RESOLUTION NO 4 3-0 5
Attachment A
A RESOLUTION OF THE CITY COUNCIL
OF THE TOWN OF LOS ALTOS HILLS
REQUESTING THE ALLOCATION OF
FY 2005-06 TRANSPORTATION DEVELOPMENT ACT ARTICLE 3
PEDESTRIANBICYCLE PROJECT FUNDING
FROM THE
METROPOLITAN TRANSPORTATION COMMISSION
FOR THE
PEDESTRIAN BRIDGE REPLACEMENT
AT FOOTHILL COLLEGE
Findings
1. That the Town of Los Altos Hills is not legally impeded from submitting a request to the
Metropolitan Transportation Commission for the allocation of Transportation
Development Act (TDA) Article 3 funds, nor is the Town of Los Altos Hills legally
impeded from undertaking the project(s) described in "Attachment B" of this resolution.
2. That the Town of Los Altos Hills has committed adequate staffing resources to complete
the project(s) described on Attachment B.
3. A review of the project(s) described in Attachment B has resulted in the consideration of
all pertinent matters, including those related to environmental and right-of-way permits
and clearances, attendant to the successful completion of the project(s).
4. Issues attendant to securing environmental and right-of-way permits and clearances for
the project(s) described in Attachment B have been reviewed and will be concluded in a
manner and on a schedule that will not jeopardize the deadline for the use of the TDA
funds being requested.
5. That the project(s) described in Attachment B comply with the requirements of the
California Environmental Quality Act (CEQA. Public Resources Code Sections 21000 et
seq.), and that the Town of Los Altos Hills is in possession of the document(s) supporting
such compliance, said document(s) having been made available to for public review and
stamped by the County Clerk or County Recorder of the county in which the claimant is
located.
6. That as portrayed in the budgetary description(s) of the project(s) in Attachment B, the
sources of funding other than TDA are assured and adequate for completion of the
project(s).
• •
RESOLUTION NO 4 3-0 5
Attachment A (Page 2 of 2)
7. That the project(s) described in Attachment B are for capital construction and/or design
engineering; and/or for the maintenance of a Class I bikeway which is closed to
motorized traffic; and/or for the purposes of restriping Class II bicycle lanes; and/or for
the development or support of a bicycle safety education program; and/or for the
development of a comprehensive bicycle and/or pedestrian facilities plan; and an
allocation of TDA Article 3 funding for such a plan has not been received by the Town of
Los Altos Hills within the prior five fiscal years.
8. That the project(s) described in Attachment B which are bicycle projects have been
included in a detailed bicycle circulation element included in an adopted general plan, or
included in an adopted comprehensive bikeway plan (such as outlined in Section 2377 of
the California Bikeway Act, Streets and Highways Code section 2370 et seq.)
9. That any project(s) described in Attachment B that is a"Class I Bikeway,"meets the
mandatory minimum safety design criteria published in Chapter 1000 of the California
Highway Design Manual.
10. That the project(s) described in Attachment B are ready to commence implementation
during the fiscal year of the requested allocation.
11. That the Town of Los Altos Hills agrees to maintain, or provide for the maintenance of,
the project(s) and facilities described in Attachment B,for the benefit of and use by the
public.
• •
RESOLVED, that the Town of Los Altos Hills attests to the accuracy of and approves
the statements in Attachment A to this resolution; and furthermore, be it
RESOLVED, that a certified copy of this resolution and its attachments, and any
accompanying supporting materials shall be forwarded to the congestion management
agency, countywide transportation planning agency, or county association of
governments, as the case may be, of County of Santa Clara for submission to MTC as part
of the countywide coordinated TDA Article 3 claim.
REGULARLY PASSED AND ADOPTED this 19th day of May,2005.
By:
Mayor ,
ATTEST:
- ;Cit lerk
110 •
43-05
RESOLUTION NO
Attachment B
APPLICATION DOCUMENTS: TDA ARTICLE 3
BICYCLE/PEDESTRIAN PROJECT
Applicant: THE TOWN OF LOS ALTOS HILLS
County: Santa Clara
Name of Project: Bicycle/Pedestrian Bridge at Foothill College
Contact Person: Henry Louie
Telephone: (650) 941-7222
Email: hlouie@losaltoshills.ca.gov
Amount of Claim: $ 11,310
Type and extent of project (check and complete requested information
Bike Path (Class I) ❑ (length)
Bike Path (Class II) ❑ (length)
Bicycle Route (Class III) 0 (length)
Bicycle Parking Facilities 0 (num./type)
Other Bicycle Facilities 0 (type)
Bicycle Safety Education 0
Pedestrian Walkway ❑ (length)
Other Pedestrian/Bike Facilities ® Bridge (type)
Project Description: Replace pedestrian bridge over Adobe Creek
adjacent to the Foothill College entrance road connecting to El Monte
Avenue.
Financial Plan: Below, please list project components being applied for
such as planning, engineering right of way, construction, contingencies,
etc. ; also provide project budget showing total cost of project and
other funding sources. If this is a segment of a larger project, include
prior and proposed funding sources for other segments.
Project Components: Los Altos Hills Pathway funds and TDA Funds
Funding Prior Application tad Year 3rd Year Total Cost
Year Year
TDA $11,310 $11,310
LOS ALTOS
HILLS $78, 690 $78,690
PATHWAY
Total $90,000 $90,000
S
RESOLUTION NO 4 3—0 5
Attachment B (Page 2 of 2)
APPLICATION DOCUMENTS: TDA ARTICLE 3
BICYCLE/PEDESTRIAN PROJECT
Project Eligibility: YES?/NO?
A. Has the project been approved by the claimant's governing body? (If"NO,"on YES
the next page provide the approximate date approval is anticipated).
B. Has this project previously received TDA Article 3 funding? If"YES,"provide NO
an explanation on the next page.
C. For"bikeways,"does the project meet Caltrans minimum safety design criteria YES
pursuant to Chapter 1000 of the California Highway Design Manual?(Available
on the Internet at:http://www.dot.ca.gov/ho/oppd/hdm/chapters/t1001.htm).
D. Has the project been reviewed by a Bicycle Advisory Committee?(If"NO," YES
provide an explanation on the next page).
E. Has the public availability of the environmental compliance documentation for NO
the project(pursuant to CEQA)been evidenced by the dated stamping of the
document by the county clerk or county recorder? (If"NO"provide and
explanation on the next page;and note that MTC cannot allocate funds to a
project which lacks environmental clearance).
F. Will the project be completed within the three fiscal year time period(including YES
the fiscal year of funding)after which the allocation expires? Enter the
anticipated completion date of project(month and year)6-30-2006
G. Have provisions been made by the claimant to maintain the project or facility, YES
or has the claimant arranged for such maintenance by another agency? (If an
agency other than the Claimant is to maintain the facility provide its name:
E. Notice of Exemption to be filed with the County Clerk prior to final
design.