HomeMy WebLinkAbout8.1 TOWN OF LOS ALTOS HILLS
NOTICE OF APPROVAL OF SITE DEVELOPMENT
PERMIT
(FAST-TRACK REVIEW)
NOTICE IS HEREBY GIVEN that the Planning Director has approved the following
application at a Fast Track Hearing on Tuesday, April 6, 2004:
LANDS OF BUXTON, 27850 Via Feliz (250-03-ZP-SD); A request for
a Site Development Permit for a 6,489 square foot new residence
(maximum height 24 feet) and remodel.
Project details are outlined on the reverse side of the notice.
All applications approved by the Planning Director, at a Fast-track meeting, are subject to
a 22 day appeal period. Any member of the public may appeal the Planning Director's
decision on the aforementioned project by submitting a letter requesting appeal and the
justification for appeal, and submitting a fee of $375 and deposit of $625. The appeal
letter and fees must be submitted not later than 5:00 p.m. on April 28, 2004.
For further information, contact the Planning Department, 26379 Fremont Road, Los
Altos Hills, CA 94022, (650) 941-7222.
Carl Cahill,Planning Director
Town of Los Altos Hills
NOTICE DATE: April 13, 2004
Town Of Los Altos Hills April 6,2004
Site Development Hearing Fact Sheet
Project Description: New residence
File Number: 250-03-ZP-SD
Site Address: 27850 Via Feliz
Owner(s): Chad and Lynn Buxton
Staff Planner: Angelica Herrera Olivera,Assistant Planner
Site Data
Net Lot Area: 1.555 acres
Average Slope: 9.1 %
Lot Unit Factor: 1.555
Floor and Development Area:
Area Maximum Proposed Existing Increase Left
Development 23,325 10,598 8,965 1,633 12,727
Floor 9,330 6,489 3,949 2,540 2,841
Height: Maximum Proposed
On Vertical Plane 27 feet 24 feet
Lowest to Highest 35 feet 25 feet, 6 inches—including chimneys
Setbacks: Minimum Proposed
Front 40 ft. 40 ft., legal nonconforming roof eaves
Sides 30 ft. 30 ft.
Rear 30 ft. +30 ft.
Exterior Materials:
Stucco finish exterior with earth tone paint and stone veneer,wall mounted wood arbors,
and asphalt/composition roof shingles.
Parking: Required spaces: 4, 4 out of setbacks.
Proposed: 4 (3 garage spaces), out of the setbacks
Grading: 350 cubic yards of cut
400 cubic yards of fill
0 cubic yards of export
Sewer/Septic: Septic System
Environmental Design Committee: All trees shall be fenced at the dripline prior to
issuance of demolition or building permits.
Pathway Committee: Pay pathway fee of$45.00 per lineal foot of the average width of
the property or$5,000.00,whichever is greater.