Loading...
HomeMy WebLinkAbout59-05 • • RESOLUTION NO. 59.0.5 RESOLUTION OF THE TOWN OF LOS ALTOS HILLS ADOPTING THE TOWN OF LOS ALTOS HILLS PATHWAY CIP 2005 WHEREAS, the City Council of the Town of Los Altos Hills has read and considered the Town of Los Altos Hills Pathway CIP 2005; NOW, THEREFORE, the City Council of the Town does RESOLVE as follows: 1. Public interest and convenience require the Town of Los Altos Hills to accept the CIP as presented; and 2. Direct implementation of the CIP's recommendations as Town resources permit. PASSED AND ADOPTED this /(2 day of _d./,, ' , 2005. • By: )177 ATTE T. ` City Clerk #652071v1 TOWN OF LOS ALTOS HILLS PATHWAY CIP 2005 SUMMARY SHEET B C D F G H I J K LD. Location Project Description FY 2005-06 FY 2006-07 FY 2007-08 FY 2008-09 FY 2009-10 TOTAL 1 Number 2 Miranda Road(Fremont Road to Complete missing segments along roadside. $15,000 Miranda Way) Existing segments need some patches and repair. $15,000 2 3 Manuella Road(Fremont Road Complete missing segments.Minor patching $15,000 $15,000 to Alicante Road) required for existing completed segments. 3 Moody Road(Francemont Drive Complete pathway on south side of Moody Road 4 $100,000 $100,000 to Rhus Ridge Drive) from Francemont Drive to Rhus Ridge Drive 4 • 5 Page Mill Road Complete Plan for Page Mill Road. $250,000 $250,000 5 Construct retaining structure and pathway at 6 13015 Robleda Road Path 13015 Robleda Road.Installation is similar to that $65,000 $65,000 used along 13320 Robleda Road 6 Taaffe Road to Black Mountain Complete key connector from Black Mountain $80,000 $80,000 to Elena Road Connector Road to Elena Road 7 Add 3 pathway signs:one at edge of driveway Wildflower Lane to Newbridge (13769 Wildflower);2nd along driveway pointing 8 Drive Connector to path;3rd at backside of 13770 Wildflower $0 Lane. PROJECT COMPLETED S Summerhill Avenue Roadside On road pathway along Summerhill Avenue 10 Path Next priority for funding TBD $0 - • 9 Magdalena Avenue I-280 Off Construct retaining wall and install pathway 11 Ramp between gutter and fence TBD $0 10 Needs Caltrans Approval 12 Black Mountain to Elena Road Complete key connector from Black Mountain $80,000 $80,000 connector Road to Elena Road 11 Improve roadside pathway on Fremont Road 14 Bullis School Path leading to the Bullis School site.Work to include $15,000+ $0 crosswalk improvements 12 TBD L:\engineeiinglPATHWAYS\Pathways Capitol Projects GIP 05252005 DAVE REVISED 6-8-5 Page 1 of 3 TOWN OF LOS ALTOS HILLS PATHWAY CIP 2005 SUMMARY SHEET B C D F G H I J K I.D. Location Project Description FY 2005-06 FY 2006-07 FY 2007-08 FY 2008-09 FY 2009-10 TOTAL 13 Number 15 Hilltop Drive Path Add a 20 foot long roadside path segment at $10,000 $10,000 12355 Hilltop Drive 14 Natoma Path:Altamont to Black Roadside path on northwest side on Natoma 16 Mountain Road Road from Altamont Road to Black Mountain $35,000 $35,000 Road 15 17 Natoma Path on Black Mountain Roadside path on Southside on Black Mountain $35,000 $35,000 Road Road from Natoma Road easterly •, 16 Bridge on Page Mill Road Construct a pathway bridge on the east side of 18 Pathway near Moon Lane Page Mill Road downhill from Moon Lane,approx. $50,000 $50,000 20 yards off of the Page Mill pavement 17 19 La Loma Drive to Open Space Construct native path around water tank from $45,000+ $0 La Loma to open space TBD 18 Construct a small bridge or low water crossing 20 Aric Lane to Esther Clark Park acceptable to the City of Palo Alto and affected $6,000 $6,000 resource agencies(Fish and Game,SCVWD, etc.)and install a pathway sign 19 21 Magdalena Road from Construct roadside path on north side of $45,000+ $0 Ravensbury to 1-280 Magdalena from Ravensbury to 1-280 TBD 20 Not currently shown on Pathway Master Path • 22 Dr.Deex's Pathway Plan TBD $0 21 23 Edgerton Pipe Extension New pathway in Edgerton water pipe extension $20,000 $20,000 Pathway easement 22 24 Concepcion Road at Purissima Erosion Control TBD $0 Road 23 25 Viscaino Road Path Install a 2 inch AC berm to separate the road from TBD $0 the pathway 24 Bengineedng\PATHWAYS\Pathways Capital Protects CIP 05252005 DAVE REVISED 6-8-5 Page 2 of 3 TOWN OF LOS ALTOS HILLS PATHWAY CIP 2005 SUMMARY SHEET B C D F G H I J K LD. Location Project Description FY 2005-06 FY 2006-07 FY 2007-08 FY 2008-09 FY 2009-10 TOTAL 25 Number 26 Clausen Court to Dawnridge Reduce cross slope,clear and improve path next $10,000 $10,000 Drive to Freeway 26 27 El Monte Road to Magdalena Construct native path adjacent 1-280 TBD $0 Road 27 Moody Road Path& 28 Bike Accommodation Standard path and bike accommodation $235,000 $235,000 28 (Segment 1) 111, 29 Foothill College Path Standard decomposed granite path,8'AC Bike $280,000 $280,000 (Segment 2) Path and non-vehicular bridge 29 Add signalized ped x-ing at eastbound El Monte Road and approaches to both Stonebrook Drive and Foothill 30 Stonebrook Drive Intersection College.Ped signals,interconnect conduit, $165,000 $165,000 (Segment 3) marking,new path south side of Moody between 30 Stonebrook Avenue and Foothill College . Re-striping between Provide standard paths on both sides,bike 31 Route 280 Ramps accommodation with outside shoulders,reduce El $70,000 $70,000 (Segment 4) Monte Road to one through lane in each direction 31 between ramps El Monte Road- Provide standard path on both sides,bike Voorhees Drive to Summerhill 32 accommodation in shoulders,and signal $235,000 $235,000 Avenue interconnect system 32 (Segment 5) r LOCAL FUNDS 185,000 171,000 90,000 100,000 370,000 916,000 33 . EXTERNAL FUNDS 200,000 640,000 840,000 34 TOTAL COSTS 385,000 811,000 90,000 100,000 370,000 1,756,000 35 • L-\engineering\PATHWAYS\Pathways Capital Projects CIP 05252005 DAVE REVISED 6-6-5 Page 3 of 3