Loading...
HomeMy WebLinkAbout8.1 TOWN OF LOS ALTOS HILLS NOTICE OF APPROVAL OF SITE DEVELOPMENT PERMIT (FAST-TRACK REVIEW) NOTICE IS HEREBY GIVEN that the Planning Director has approved the following application at a Fast Track Hearing on Tuesday, April 6, 2004: LANDS OF BUXTON, 27850 Via Feliz (250-03-ZP-SD); A request for a Site Development Permit for a 6,489 square foot new residence (maximum height 24 feet) and remodel. Project details are outlined on the reverse side of the notice. All applications approved by the Planning Director, at a Fast-track meeting, are subject to a 22 day appeal period. Any member of the public may appeal the Planning Director's decision on the aforementioned project by submitting a letter requesting appeal and the justification for appeal, and submitting a fee of $375 and deposit of $625. The appeal letter and fees must be submitted not later than 5:00 p.m. on April 28, 2004. For further information, contact the Planning Department, 26379 Fremont Road, Los Altos Hills, CA 94022, (650) 941-7222. Carl Cahill,Planning Director Town of Los Altos Hills NOTICE DATE: April 13, 2004 Town Of Los Altos Hills April 6,2004 Site Development Hearing Fact Sheet Project Description: New residence File Number: 250-03-ZP-SD Site Address: 27850 Via Feliz Owner(s): Chad and Lynn Buxton Staff Planner: Angelica Herrera Olivera,Assistant Planner Site Data Net Lot Area: 1.555 acres Average Slope: 9.1 % Lot Unit Factor: 1.555 Floor and Development Area: Area Maximum Proposed Existing Increase Left Development 23,325 10,598 8,965 1,633 12,727 Floor 9,330 6,489 3,949 2,540 2,841 Height: Maximum Proposed On Vertical Plane 27 feet 24 feet Lowest to Highest 35 feet 25 feet, 6 inches—including chimneys Setbacks: Minimum Proposed Front 40 ft. 40 ft., legal nonconforming roof eaves Sides 30 ft. 30 ft. Rear 30 ft. +30 ft. Exterior Materials: Stucco finish exterior with earth tone paint and stone veneer,wall mounted wood arbors, and asphalt/composition roof shingles. Parking: Required spaces: 4, 4 out of setbacks. Proposed: 4 (3 garage spaces), out of the setbacks Grading: 350 cubic yards of cut 400 cubic yards of fill 0 cubic yards of export Sewer/Septic: Septic System Environmental Design Committee: All trees shall be fenced at the dripline prior to issuance of demolition or building permits. Pathway Committee: Pay pathway fee of$45.00 per lineal foot of the average width of the property or$5,000.00,whichever is greater.