HomeMy WebLinkAbout04-08 • •
RESOLUTION NO. 4-0 8
A RESOLUTION OF THE CITY COUNCIL
OF THE TOWN OF LOS ALTOS HILLS
AWARDING A CONTRACT FOR PREPARATION OF CONSTRUCTION
DRAWINGS FOR THE EL MONTE ROAD/FOOTHILL COLLEGE PATHWAY
AND BICYCLE LANE (SEGMENT 3)
WHEREAS, the Town of Los Altos Hills appropriated $600,000.00 for the 3rd and final
segment of the El Monte Road/Foothill College Segment Pathway and Bicycle Lane; and
WHEREAS, CSG Consultants submitted the attached PS & E proposal at the request of
the City Manager; and
WHEREAS, the staff has reviewed the proposal and recommends that the contract for
said project be awarded to, CSG Consultants for the amount of $64,402.00 including
contingency;
NOW, THEREFORE, BE IT RESOLVED by the City Council of the Town of Los
Altos Hills that the City Manager is hereby authorized and directed to execute the
awarded contract to the above-named firm on behalf of the To of Los Altos Hills.
AA/
PASSED PASSED AND ADOPTED this ( day o Al 1 08.
\ �
By: / _
M• ,or 1
ATTEST:
)
Ci Clerk
• •
TO: Cyrus Kianpour
41;(
f(�.i -. i 5
FROM: Ed Slintak
Ot %IS"
corj DATE: 11 December 2007
SUBJECT: Los Altos Hills, Segment 3 Pathway
CSG Project No. LOSAL 07-051
Attached is the level of effort estimate for the subject project to complete plans,
specifications and estimate. Scope of work includes:
• Topographic survey
• Conversion of the existing median into a pathway median similar to the segment to the
east. Installation of ADA compliant ramps where necessary.
• Construction of a new median island on the western side of the College Loop Road
intersection. This median island will provide a pedestrian refuge on the eastern side and
the western side will provide a location for installation of an entry monument sign.
• Construction of a new sidewalk along the northern side of El Monte between Stonebrook
Road and College Loop Road. New sidewalk may be constructed of AC, any retaining
walls necessary shall be of wood construction.
• Revise the two existing traffic signals at College Loop and Stonebrook intersections.
Revisions to include addition of pedestrian phases as required, revisions to phase
diagrams to accommodate new ped phases and revisions to poles and signal heads as
required.
• Landscape and irrigation design for the new median area(s) and landscape and irrigation
for the Segment 2 pathway area through the Foothill College campus.
,1
Assumptions include:
• Electronic versions of the construction plans for Segment 2 Pathway will be made
available to use as base sheets for landscape design.
• The Town will provide as-built plans for the two existing signal systems. As-built
information to include existing phasing, equipment schedule and wiring diagram and
schedule.
• Details for foundation requirements (if any) for the new entry monument will be
provided by the Town in a timely manner. Size and other general design
requirements will be provided by the Town, including electrical requirements.
• No other remedial design for existing curbs,pavement, etc. is included in the scope of
this project.
• The Town will provide an electronic copy of their boiler plate specifications to be
used for the project.
• Assistance during bidding and construction support and inspection are not included as
part of this scope and will be defined as a later date.
• Assumes that the existing signal controllers and electrical service equipment is
adequate and will not have to be replaced.
- The design cost estimate for this project is $61,402, which includes the landscaping
subconsultant. In addition, we are suggesting a contingency fund of$3,000 for the cost of
reproduction of the PS&E package, if the printing and distribution is handled by CSG.
1700 South Amphlett Boulevard,3r0 Floor;San Mateo,CA 94402
Phone: 650-522-2500 Fax: 650-522-2599
Email:csgstaff@csgengr.com Online at www.csgwebsite.com
A
•
r
Los Alto Hills -Segment 3 Pathway Design
RESOURCE ALLOCATION ESTIMATE -
st
0
a
c c d
Task Description Tad d `0 = 0 0 •0 as c V (4 Totals
C- w a. a) o Igo c w w E A C
'V C 0 C •0 c u C p) _C C d d
C 'C u) 'N5) .(7)
N •5 •C 5)0 cL i' E
'C C CDC WC WC QC Co ' 7 'a
0- W ,_f/) W Q W Q W Cl W W I-- N U) , <
Category Notes $170 $140 $125 $110 $110 $90 $200 $75 Hours Cost
TASK 1-Preliminary Design,"&Field'Surveying Services'
Project setup/Management 2 2 $280
Field Surveys -_ 8 s 8 $1,600 •
Reduce Field Notes/Create Base Sheets 8 8 $880
Layout/Design 8 24 8 40 $4,640
Cover Sheet 6 6 $660
Details 4 12 12 28 $3,200
Meetings 2 2 2 6 $840
Specifications 2 8 10 $1,160
Signal Mods 12 24 36 $3,840
Printing/Delivery 0
Task 1 -Subtotal 2 30 0 46 34 I 24 I 8 0 0 144 $17,100
TASK 2-Detailed Design
Layout/Design 8 24 _ 32 $3,760
Structural Calcs 4 _ 4 $560
Details 4 20 8 32 $3,640
Meetings 2 2 2 6 $840
Specifications/QTO 4 4 _ 8 $940
Signal Mods 16 8 32 56 $6,000 •
0
•
Task 2-Subtotal 2 34 4 50 16 32 0 0 0 138 $15,740
TASK 3'=Final Design ' ` ° ''' \ ., ¢ ' 4""
t"
Layout/Design 5 10 15 $1,800
Details 12 8 20 $2,200
Meetings 0 $0
Specifications/QTO 2 2 4 $470
Signal Mods 4 4 8 $1,000
0 $0
0 $0
Task 3-Subtotal 0 9 2 24 12 0 0 0 0 47 $5,470
CSG Consultants,Inc.
Proposal by Task(no CA) 10-24-07.xls Page 1 12/12/2007
O
co 3 °•
c co 0-
Task
Task Description Tv `ma, ` c `m `m ` •� c v Totals
0. G) i d d d C a) co LN. >,
C 0c 8 .c . c O) C_ C C d d
C 'C �Q) N 5) 'co •a •N .� 11 v d •E
'EC WC N C N C d C C G) ' 7 V
d W d) W < W < W O W W H N f/) <
Category !Notes, $170 $140 $125 $110 $110 $90 $200 $75 Hours Cost
Total All Tasks 4 73 6 120 62 56 8 0 0 329 $38,310
Consultants-and Testing
Landscape design $23,092
Subtotal Consultants&Testing $23,092 •
TOTAL FEE/•BUDGET
$61,402
Reimbursables,and other Direct Costs(Estimate)
Reproduction of submittal sets and/or reports Reproduction of PS&E package for distribution to bidders etc. $3,000
Delivery Charges
Assigned Vehicles($0.50/mi)
Subtotal Estimated Reimbursable Costs $3,000
•
CSG Consultants, Inc.
Proposal by Task(no CA) 10-24-07.xls Page 2 12/12/2007