most recently, we have worked with the Town of Ross for planning and construction considerations related to their historic 1927 Town Hall facility. Los Altos Hills requires a knowledgeable professional team to manage and coordinate architectural and engineering design of the Heritage House Upgrade and to advise and assist officials, stakeholders and public committee members to make informed decisions. The KPA Group will work closely with all parties to address sensitive historic considerations pertaining to the Heritage House, develop sound solutions to achieve site and building accessibility compliance and to help maintain project goals and intent. Our team fully comprehends and is successful in balancing the complexities of aesthetics and functionality with budget in mind. We are highly skilled in supporting all phases of design, the preparation of contract documents and specifications, permit approvals and public bid assistance, and construction administration support. We are happy to host and prepare discussion and presentation materials for committee meetings. The KPA Group is excited to submit our proposal and qualifications and are confident in our ability to deliver responsive and personalized services to upgrade the Heritage House. We encourage you to check our references and gauge our interest in your exciting work. KPA looks forward to the opportunity to develop our professional relationship with your special Town and improve the Heritage House for current and future generations. Sincerely, J Paul W. P wets, NCARB Presiden (925) 87 0244 paulp@thekpagroup.com 6700 Koll Center Parkway, Suite 125 Pleasanton, CA 94566 6700 KOLL CENTER PKWY #125, PLEASANTON, CA 94566 PHONE: (925) 872-0244 WWW.THEKPAGROUP.COM 1. INTRODUCTION & APPROACH 0 the KPA Group was FOUNDED The KPA Group Rant' u^don 6700 Koll Center Pkwy, Suite 125 ° ARCHITECTURE Pleasanton, CA 94566 SERVICES(925) 223-8217 ext. 220 TRANSAMERKA = ° ° wereaddad. nrr: KPA auour www.thekpagroup.com PYRAMID " a 'NTE AVIATION^+ SERVICES ,� ^. ,, EDERAL Summary Description of Firm weraadded. ° a ° FFICE UILDING The KPA Group is a certified Small Business Enterprise (SBE) W MARTIN LUTHER KING California Corporation centrally located in Pleasanton, CA. The BROADiNAY s JR.PLAZA firm offers fully integrated Engineering, Architecture, Planning ^ BUILDING i+ ® I. Callforola Preservation FondationAward and Project Management services to both public and private THE ROUTUNDA / '��� sectors. Our commitment to personal service throughout the BUILDING I ,�` .: PSYCHOLOGY project delivery process has established KPA as a strong and (alifontia Nosemailou FaundattanAward : _-_-__,! aDING reliable partner for architectural and engineering services, TOP 10"BEST FIRMS facility improvements, site alternations, feasibility analyses, oAKLANE TOWORKFOR" cost estimating and other related services. RITLAI I Structural Engineering Magazine Areas of Services ALAMEDA COUNTY JUVENILE N'S MARKET The KPA Group Is driven b passion for design and expertise in p Y p g p JUSTICE CENTER First IIS Detention Center' technical services such as: toarfiieve LEEbGald ' '� • Architectural design (schematic design to construction DAi.71ELBUi1. ! ! SFO SECURE PASSENGER documentation) =1 I ® CONNECTOR BUILDING Accessibility (ADA) compliance assessments First beslgn/Buildproject . ADA transition planning CONTRA COSTA COUNTY HUMAN SERVICES a®n r' ' XTHEAIER Building systems engineering RENOVATION i ® Code analysis & application Dat Award oFrUallente first county basign/Build - - Communitymaster planning • p g COLLEGETERRACE Construction administration RKHPE CIVIC CEP LIBRARY Palo Alto Stanford Heritage Cost estimating ' g RenovationAward Environmental analysis and CEQA support 30&40MUIRRD' ' _ _- Facility assessments and management MODERNIZATION First tauntptEEbGatdCertlBtallan INT'ORT L AIRPORT AIRV Facility master planning & CIP • Field investigation & mapping r ` Field topography surveys Ir VECERANSAFFAla." BOARDING International Partnership Historic preservation design Institute Ruby Awa rd • Permitting & bidding support EAST COUNTY HALL ' • Procurement requirements OFJUSTICE ° Public engagement ALL ICE • Renovation & rehabilitation design 0 BERTMOONEY • Seismic retrofit assessment & design TERMINAL • Space planning, programming and conceptual plans BERT / PF T'R it FL AW-MontanaTraspartation RonorAwaid . Sustainability/LEED study and design • Structural engineering ARCATA/EUREKA ARFF BUILDING ° • Urban design & planning FKA Timeline ARFF BUILDING Founded in 1987, The KPA Group is proudly celebrating 36 CONTRA COSTA COUNTY Years of architectural engineering and design. KPA provides CT TERMINAL/ARFF innovative solutions and enjoys repeat business from a variety of public clients. PROFESSIONAL DESIGN SERVICES TOWN OF LOS ALTOS HILLS, CA ITHE KPA GROUP VALUE POSITION The KPA Group team brings to the Town of Los Altos Hills a team of highly skilled, knowledgeable, enthusiastic and committed experts that will collaborate with the Town's officials stakeholders and public committees to assess, explore, develop, design, and deliver functional and effective projects. Fundamental to our approach is true commitment to collaboration and team diversity. We establish and nurture a dynamic partnership based on trust, effective communication, transparency, and a shared interest in delivering exceptional building and architectural work. 1. INTRODUCTION & APPROACH Architecture Services begin with a thorough understanding of the Town's intent, objectives and relative budget. KPA will listen to obtain overall project goals and parameters while communication channels are established. For design projects, we recommend recurring update meetings on a weekly or biweekly basis which can also act as collaborative workshops when appropriate. The design stage typically involves conceptual, schematic, design development and construction documents phases. Through collaborative meetings with the Town, confirmed programs and complete concepts will be developed to guide design understanding among all parties involved. KPA is experienced in coordinating efforts across many levels of stakeholder input leading to clear definition of goals and potential actions. Future opportunities are identified where possible to address considerations that may not have been identified in initial project scopes. Programming meetings will be held with the Town project teams as appropriate to review concepts and outline opportunities. Discussion topics will be clearly outlined on an agenda produced in-house. For this project, architectural services will include: • Conducting pre -design meetings with stakeholders to gather requirements and establish project goals • Reviewing the Town's concept design to validate that the design meets requirements and meet stakeholder expectations • Refining the design through design development and feedback to ensure alignment with project objectives • Preparing comprehensive construction documents, including detailed drawings and technical specifications • Supporting permit review process by responding to plan check comments and resubmitting updated documents and specifications • Assisting with bidding processes, including preparing bid documents and evaluating contractor proposals • Ensuring contract documents compliance by monitoring construction and verifying against project specifications • Coordinating with local authorities, utility companies, and other relevant parties for necessary permits and approvals Overseeing project management services throughout design, pre -construction, construction, and procurement stages Providing construction period services, including site visits, progress reports, and addressing design issues Overseeing the project punch list and close-out procedures PROFESSIONAL DESIGN SERVICES TOWN OF LOS ALTOS HILLS, CA ITHE KPA GROUP •'V "JIB 1®il tall On-Call Services Team Setup Schedule Communication Quality Construction Understand client Identify & commit Monthly & Update client Checked by Site visits & reports needs & KPA personnel weekly communications Principal Additional expectations Maintain personnel schedules regularly Bring matters to requested services Verify scope & flexibility Timely reviews client's attention schedule Provide backup plan Timely responses & clarifications OUR WORK PROCESS Please refer to the Work Plan section for our detailed project approach. As an overview of services, KPA will provide: Architecture Services Architecture Services begin with a thorough understanding of the Town's intent, objectives and relative budget. KPA will listen to obtain overall project goals and parameters while communication channels are established. For design projects, we recommend recurring update meetings on a weekly or biweekly basis which can also act as collaborative workshops when appropriate. The design stage typically involves conceptual, schematic, design development and construction documents phases. Through collaborative meetings with the Town, confirmed programs and complete concepts will be developed to guide design understanding among all parties involved. KPA is experienced in coordinating efforts across many levels of stakeholder input leading to clear definition of goals and potential actions. Future opportunities are identified where possible to address considerations that may not have been identified in initial project scopes. Programming meetings will be held with the Town project teams as appropriate to review concepts and outline opportunities. Discussion topics will be clearly outlined on an agenda produced in-house. For this project, architectural services will include: • Conducting pre -design meetings with stakeholders to gather requirements and establish project goals • Reviewing the Town's concept design to validate that the design meets requirements and meet stakeholder expectations • Refining the design through design development and feedback to ensure alignment with project objectives • Preparing comprehensive construction documents, including detailed drawings and technical specifications • Supporting permit review process by responding to plan check comments and resubmitting updated documents and specifications • Assisting with bidding processes, including preparing bid documents and evaluating contractor proposals • Ensuring contract documents compliance by monitoring construction and verifying against project specifications • Coordinating with local authorities, utility companies, and other relevant parties for necessary permits and approvals Overseeing project management services throughout design, pre -construction, construction, and procurement stages Providing construction period services, including site visits, progress reports, and addressing design issues Overseeing the project punch list and close-out procedures PROFESSIONAL DESIGN SERVICES TOWN OF LOS ALTOS HILLS, CA ITHE KPA GROUP 2. QUALIFICATIONS KPA's experience providing architectural and engineering services public clients stems from multiple years of working with various public entities to complete individual task orders or projects under similar contracts. Since inception, public projects have been a the most significant component of KPA's annual workload. KPA maintains current project agreements with a number of entities in California similar to the Town of Los Altos Hills. Current KPA Public Clients: D ,u - y.,i 0 'SAh1 MA-r'mca CouNTY ti ^�trQo�a�'� County of San Mateo City of Richmond Town of Los Gatos City of Eureka County of Santa Clara San Mateo County Airports snc �OVNTy S0 •0 TRACY Ar", ILL OaI1fo Ra��oF co'l850'htENtqLARK City of Newark County of Mariposa County of Monterey Cltyof7racy City of Menlo Park Stanislaus County County of Contra Costa Town of Doss General Architecture Services • Civic Center Master Planning • Space Programming • Public Outreach • Committee Meetings • Site Tours • Cost Estimating City of Cupertino • Consultation with agencies • Facilities condition assessments • Field investigations • Feasibility studies (concept & budget) • Capital Improvement Program Town of Los Gatos • Development of full construction drawings and specifications and CA on multiple projects • Permitting processes • Accessibility compliance • Feasibility analysis City of Tracy • Master Planning • Facilities condition assessments • Temporary Emergency Housing • Site Utility Engineering • Field investigations San Jose State University • Assessment and feasibility study • Facility modernizations • Working with user groups • Construction Administration Full Design Services, Bidding and Construction Support Complete design services for specific client needs that will enrich the community, better maintenance operations and otherwise improve facilities is provided by KPA. We understand the importance of designing with a focus on east of maintenance and longevity. KPA leverages staff on an as -needed basis to allow for quick turnaround on short notice items should unforeseen conditions arise. Our firm undergoes a complete design process with review stages at multiple submissions (35%,60%,95%, 100%) for each task order or Project. Cost Estimating and Scheduling Controlling budget and schedule starts with experience in accurate project service projections. Success in similar design endeavors allows KPA to form accurate estimates aligning service and time requirements for specific tasks. Obtaining a solid handle on cost knowledge and control will facilitate project modification processes for the UC Davis Health and allow for quick alignment of scope with budgetary needs. Communication, Coordination and Consultation KPA understands the importance of meaningful communication channels between all parties involved. Meeting minutes and reports benefit client insight for employees and can lead to better stakeholder and public understanding based on applicable projects. Our process of engaging community and stakeholder participation among various agencies -has led to the inclusion of customized elements in past projects. Field Investigations, Assessment and Feasibility Analysis KPA performs facility condition assessments and site condition assessments in house. We review various building and site condition elements and rate items on a scale from poor (1) to excellent (5). Condition assessments are documented and tailored to client needs. KPA facilitates the preliminary design process by discussing kickoff options with the client including site observations, investigations, surveys, worksheets and in-person workshops. Data obtained is used to reorganize, relocate, or otherwise improve site and spaces. Design options and concept diagrams are produced and presented for discussion. PROFESSIONAL DESIGN SERVICES TOWN OF LOS ALTOS HILLS, CA I THE KPA GROUP 2. QUALIFICATIONS E Civic Center Master Plan, Town of Ross (2022-2023) Contracting Agency: Town of Ross Contracting Agency Project Manager: Christa Johnson, Town Manager Contracting Agency Contact Info: cjohnson@townofross.org Contract Amount: $163,000 Funding Source: Town of Ross Operating Budget KPA Project Manager and Contact Info: Lisa Lim, lisal@thekkpagroup.com Project Description: The Town of Ross commissioned KPA to prepare a Facilities Master Plan (FMP) to highlight the Civic Center property as a gateway to their unique town. The planning requirements were to define programmatic space needs, address municipal facility inefficiencies, facilitate emergency services, enhance customer convenience and correct site deficiencies to improve pedestrian, bike and vehicular circulation. KPA produced several site concept options for Town Council preview and input after site investigations, interviews and stakeholder meetings. KPA has planned public outreach and engagement efforts including tours of the existing site. Project Outcome: The project concluded with the Council's approval for the preferred FMP Concept that will be further developed as a separate design project. Radio Shop - Feasibility, Design & Construction, San Mateo County (2019-2020) Contracting Agency: County of San Mateo, Department of Public Works Contracting Agency Project Manager: Tory Newman, Senior Project Manager Contracting Agency Contact Info: tnewman@smcgov.org Contract Amount: $341,000 Funding Source: County of San Mateo Public Works Department KPA Project Manager and Contact Info: Paul W. Powers, paulp@thekpagroup.com Project Description: The KPA Group supported the County of San Mateo to plan the construction of the new Radio Shop and administration offices in their existing Grant Yard. According to the County's ideal program and plan, and after the feasibility analysis and evaluation of the existing plan and site conditions, KPA provided several program concepts and planning options with a report that outlined the pros and cons for each option individually. KPA served the County with the evaluated preliminary planning data and provided additional concepts and feasibility analysis to prepare for the further development of the site. Project Outcome: The project's construction commenced in 2021. Probation Department - Phase 1 Design Services, Mariposa County (2023 -Present) Contracting Agency: Mariposa County Contracting Agency Project Manager: Matt Hespenheide, County Engineer Contracting Agency Contact Info: matthespenheide@mariposacounty.org Contract Amount: $67,000 Funding Source: Mariposa County Engineering KPA Project Manager and Contact Info: Lisa Lim, lisal@thekkpagroup.com Project Description: KPA is currently working with the County of Mariposa to develop improvements to a site containing historic structures currently occupied by the County Probation Department. The structures housing the department were constructed in 1873 and are highly valued by the neighborhood and surrounding community. KPA is assisting the County with a phased design effort to conceptually define opportunities and solutions to enhance office space while maintaining the historic structures. Project Outcome: After review of a number of concepts with County Engineering and Probation department staff, the Board of Supervisors directed staff to continue advancement of the design concept outlining a new two-story building to be built behind the existing structures which would be reused for other County functions. PROFESSIONAL DESIGN SERVICES TOWN OF LOS ALTOS HILLS, CA ITHE KPA GROUP City of Newark, California (2023) 0 0 0 0 0 0M 0 0 �` HIES ��0/ B1 1 W8EON I I 1. I i liTi" TT TP TT Tq �q q i� 4 4 0 q q.a q lT _Illi T TTT7 4 2. QUALIFICATIONS �B Pear -= Scope of Services Project Management Architectural Design Interior Design Civil Engineering Landscape Architecture Structural Engineering MEP Engineering Permitting and Bidding Client Contact City of Newark Roya Gonzalez, Administrative Analyst Office (510) 578-4200 Direct (510) 578-4284 roya.gonzalez@newark.org Description The KPA Group is providing design, space planning and ADA improvements to re -purpose the existing Ash Street Recreation Center community building for use by as a Family Resource Center. The scope of work includes replacement of the mechanical equipment, exterior building repairs and new paint, site and building ADA compliance, addition of a new kitchenette, entry lobby and reception area, and front and rear yard improvements. A revised design for access along the adjacent Ash Street is provided. The renovations also add compliant ADA parking, path of travel and a new drop off lane to facilitate donation operations at the adjacent Viola Blythe building. This project is currently in the construction documents phase and is expected to start construction by early 2024. PROFESSIONAL DESIGN SERVICES TOWN OF LOS ALTOS HILLS, CA I THE KPA GROUP 2. QUALIFICATIONS E Trey PD HVAC Study City of Tracy, California (2023) .............................................:... ........................ ................................................. ........... Scope of Services Project Management Facility Assessment Architectural Design Structural Engineering MEP Engineering Client Contact City of Tracy, Development Services Ilene Macintire, Senior Civil Engineer- Engineering Division Office (209) 831.6454 Mobile (510) 427-8700 ilene.macintire@cityoftracy.org Description The City of Tracy commissioned the KPA Group to prepare a HVAC study for the Police Department building. The scope of work for this study involved field investigations of the existing HVAC system which are water source heat pump units located above an acoustical ceiling system. Following system analysis and evaluations, options and recommendations were made to the City for replacement of the rapidly failing HVAC system. New equipment to cool existing Telephone room which is currently unconditioned was also recommended. Cost estimates were provided as part of the project to identify specific costs among options and understand impacts of existing building components based on specific options selected. The study is completed and currently awaiting funding to proceed with next phase of design. PROFESSIONAL DESIGN SERVICES TOWN OF LOS ALTOS HILLS, CA I THE KPA GROUP 2. QUALIFICATIONS Monterey County Public Works Renovations - San Ardo San Ardo, California (2023) &_: _FQN SECTION Scope of Services Project Management Architectural Design Interior Design Civil Engineering Structural Engineering MEP Engineering Permitting and Bidding Construction Administration Client Contact County of Monterey Dave Pratt, Project Manager - Public Works (831) 796-6091 PrattDW@co.monterey.ca.us SECTION _-M111 Description R011G tll�-lt" ',vr5t ED V'LOGR-,� RDCi y_ "I!,SK0 nggl 106'..0 ... The County of Monterey operates a Public Works yard in the community of San Ardo. The KPA Group was commissioned by the County to investigate existing conditions, prepare design alternatives for consideration and then complete construction documents for the preferred concept. The scope of work includes concrete surface repairs, the addition of a functional covered open storage area, replacing a sliding garage door with new overhead door and man door, addition of an accessible parking stall, an accessible single accommodation toilet room, and interior improvements. The project is currently being bid and construction administration services will start soon after contracts are in place. PROFESSIONAL DESIGN SERVICES TOWN OF LOS ALTOS HILLS, CA I THE KPA GROUP 2. QUALIFICATIONS IN VAPAH S Sunnyvale Office Building Retrofit and Expansion Sunnyvale, California (2017,2020-2021 -Phased) Scope of Services Description Project Management Architectural Services Interior Design Construction Administration Structural Engineering Civil and MEP Engineering Geotechinical Survey Permitting and Bidding Process, including CEQA Client Contact Department of Veterans Affairs, SFVAMC Dennis Becker, Manager, VAPAHCS Contracting Officer 925-372-2307 dennis.beci<er2@va.gov This project involves the remodel and conversion of an existing two-story 50,000 SF 1960's office building. It also includes the design of a 7,000 SF lobby addition and a 19,000 SF two-story office addition. The design establishes many new systems such as site infrastructure, electrical and gas service, site fire hydrant system, storm water drainage system and fire protection extensions to the existing and new additions. Future planning for the project takes into account considerations for additional office space, on-site parking and a new parking structure. The facility will be used as a new administrative Bay Area office for the Department of Veterans Affairs. PROFESSIONAL DESIGN SERVICES TOWN OF LOS ALTOS MILLS, CA JTHEKPAGROLIP 3. RESUMES in The KPA Group will provide a team of experienced architectural and engineering professionals for the Town of Los Altos Hills. This primary project team includes sub -consulting professionals in respective disciplines and KPA will engage individual sub- consuitants as warranted by project requirements. Key team members are well -versed in project communications and provide practiced and responsible direction and oversight to additional KPA team members. Paul Powers will oversee each project and together with Sr. Project Manager Lisa Lim, organize and lead individual design and improvement projects. Matt Evans will oversee field verifications and assessment efforts. This same team has worked with KPA on multiple building renovations, facility modernizations, and site alternations. Jessica Tyler Senior Project Architect Hadit Broadney Project Designer/Analyst LOS ALTOS DILLS a CALIFORNIA Town of Los Altos Hill The KPA (croup Paul Powers Principal -in -Charge, Project Manager Lisa Lim Senior Project Manager Matthew Evans Senior Project Associate Marty Baker Senior Technical Designer Daniel Herms Technical Designer Sub -Consultants Vince Paske Senior Graphic Designer Dan Reiter Keith A. Pharis Eugene Tuan Senior Mechanical Senior Electrical Senior Structural Engineer Engineer Engineer The KPA Group partners with sub -consulting professionals based upon specific project needs. We work closely with structural engineers, mechanical/plumbing engineers, electrical engineers, geotechnical engineers, CASp professionals, and other consulting engineers regularly. We have the capability and capacity to tailor our sub -consulting project team based on individual project needs or task agreements. KPA regularly reviews project goals with sub -consultants to promote productive communication and increased project efficiency. Our Senior Project Associate Matthew Evans directly communicates with sub -consultants on a daily basis for team coordination. The KPA design team also schedules weekly engineering meetings with sub -consultants as required. PROFESSIONAL DESIGN SERVICES TOWN OF LOS ALTOS HILLS, CA ( TFIE KPA GROUP 3. RESUMES ll •' Registration Description Paul W. Powers, Title Paul Powers has collaborated with dozens of towns, • City of Tracy Citywide Public Facilities AIA, NCARB Principal in Charge / cities and counties over the past 30 years to complete Assessment & Master Plan, City of Tracy The KPA Group Project Manager/ a wide range of public projects. A highly -skilled project • City of Eureka Citywide Public Facilities Architect manager, Paul is responsible for a broad range of Condition Assessment and Master Plan, City professional services including assessment, planning, of Eureka License/Registration programming, analyzing existing buildings, space • Comprehensive Facilities Condition Architect C29713 planning, project design, interior design, and the Assessment and Master Plan, City of development of construction drawings and Cupertino Affiliation specifications. Paul has specialized skills in contract • VA Sunnyvale R&D Campus Office Expansion, AIA, NCARB administration and coordination, integrating Sunnyvale engineering services, construction cost estimation, and • South Napa Shelter ADA and HVAC Years of Experience construction administration. His project experience Improvements, Napa 30+ Years ranges from aviation to military support facilities, • County of San Mateo New Radio Shop, 10 Years with KPA vehicle maintenance and storage facilities; county Redwood City highway garages; public works, postal, and park • Contra Costa County New Terminal Building Education facilities; schools and civic services facilities; and and ARFF, Buchanan Field Airport, Concord Master of Architecure corporate and commercial offices. Lisa Lim Title Lisa has over 25 years of experience in design and • City of Watsonville Citywide Facilities The KPA Group Senior Project management of a wide range of projects for both Assessment Manager public and private sectors. She is involved in existing • VA Functional Realignment Alignment Study, building analyses, feasibility studies and reports, space Palo Alto Campus Years of Experience planning, client standards, project design, interior • Frederiksen Elementary School Feasibility 25 Years design, constructability peer reviews, cost estimating, Study for Campus Replacement, Dublin 6 Years with KPA and construction administration. Her broad project DUSD District Offices Facilities Condition experience allows her to see the big picture but still • Facilities Condition Assessment and Education focus on the finer details and all moving parts which Modernization Design Ping Yuen Housing, B.A Architecture will serve the project well. San Francisco • PG&E Training and Conference Center Improvements, San Ramon • Port of Oakland M102 Administrative Office Renovations, Oakland International Airport, Oakland • Dublin Unified School District Administrative Office Conditions Assessment and Modernization Design, Dublin Matthew Evans Title Matthew Evans brings environmental science expertise • City of Tracy Citywide Public Facilities The KPA Group Senior Project which helps shape sustainable solutions by gathering Assessment & Master Plan, City of Tracy Associate geographical and technical data and applying it to • City of Eureka Citywide Public Facilities building improvements and design. Matt works to Condition Assessment and Master Plan, City Years of Experience provide field visit, cost estimates and planning reports of Eureka 9 Years on a regular basis. Matt's knowledge of a wide variety • Comprehensive Facilities Condition 9 Years with KPA of services benefits the team on-site with trust and Assessment and Master Plan, City of professionalism. He works closely with architects, Cupertino Education planners, and engineers to help meet the client's • City of Tracy Temporary Emergency Housing, B.S. Environmental goals. City of Tracy Science • County of San Mateo 795 Skyway Road Office Building Remodel, San Carlos • Monterey Public Works Yard Improvements, San Ardo PROFESSIONAL DESIGN SERVICES TOWN OF LOS ALTOS HILLS, CA I THE KPA GROUP 3. RESUMES 'MemberTeam Nscriptfon Relatedfxpetlencee Jessica Tyler, Title Jessica Tyler brings to the team over 20 years of • City of Tracy Citywide Public Facilities AIA, NCARB, Senior Licensed architectural design and technical detailing experience. Assessment & Master Plan, City of Tracy LEED AP Architect Jessica has been the lead architect for award winning • City of Eureka Citywide Public Facilities The KPA Group and complex public and military projects. She provides Condition Assessment and Master Plan, City Affiliation an understanding of how to complete projects and of Eureka AIA, NCARB meet the ever-changing complexities of project • Comprehensive Facilities Condition LEED AP compliance. Jessica has dedicated her career to Assessment and Master Plan, City of learning codes, standards and technical detailing to Cupertino Years of Experience improve project and building performance. She works • City of Tracy Temporary Emergency Housing, 25 Years consistently to improve quality and understanding. City of Tracy 10 Years working with Jessica will review architectural drawings and • County of San Mateo 795 Skyway Road Office KPA documents, assess facility conditions and architectural Building Remodel, San Carlos improvements, and conduct code review for your Education public facilities. Master of Architecture Hadit Broadney, Title Hadit Broadney has extensive experience in • City of Tracy Citywide Public Facilities NCARB Senior Project architectural and interior design for public agencies. Assessment & Master Plan, City of Tracy The KPA Group Analyst/Designer Hadit will lead department and public engagement • City of Eureka Citywide Public Facilities including surveys and outreach processes. As Project Condition Assessment and Master Plan, City Affiliation Analyst and Designer, she will create planning and of Eureka AIA, NCARB design concepts to assist building users and the Town • Comprehensive Facilities Condition in better understanding of site and space needs. She Assessment and Master Plan, City of Years of Experience will work with the team on the production of the Cupertino 9 Years documentation of data collection and improvement • Humboldt County Facilities Condition 4 Years with KPA analysis. Her careful consideration for true outcomes Assessment and Master Planning, County of will lead to effective and efficient improvement Humboldt Education solutions for county facilities. • Los Gatos ARC ADA Improvements, Los Gatos Master of Architecture • Los Gatos Civic Center Tenant Improvement Project, Los Gatos o VA Sunnyvale R&D Campus Office Expansion, Sunnyvale Marty Balser Title Marty Baker has been leading the production of • South Napa Shelter Feasibility Study and The KPA Group Senior Technical quality construction drawings for over 35 years. He Tenant Improvement, Napa County Designer has collaborated with Paul on hundreds of projects. • County of San Mateo New Radio Shop, He plays a critical role in mentoring KPA's design staff Redwood City Years of Experience in technical resolution, design methodology, and • County of San Mateo 795 Skyway Road Office 30+ Years standards. Marty's attention to detail and Building Remodel, San Carlos Contra Costa 10 Years with KPA coordination of multiple building systems supports The • New County Terminal Building & ARFF, KPA Group's reputation for first-class drawings, Buchanan Field Airport increasing contractor production, reducing errors, and • VA Sunnyvale R&D Campus Office Expansion, providing a measure of control for construction costs, Sunnyvale • VASFMC OIT Office Renovation and Expansion, San Francisco PROFESSIONAL DESIGN SERVICES TOWN OF LOS ALTOS HILLS, CA I THE KPA GROUP PROFESSIONAL DESIGN SERVICES TOWN OF LOS ALTOS HILLS, CA I THE KPA GROUP Description Related Uperlence Daniel Herms Title Daniel Herms produces technical design drawings and • County of San Mateo Radio Shop, Redwood The KPA Group Technical Designer documents. Dan's expertise in accurately City documenting project scope leads to successful project • County of San Mateo 795 Skyway Road Office Years of Experience delivery. His contribution to design reviews, project Building Remodel, San Carlos Contra Costa 5 Years solution evaluations and alternative analysis brings • County Terminal Building & ARFF, Buchanan 5 Years with KPA value to every project. Dan works closely with his Field Airport team to visualize a mindful approach to space • Humboldt County-wide ADA Modifications planning, facility design and operational improvements projects to remove barriers at: Clam Beach, for employees and the public. Dan understands the Freshwater Park, Field's Landing and the need to balance departmental wishes with broader Public Defender's Office project goals. Dan explores potential alternatives and • VA Sunnyvale R&D Campus Office Expansion, avenues to resolving design issues. He works closely Sunnyvale with the project manager and client to establish • VASFMC OIT Office Renovation and project goals and expected outcomes. Expansion, San Francisco • South Napa Shelter Feasibility Study and Tenant Improvement, Napa County • Los Gatos ARC Parking Lot Improvements, Los Gatos Vince Paske, Title Vince has an integrated background covering • Facilities Master Plan Renderings, Ross CA LEED AP, IVCARB, Senior Graphic architecture, planning, and engineering. His technical • Tracy Transit Center NEPA Compliance, Tracy APA Designer approach to the analysis of field assessment data and CA The KPA Group recommendations will allow the feasibility of • Ukiah Bank of America Remodel, City of Affiliation recommended solutions. Vince has experience in Ukiah LEED AP, NCARB, APA providing sustainable analysis, design, and strategies • Temporary Emergency Housing, City of Tracy for public clients and will bring these elements into • Mariposa County Probation Deptment, Years of Experience concepts and suggestions for Santa Clara County. Mariposa County 25 Years Vince will lead project visualizations, assessment and 3 Years with KPA studies, and report formatting processes for planning and other documents required. He will work with County staff to tailor the visualization strategies for overall project and planning solutions. PROFESSIONAL DESIGN SERVICES TOWN OF LOS ALTOS HILLS, CA I THE KPA GROUP 3. RESUMES in e vDescriptim 8 77771) :RelatedExperience Keith Pharis, Title Keith has more than 30 years of experience In • City of Tracy Citywide Public Facilities P.E., LEER AP Senior Electrical electrical engineering, project management, leading Assessment & Master Plan, City of Tracy Pharis Engineering Engineer MEP teams, facility assessment/expert analysis, • City of Eureka Citywide Public Facilities master planning, and personnel directing. Keith has a Condition Assessment and Master Plan, City License/Registration vast experience base with extensive electrical engineer of Eureka CA Electrical #E17740 skillset as well as leadership skills. His technical • Comprehensive Facilities Condition LEED AP expertise involves all aspects of electrical engineering Assessment and Master Plan, City of including power (high, medium, and low voltage), Cupertino Years of Experience emergency/standby generator systems for both • VA San Francisco Bldg. 3, 5,7 & 11 Project 30+ Years medical and mission-critical/data facilities, and lighting Books (Facilities Assessment and 11 Years with KPA specifications/calculations/selection. Keith's expertise Programming), San Francisco also covers low voltage systems such as fire alarm, • Humboldt County Facilities Condition Education security (CCTV, access control, physical, etc), CATV, Assessment and Master Planning, County of M.S. Electrical broadcast, cabling, data and telecommunication Humboldt Engineering systems, healthcare call systems, door monitoring, etc. Keith enjoyed working in the design sector from government, healthcare, housing, commercial, educational, industrial, etc. Dan Reiter, P.E., Title Dan Reiter is a registered Professional Engineer in • City of Tracy Citywide Public Facilities LEER AP Senior Mechanical & multiple states and brings more than 30 years of Assessment & Master Plan, City of Tracy GHD Engineer mechanical and plumbing engineering experience on • City of Eureka Citywide Public Facilities various types of building and facilities throughout Condition Assessment and Master Plan, City License/Registration Montana and the Western U.S. Dan Reiter specializes of Eureka CA Mechanical in design of HVAC systems, energy modeling, • Comprehensive Facilities Condition #M32827 automatic fire sprinkler design plumbing engineering, Assessment and Master Plan, City of structural modeling, project management and building Cupertino Years of Experience code plan review. Dan will conduct mechanical and . VA San Francisco Bldg, 3, 5,7 & 11 Project 30+ Years plumbing related review and analysis for facilities Books (Facilities Assessment and 8 Years with KPA master plan. Programming), San Francisco • Humboldt County Facilities Condition Education Assessment and Master Planning, County of M.S. Mechanical Humboldt Engineering Eugene Tuan, Title Mr. Tuan has been a Principal with Tuan and Robinson, • Elmwood Correctional Facilities S E President/Structural Structural Engineers, Inc, since 1999. Previously, he Sundeck/Medical Housing Units, Milpitas, CA Tuan and Robinson Engineer was an Associate with SOHA Engineers of San Elmwood Correctional Facility ADA Structural Engineers, Francisco. He has designed a variety of new buildings • Improvements - Phase 1 and Phase 2, Inc. License/Registration and seismic rehabilitation systems for existing Milpitas, CA CA Civil #C46887 structures, specializing in historic buildings. He has • Cannery Row Parking Garage Elevator CA Structural #53982 extensive knowledge of the design of wood, steel, Enclosure, Monterey, CA concrete, and masonry structure. Currently, he is the • SCC Department of Tax and Collections, 852 Years of Experience Principal -in -charge for an on-call structural engineering 1st Street, San Jose, CA 35 Years of Experience services contract with the City of Monterey, Santa • Westside Pump Station Reliability 23 Years Experience Clara County, San Francisco Recreation and Parks, San Improvements, San Francisco, CA with Tuan & Robinson, Francisco Department of Public Works, and the a Bernal Heights Library Renovation, San Structural Eng. Presidio Trust. Francisco, CA • Accessibility Upgrades for City Hall, Education Monterey, CA M.S. Structural Engineering PROFESSIONAL DESIGN SERVICES TOWN OF LOS ALTOS HILLS, CA I THE KPA GROUP 4. WORKPLAN E The Heritage House is a historic residential building relocated to the Town from the City of Los Altos in the mid-1980s. Currently, the building is used by the History Committee and the Emergency Preparedness and Response Committee (EPRC) for different uses. The building has seen other uses in the past including use by the Sheriff's Department. The Town wishes to provide improvements to interior spaces of the building in order to better serve the Town's current and future needs. Needs include an improved meeting area and general interior modifications to modernize the space. Communication equipment related to HAM radio operation must not be disturbed as part of construction. The Heritage House is approximately 1,030 SF in area and contains office and meeting areas, kitchen and restroom. The building contains a raised front porch leading up to the main entry. Currently, an existing ramp provides wheelchair access at the rear of the building directly into the kitchen. The Town of Los Altos Hills may be interested in maintaining some of the historic aesthetics of the Heritage House including interior mahogany wood paneling and trim where applicable. A concept design has been provided by the Town identifying and documenting the desired interior spatial reconfiguration and will be confirmed with the History Committee and EPRC through meetings and discussions before initiation of work. Considerations for storage spaces will be incorporated into the documents appropriately. A kitchenette is needed to support events but a dedicated full kitchen forTown functions will be constructed in the future. Project Management and Coordination The KPA Group will manage our architectural and engineering services for the project. We will consult with the Town of Los Altos Hills on a regular basis and communicate with members of the project team. KPA will lead project update meetings conducted through Microsoft Teams. We will coordinate with Los Altos Hills'project team to align project goals with the design. Discussions and decisions made throughout the process will be documented. The project manager will regularly coordinate the project and scheduling efforts and will lead the quality assurance process. History Committee meetings will be attended to confirm building changes and overall design. Field Verifications We will visit the Heritage House for a detailed field investigation. During investigation, field dimensions will be obtained for incorporation into CAD documents and overall project design. Photos will be obtained for project use. A general condition assessment of the facility will be performed for better understanding of existing conditions and building systems. Non-compliant elements to existing ADA path of travel into the facility will be assessed and documented as appropriate. PROFESSIONAL DESIGN SERVICES TOWN OF LOS ALTOS HILLS, CA I THE KPA GROUP EXISTING PROGRAM B -.- PROPOSED PROGRAM Sm.-, KPA provided space programming on four buildings at the San Francisco VA. KPA provided preliminary 3D concepting as part of an ongoing Civic Center Master Plan for the Town of Ross. 4. WORK PIAN Town Coordination and Periodic Meetings We will coordinate with the Town for appropriate stakeholder involvement for various public committee members and other stakeholders who wish to be involved in project design. We will facilitate programming and lead project design meetings with committee members and Town staff. Meetings will be held on an agreed upon schedule throughout the duration of design. During construction, the General Contractor will lead construction meetings. Conceptual Design & Engineering Feasibility KPA will revisit the provided conceptual design and provide the Town with any initial feedback. Concept provided by the Town has defined a desired interior layout of the facility and space adjacencies. The provided concept will form the basis for understanding of final design needs. KPA will incorporate feedback received from the Town, History Committee, EPRC and other stakeholders into a design documents as appropriate. Mechanical, electrical, plumbing and structural considerations will be incorporated into the design during completion of 50% Design Development and 95% Construction Documents phases. KPA will review the conceptual design with structural and MEP engineers for further input on feasibility and engineering requirements of construction. We will perform a field visit with engineers to investigate current structural conditions related to final design and build upon information contained in any previous documentation of structure or framing observations. Power requirements will be defined including connection points to existing power infrastructure at the site. Mechanical systems' needs will be documented based on selected interior layout. A construction cost estimate will be provided for the Town's consideration at the conclusion of this phase. KPA will compile information learned into a report documenting project requirements for discussion and presentation at stakeholder meetings. Included in this Conceptual Design Report will be: • Updated interior floor plan layout • Condition checklists for building components for understanding of condition of specific building items • Definition of areas requiring improvement along ADA path of travel • Structural considerations based on KPA's understanding of provided concept • Mechanical considerations based on provided concept • Plumbing considerations based on provided concept • Construction cost estimate PROFESSIONAL DESIGN SERVICES TOWN OF LOS ALTOS HILLS, CA I THE KPA GROUP 4. WORK PLAN IM KPA will review the Conceptual Design Report with the Town and incorporate one round of comments into a final report. We will discuss findings and appropriate next steps upon identification of final design and engineering considerations. 50% Design Documents The KPA Group will prepare 50% Design Documents for improvements to the Heritage House. Design Documents will illustrate a detailed design for a new interior layout and incorporate interior elements which will be utilized in the new design. Mechanical, electrical and plumbing systems design and preliminary calculations will be provided. Architectural and engineering details and calculations will be incorporated. Code review will be performed per architectural and engineering disciplines. ADA path of travel will be documented from Fremont Road to the interior of the Heritage House. KPA will prepare draft specifications for disciplines as required. As part of the 50% Design Documents phase, KPA will: • Begin documentation of building, electrical, plumbing, mechanical and energy code review and analysis • Document interior details • Define intended data requirements • Develop 50% Design Drawings • Architectural and structural • Site • Plumbing • HVAC • Electrical • Provide 50% design cost estimate • Provide project technical specifications • Review 50% design, final design documents and incorporate comments • Communication with town regarding findings and design completion requirements PROFESSIONAL DESIGN SERVICES TOWN OF LOS ALTOS HILLS, CA I THE KPA GROUP 4. WORK PLAN 0 95% and 100% Construction Documents &Technical Specifications The KPA Group will advance the 50% complete Design Documents prepared to 95% Construction Documents and then to 100% Construction Documents. Construction Documents will refine the extent, configuration, location, relationships and dimensions of the work to be completed. Final design changes will be made and specifications will be completed. Final construction schedules will be established and a complete construction cost estimate will be provided. Documentation of the design will be coordinated between architectural and engineering disciplines appropriately. Final code -required changes will be incorporated. During the Construction Documents phase, we will: • Complete and document building, electrical, plumbing, mechanical and energy code review and analysis • Complete and submit structural, mechanical, plumbing and electrical power calculations as appropriate. • Document requirements for ADA accessibility including final documentation of required site changes • Develop 95% Construction Documents • Architectural and structural • Site • Plumbing • HVAC • Electrical • Review 95% Construction Documents with Town and stakeholders Permit Review • Develop 100% Construction Documents • Architectural and structural • Site • Plumbing • HVAC • Electrical • Communicate construction contract elements with the Town • Complete project technical specifications • Update construction cost estimate with final quantities and pay items • Review 100% Construction Documents with the Town • Incorporate comments and prepare for permit review submission KPA will submit the Heritage House remodel drawings to the Los Altos Hills Building Department for permit review. We will complete an initial round of drawing review for permitting related to in -scope items and improvements followed by a second round of drawing review and revision related to incorporation of the first round of comments. We estimate this process to take less than 30 days. Additional time for reviews and additional/extensive reviews may result in additional compensation. After permit approval, KPA will prepare a final bid set of construction documents and specifications. Bidding Services KPA will assist in Bidding by responding to contractor questions and issuing addenda. This phase includes assisting the Town in advertising and securing bids, negotiation for service, analyzing bid results, furnishing recommendation on contract award and preparing contract documents. Electronic bidding documents will be distributed per the Town of Los Altos Hills'standard process. Tasks to be performed as Bidding Services include: Attend Town conducted pre-bid meetings, prepare agenda and sign -in sheets, and distribute bidding meeting notes • Consider contractor questions and issue clarifications during bidding periods, prepare and issue appropriate addenda • Advise the Town as to the acceptability of substituted materials or equipment PROFESSIONAL DESIGN SERVICES TOWN OF LOS ALTOS HILLS, CA I THE KPA GROUP 4. WORK PLAN In Construction Administration Services After execution of the construction contract between the Town Feasibility Study of Los Altos Hills and General Contractor for the Heritage House SJSU Engineering remodel, KPA will endeavor to protect the Town against defects Room 130 and deficiencies in the execution and performance of the work. For general Construction Administration, KPA will: ury" i tit: 11A<1piury SurJatARvl Roost 130 ROOM 130 COST: $03,075 The design goal of this room is to open up the spare for a larger engineering .shop area. There are many �xining MCf systems and partitions AWiding (he space Into smaller renins. Dishing photos of the space are shown below: 0 L • Review, edit and implement construction procedures and documents in accordance with construction policies established by the Town of Los Altos Hills. • Work closely with Town's Construction Management team to document responses to RFls, shop drawings, submittals and project decisions • Respond to information requests, trouble reports, field directives and cost change requests • Visit the site for observation and work progress during construction (3 visits) • Notify theTown and General Contractor of any failure in the work or materials to conform to the requirements of the Contract, Plans or Specifications Requests for Information & Submittals KPA will review and respond to RFIs. KPA will organize project RFIs related to site components and discuss responses to RFIs with the Town's Construction Manager as needed. Submittals and shop drawings will be reviewed in a timely manner (5 working days) with attention to overall site infrastructure and utility relationships. We will maintain a log of RFIs during construction along with responses. During the response process KPA will: Issue necessary interpretations, clarifications and replies to information requests regarding the Contract SPACE IMPROVEMENT. Documents The work required in Roo. 130 is demohnon of _ _ pnmanly o.btingparttlo Al, TI .ntshopldtmdeA uta _ • Assist the Town of Los Altos Hills with supplemental .tx roomsand would (u t n n efPenivaly �fthe sp rn it �� . was one suit—dil noInterior � tt nwalls The ,id"i y � -. instructions and change orders as required partlbon. Als are traditional gypinboard and stud all The space-, adjacent[ theelevator and elevator ma I I f room Therearznoc'I' yfi h cetlingspacel, !� , - - open struttrve with many exposed ,y,te.s Amechantcal "� j Services provided regarding submittals will be related to shop renainslora[adattita„'°'"`,ante"°°fthe,parathat"`"' drawing review, and material product substitutions review, and the management and organization of such submittals. During Amajority of the relecmmnunirauan soul electrical systems that are located on file e,Wfog is are believed to bemartive. These abandoned sync., will bedcmohished. The entire spa—vould bafro—d this with this option. process we will: Wes"'°Id all°'e—,the pain` hear" G°m'"e spaze If,, l,agn °°arhead of Is w°n'd remain in p'a`s Review drawings 11 1, fleor in bre space v:culd remain a conrrete ilnor. Exisawy lights and HVAC systems will be util-,. d& and approve shop f substitution 1Z challenge in till space is to Identify if any ufthr alecol,al and communication sy-rn, attached to for the walls are praposedtamoveareactiv.. If these systemsase active it will requisea bit mere—k to requests and submittals conformance to the relocate thesystems requirements of Contract Documents and Specifications • Determine the acceptability of substitute materials =a i:iaEtEr t uio�r.— ------- - ----- and provide an assessed and evaluated response for suggestions to the Town Feasibility Studies are an important part ofproject implementation Review any required tests in accordance with at SJSU. Most projects require a completed Feasibility Study before being funded requirements and testing methods • Receive and review certificates of inspections and approvals required PROFESSIONAL DESIGN SERVICES TOWN OF LOS ALTOS HILLS, CA I THE KPA GROUP 4. WORK PLAN IM Construction Changes KPA will monitor construction changes including the addition of alternate project components or items not portrayed in the Contract Documents. KPA will provide recommendations as to the acceptability of the costs of construction changes. Throughout the oversight of construction changes, KPA will: • Assist with the preparation of change orders or inclusion of additional items or removal of elements • Assist with the preparation and review of interpretations and clarifications • The KPA Group will not monitor work progress to review payment applications. • Construction Meetings & Phasing • KPA will attend weekly construction progress meetings with the Town of Los Altos Hills and the General Contractor on a schedule defined by the Town's Construction Manager. As part of construction meetings, we will: • Attend online construction meetings Discuss pertinent issues such as work progress, schedules, submittals, costs, building operation, safety and security. Project Closeout The KPA Group will create a punch list based on final completion of the project. The punch list process will involve observing work to determine if work or portions of work are substantially complete and ready to be prepared for certification of final completion. Punch list findings will be documented. The punch list process involves: • Conducting inspections to determine if work is completed and ready for final acceptance • Furnishing the General Contractor with a list of items that were observed to require correction or were observed to be complete • Visiting the Heritage House site to observe any apparent defects in the completed construction and assisting the Town in consultations and discussions with the General Contractor concerning the correction of such deficiencies • Making recommendations as to replacement, correction, or diminished value of defective work PROFESSIONAL DESIGN SERVICES TOWN OF LOS ALTOS HILLS, CA I THE KPA GROUP S. COST PROPOSAL 0 TOWN OF LOS ALTOS HILLS - Heritage House Remodel Design and Construction Administration Services Compensation Worksheet SUMMARY BY ROLE CLASSIFICATION PROJECT MANAGER ARCHITECT/ STRUCTURAL ENGINEER MEP DESIGNER/ TECHNICAL CAD TECH ADMIN. ENGNIEER PROF. SUBTOTAL $230.00 $215.00 $215.00 $190.00 $160.00 $100.00 prolectMaOage'r®ttt artd;Coordiriation :x 3 1 Project meetings 1 2 2 2 $1,470.00 2 Team coordination 1 2 2 2 2 1 $1,890.00 3 Stakeholder discussion 1 1 1 4 $1,420.00 4 Quality control 2 2 2 2 $1,700.00 SUBTOTAL $1,150.00 $1,505.00 $1,505,00 $1,900.00 $320.00 $100.00 $6,480.00 Vrlfigatiohs77- 1 Field investigation 1 4 4 $1,850.00 1PathField 2 Dimension compilation 2 2 4 $1,450.00 3 Condition assessment 1 2 4 $1,405.00 4 of travel documentation 1 2 2 2 $1,360,00 SUBTOTAL $460.00 $1,935.00 $430,00 $2,280.00 $960.00 $0.00 $6,065,00 PrgleGt 1Nbet�ngs r 1 I Separate stakeholder meetings 1 4 2 4 $2,280.00 2 Prepare meeting presentation materials 1 2 2 4 2 $2,170.00 SUBTOTAL $460.00 $1,290.00 $860.00 $1,520.00 $320.00 $0.00 $4,450,00 GOc,,epua�pesagn &°EFg nearing F�asibi(ityT t.. y 1 Define MEP needs 1 4 8 4 $3,570.00 2 Structural considerations 1 8 2 8 $3,900.00 3 ADA considerations 1 8 4 8 $3,990.00 4 Preliminary construction cost estimate 1 1 1 4 $1,420.00 5 Compile report 1 1 4 8 $2,485.00 SUBTOTAL $1,150.00 $4,730.00 $2,365.00 $4,560.00 $2,560.00 $0.00 $15,365.00 50°IQ,De�ign,Doc�ht�rt��', r .; � •� ;; ;., F 1 lComplete code review 4 4 2 $2,100.00 2 Final ADA documentation 4 8 $2,380.00 3 Technical specifications 4 4 8 1 $3,340.00 4 Updated construction cost estimate 2 4 $1,190.00 5 Develop 50% Design Documents 4 12 12 8 16 $10,160.00 6 Incorporate review comments 1 2 4 4 4 $2,920.00 SUBTOTAL $1,150.00 $5,590.00 $5,590.00 $6,460.00 $3,200.00 $100.00 $22,090.00 Construction Ddcurrieh#s & Tclirigaf Spectflc6iiQns 1 Complete code review 4 2 2 $1,670.00 2 Final ADA documentation 4 8 $2,380.00 3 Construction contract elements 2 1 2 $1,055.00 4 Final technical specifications 1 4 6 8 $3,900.00 5 Advance construction cost estimate 1 2 2 4 $1,850.00 6 Develop 95% Construction Documents 2 4 8 4 16 $6,360.00 7 Incorporate review comments 1 2 4 4 8 $3,560.00 8 Develop 100% Construction Documents 2 4 8 4 16 $6,360.00 9 Incorporate review comments 1 2 4 4 8 $3,560,00 SUBTOTAL $2,300.00 $5,805.00 $7,310.00 $7,600.00 $7,680.00 $0.00 $30,695.00 Fterit ReVieW 1 Submit to Building Department 2 2 2 $1,130.00 2 Drawings revisions 1 4 4 2 8 $3,610.00 3 Compile drawingbid set 2 4 $1,020.00 SUBTOTAL $230.00 $1,290.00 $860.00 $1,140.00 $2,240.00 $0.00 $5,760.00 TOTAL HOURS - Design 17 64 46 80 44 2 253 TOTAL COST • DESIGN SERVICES $6,900,00 $22,145.00 $18,920.00 $25,460.00 $17,280.00 $200.00 $90;905.00 PROFESSIONAL DESIGN SERVICES TOWN OF LOS ALTOS HILLS, CA I THE KPA GROUP S. COST PROPOSAL TOWN OF LOS ALTOS HILLS - Heritage House Remodel Design and Construction Administration Services Compensation Worksheet PROJECT ARCHITECT/ MEP DESIGNER/ SUMMARY BY ROLE CLASSIFICATION MANAGER STRUCTURAL ENGNIEER TECHNICAL CAD TECH ADMIN. SUBTOTAL ENGINEER PROF. $230.00 $215.00 $215.00 $190.00 $160.00 $100.00 Niro eat[Mana ement and Coordination - CA Services 1 Meet with Town and Contractor 2 2 $840.00 2 Team coordination 1 2 2 3 2 $1,980.00 SUBTOTAL $690.00 $430.00 $430.00 $950.00 $320.00 $0001 $2,820.00 Biildin' 1 Attend Town -conducted re -bid meetings 2 2 $810.00 2 lIssue Addenda 1 1 1 1 2 $1,170.00 3 JAdvise Town regarding substitutions 1 1 1 $660.00 SUBTOTAL $460.00 $860.00 $430.00 $570.00 $320.001 $0.00 $2,640.00 Construction Administration 1 1 Review procedures and documents 1 1 1 $635.00 L Respond to RFIs 4 4 4 $2,480.00 3 Submittal review 4 4 4 $2,480.00 4 Site observations 4 4 12 $4,000.00 5 Maintain project logs 1 4 2 $1,470.00 6 Construction meetings 2 4 4 12 $4,460.00 SUBTOTAL $920.00 $4,515.001 $3,440,00 $6,650.00 $0.00 $0.00 $15,525.00 Pro"ed%Closeout 1 JPunch list 1 6 6 $2,660.00 SUBTOTAL $230.00 $1,290.00 $0.00 $1,140.00 $0.00 $0.00 $2,660.00 TOTAL HOURS - Construction Administration 10 33 20 49 4 0 116 TOTAL COST -CONSTRUCTION $2,300400 $7,095.00 $4,300.00 $9,310.00 $640.00 $0.00 $23,645,00 GRAND TOTAL - DESIGN &`CA SERVICES $9;200.00 $29,240.00 $23,220.00 $34,770.00 $17,920,00 $200,00` $114,550.00 Proposed billing rates for KPA and sub -consultants are as follows: Professional Rates Category Project Manager Architect/ Structural Engineer Mep Engineer Designer/ Technical Professional CADTechnichian Administration Rates $230 $215 $215 $190 $160 $100 PROFESSIONAL DESIGN SERVICES TOWN OF LOS ALTOS HILLS, CA I THE KPA GROUP S. TOWN'S STANDARD CONSULTANT AGREEMENT EXEMPTIONS OR REVISIONS In KPA has no objection or modification to any sections of the Town of Los Altos Hills'Consulting Services Agreement. KPA is prepared to enter into the Town's Standard Agreement provided as Attachment C. PROFESSIONAL DESIGN SERVICES TOWN OF LOS ALTOS HILLS, CA I THE KPA GROUP