Loading...
HomeMy WebLinkAbout04-08 • • RESOLUTION NO. 4-0 8 A RESOLUTION OF THE CITY COUNCIL OF THE TOWN OF LOS ALTOS HILLS AWARDING A CONTRACT FOR PREPARATION OF CONSTRUCTION DRAWINGS FOR THE EL MONTE ROAD/FOOTHILL COLLEGE PATHWAY AND BICYCLE LANE (SEGMENT 3) WHEREAS, the Town of Los Altos Hills appropriated $600,000.00 for the 3rd and final segment of the El Monte Road/Foothill College Segment Pathway and Bicycle Lane; and WHEREAS, CSG Consultants submitted the attached PS & E proposal at the request of the City Manager; and WHEREAS, the staff has reviewed the proposal and recommends that the contract for said project be awarded to, CSG Consultants for the amount of $64,402.00 including contingency; NOW, THEREFORE, BE IT RESOLVED by the City Council of the Town of Los Altos Hills that the City Manager is hereby authorized and directed to execute the awarded contract to the above-named firm on behalf of the To of Los Altos Hills. AA/ PASSED PASSED AND ADOPTED this ( day o Al 1 08. \ � By: / _ M• ,or 1 ATTEST: ) Ci Clerk • • TO: Cyrus Kianpour 41;( f(�.i -. i 5 FROM: Ed Slintak Ot %IS" corj DATE: 11 December 2007 SUBJECT: Los Altos Hills, Segment 3 Pathway CSG Project No. LOSAL 07-051 Attached is the level of effort estimate for the subject project to complete plans, specifications and estimate. Scope of work includes: • Topographic survey • Conversion of the existing median into a pathway median similar to the segment to the east. Installation of ADA compliant ramps where necessary. • Construction of a new median island on the western side of the College Loop Road intersection. This median island will provide a pedestrian refuge on the eastern side and the western side will provide a location for installation of an entry monument sign. • Construction of a new sidewalk along the northern side of El Monte between Stonebrook Road and College Loop Road. New sidewalk may be constructed of AC, any retaining walls necessary shall be of wood construction. • Revise the two existing traffic signals at College Loop and Stonebrook intersections. Revisions to include addition of pedestrian phases as required, revisions to phase diagrams to accommodate new ped phases and revisions to poles and signal heads as required. • Landscape and irrigation design for the new median area(s) and landscape and irrigation for the Segment 2 pathway area through the Foothill College campus. ,1 Assumptions include: • Electronic versions of the construction plans for Segment 2 Pathway will be made available to use as base sheets for landscape design. • The Town will provide as-built plans for the two existing signal systems. As-built information to include existing phasing, equipment schedule and wiring diagram and schedule. • Details for foundation requirements (if any) for the new entry monument will be provided by the Town in a timely manner. Size and other general design requirements will be provided by the Town, including electrical requirements. • No other remedial design for existing curbs,pavement, etc. is included in the scope of this project. • The Town will provide an electronic copy of their boiler plate specifications to be used for the project. • Assistance during bidding and construction support and inspection are not included as part of this scope and will be defined as a later date. • Assumes that the existing signal controllers and electrical service equipment is adequate and will not have to be replaced. - The design cost estimate for this project is $61,402, which includes the landscaping subconsultant. In addition, we are suggesting a contingency fund of$3,000 for the cost of reproduction of the PS&E package, if the printing and distribution is handled by CSG. 1700 South Amphlett Boulevard,3r0 Floor;San Mateo,CA 94402 Phone: 650-522-2500 Fax: 650-522-2599 Email:csgstaff@csgengr.com Online at www.csgwebsite.com A • r Los Alto Hills -Segment 3 Pathway Design RESOURCE ALLOCATION ESTIMATE - st 0 a c c d Task Description Tad d `0 = 0 0 •0 as c V (4 Totals C- w a. a) o Igo c w w E A C 'V C 0 C •0 c u C p) _C C d d C 'C u) 'N5) .(7) N •5 •C 5)0 cL i' E 'C C CDC WC WC QC Co ' 7 'a 0- W ,_f/) W Q W Q W Cl W W I-- N U) , < Category Notes $170 $140 $125 $110 $110 $90 $200 $75 Hours Cost TASK 1-Preliminary Design,"&Field'Surveying Services' Project setup/Management 2 2 $280 Field Surveys -_ 8 s 8 $1,600 • Reduce Field Notes/Create Base Sheets 8 8 $880 Layout/Design 8 24 8 40 $4,640 Cover Sheet 6 6 $660 Details 4 12 12 28 $3,200 Meetings 2 2 2 6 $840 Specifications 2 8 10 $1,160 Signal Mods 12 24 36 $3,840 Printing/Delivery 0 Task 1 -Subtotal 2 30 0 46 34 I 24 I 8 0 0 144 $17,100 TASK 2-Detailed Design Layout/Design 8 24 _ 32 $3,760 Structural Calcs 4 _ 4 $560 Details 4 20 8 32 $3,640 Meetings 2 2 2 6 $840 Specifications/QTO 4 4 _ 8 $940 Signal Mods 16 8 32 56 $6,000 • 0 • Task 2-Subtotal 2 34 4 50 16 32 0 0 0 138 $15,740 TASK 3'=Final Design ' ` ° ''' \ ., ¢ ' 4"" t" Layout/Design 5 10 15 $1,800 Details 12 8 20 $2,200 Meetings 0 $0 Specifications/QTO 2 2 4 $470 Signal Mods 4 4 8 $1,000 0 $0 0 $0 Task 3-Subtotal 0 9 2 24 12 0 0 0 0 47 $5,470 CSG Consultants,Inc. Proposal by Task(no CA) 10-24-07.xls Page 1 12/12/2007 O co 3 °• c co 0- Task Task Description Tv `ma, ` c `m `m ` •� c v Totals 0. G) i d d d C a) co LN. >, C 0c 8 .c . c O) C_ C C d d C 'C �Q) N 5) 'co •a •N .� 11 v d •E 'EC WC N C N C d C C G) ' 7 V d W d) W < W < W O W W H N f/) < Category !Notes, $170 $140 $125 $110 $110 $90 $200 $75 Hours Cost Total All Tasks 4 73 6 120 62 56 8 0 0 329 $38,310 Consultants-and Testing Landscape design $23,092 Subtotal Consultants&Testing $23,092 • TOTAL FEE/•BUDGET $61,402 Reimbursables,and other Direct Costs(Estimate) Reproduction of submittal sets and/or reports Reproduction of PS&E package for distribution to bidders etc. $3,000 Delivery Charges Assigned Vehicles($0.50/mi) Subtotal Estimated Reimbursable Costs $3,000 • CSG Consultants, Inc. Proposal by Task(no CA) 10-24-07.xls Page 2 12/12/2007