RESOLUTION NO. 59.0.5
RESOLUTION OF THE TOWN OF LOS ALTOS HILLS
ADOPTING THE TOWN OF LOS ALTOS HILLS PATHWAY CIP 2005
WHEREAS, the City Council of the Town of Los Altos Hills has read and
considered the Town of Los Altos Hills Pathway CIP 2005;
NOW, THEREFORE, the City Council of the Town does RESOLVE as follows:
1. Public interest and convenience require the Town of Los Altos Hills to
accept the CIP as presented; and
2. Direct implementation of the CIP's recommendations as Town resources
permit.
PASSED AND ADOPTED this /(2 day of _d./,, ' , 2005.
•
By: )177
ATTE T.
`
City Clerk
#652071v1
TOWN OF LOS ALTOS HILLS PATHWAY CIP 2005 SUMMARY SHEET
B C D F G H I J K
LD. Location Project Description FY 2005-06 FY 2006-07 FY 2007-08 FY 2008-09 FY 2009-10 TOTAL
1 Number
2 Miranda Road(Fremont Road to Complete missing segments along roadside. $15,000
Miranda Way) Existing segments need some patches and repair. $15,000
2
3 Manuella Road(Fremont Road Complete missing segments.Minor patching $15,000 $15,000
to Alicante Road) required for existing completed segments.
3
Moody Road(Francemont Drive Complete pathway on south side of Moody Road
4 $100,000 $100,000
to Rhus Ridge Drive) from Francemont Drive to Rhus Ridge Drive
4 •
5 Page Mill Road Complete Plan for Page Mill Road. $250,000 $250,000
5
Construct retaining structure and pathway at
6 13015 Robleda Road Path 13015 Robleda Road.Installation is similar to that $65,000 $65,000
used along 13320 Robleda Road
6
Taaffe Road to Black Mountain Complete key connector from Black Mountain $80,000 $80,000
to Elena Road Connector Road to Elena Road
7
Add 3 pathway signs:one at edge of driveway
Wildflower Lane to Newbridge (13769 Wildflower);2nd along driveway pointing
8 Drive Connector to path;3rd at backside of 13770 Wildflower $0
Lane.
PROJECT COMPLETED
S
Summerhill Avenue Roadside On road pathway along Summerhill Avenue
10 Path Next priority for funding TBD $0 - •
9
Magdalena Avenue I-280 Off Construct retaining wall and install pathway
11 Ramp between gutter and fence TBD $0
10 Needs Caltrans Approval
12 Black Mountain to Elena Road Complete key connector from Black Mountain $80,000 $80,000
connector Road to Elena Road
11
Improve roadside pathway on Fremont Road
14 Bullis School Path leading to the Bullis School site.Work to include $15,000+ $0
crosswalk improvements
12 TBD
L:\engineeiinglPATHWAYS\Pathways Capitol Projects GIP 05252005 DAVE REVISED 6-8-5 Page 1 of 3
TOWN OF LOS ALTOS HILLS PATHWAY CIP 2005 SUMMARY SHEET
B C D F G H I J K
I.D. Location Project Description FY 2005-06 FY 2006-07 FY 2007-08 FY 2008-09 FY 2009-10 TOTAL
13 Number
15 Hilltop Drive Path Add a 20 foot long roadside path segment at $10,000 $10,000
12355 Hilltop Drive
14
Natoma Path:Altamont to Black Roadside path on northwest side on Natoma
16 Mountain Road Road from Altamont Road to Black Mountain $35,000 $35,000
Road
15
17 Natoma Path on Black Mountain Roadside path on Southside on Black Mountain $35,000 $35,000
Road Road from Natoma Road easterly •,
16
Bridge on Page Mill Road Construct a pathway bridge on the east side of
18 Pathway near Moon Lane Page Mill Road downhill from Moon Lane,approx. $50,000 $50,000
20 yards off of the Page Mill pavement
17
19 La Loma Drive to Open Space Construct native path around water tank from $45,000+ $0
La Loma to open space TBD
18
Construct a small bridge or low water crossing
20 Aric Lane to Esther Clark Park acceptable to the City of Palo Alto and affected $6,000 $6,000
resource agencies(Fish and Game,SCVWD,
etc.)and install a pathway sign
19
21 Magdalena Road from Construct roadside path on north side of $45,000+ $0
Ravensbury to 1-280 Magdalena from Ravensbury to 1-280 TBD
20
Not currently shown on Pathway Master Path •
22 Dr.Deex's Pathway Plan TBD $0
21
23 Edgerton Pipe Extension New pathway in Edgerton water pipe extension $20,000 $20,000
Pathway easement
22
24 Concepcion Road at Purissima Erosion Control TBD $0
Road
23
25 Viscaino Road Path Install a 2 inch AC berm to separate the road from TBD $0
the pathway
24
Bengineedng\PATHWAYS\Pathways Capital Protects CIP 05252005 DAVE REVISED 6-8-5 Page 2 of 3
TOWN OF LOS ALTOS HILLS PATHWAY CIP 2005 SUMMARY SHEET
B C D F G H I J K
LD. Location Project Description FY 2005-06 FY 2006-07 FY 2007-08 FY 2008-09 FY 2009-10 TOTAL
25 Number
26 Clausen Court to Dawnridge Reduce cross slope,clear and improve path next $10,000 $10,000
Drive to Freeway
26
27
El Monte Road to Magdalena Construct native path adjacent 1-280 TBD $0
Road
27
Moody Road Path&
28 Bike Accommodation Standard path and bike accommodation $235,000 $235,000
28 (Segment 1) 111,
29 Foothill College Path Standard decomposed granite path,8'AC Bike $280,000 $280,000
(Segment 2) Path and non-vehicular bridge
29
Add signalized ped x-ing at eastbound
El Monte Road and approaches to both Stonebrook Drive and Foothill
30 Stonebrook Drive Intersection College.Ped signals,interconnect conduit, $165,000 $165,000
(Segment 3) marking,new path south side of Moody between
30 Stonebrook Avenue and Foothill College .
Re-striping between Provide standard paths on both sides,bike
31 Route 280 Ramps accommodation with outside shoulders,reduce El $70,000 $70,000
(Segment 4) Monte Road to one through lane in each direction
31 between ramps
El Monte Road- Provide standard path on both sides,bike
Voorhees Drive to Summerhill
32 accommodation in shoulders,and signal $235,000 $235,000
Avenue interconnect system
32 (Segment 5) r
LOCAL FUNDS 185,000 171,000 90,000 100,000 370,000 916,000
33 .
EXTERNAL FUNDS 200,000 640,000 840,000
34
TOTAL COSTS 385,000 811,000 90,000 100,000 370,000 1,756,000
35
•
L-\engineering\PATHWAYS\Pathways Capital Projects CIP 05252005 DAVE REVISED 6-6-5 Page 3 of 3