RESOLUTION NO. 79-94
RESOLUTION OF
THE CITY COUNCIL OF
THE TOWN OF LOS ALTOS HILLS ADOPTING THE
CAPITAL IMPROVEMENT BUDGET FOR FISCAL YEAR 1994-95
WHEREAS, the City Council of the Town of Los Altos Hills has
received and completed its review of the proposed 1994-95 Capital
Improvement Budget and now desires to adopt the Capital
Improvement Budget for the 1994-95 Fiscal Year;
NOW, THEREFORE, the City Council of the Town of Los Altos
Hills does RESOLVE as follows:
Section 1. The City Council does hereby approve and adopt
the Capital Improvement Budget for the Town for Fiscal Year 1994-
95, as set forth in Exhibit _A hereto.
Section 2 . The amount of the 1994-95 Fiscal Year Capital
Improvement Budget for each account area of the Budget may be
drawn upon in the form of warrants issued for payment of demands
and certified in accordance with the provisions of California
Government Code Sections 37208 and 37209.
Section 3. The City Manager shall periodically report to
the City Council the amount and classification of revenues
received and expenditures made.
Section 4. A copy of the adopted Budget, signed by the
Mayor and attested to by the City Clerk, shall be kept on file
with the City Clerk of the Town of Los Altos Hills, as the
official Capital Improvement Budget of the Town of Los Altos
Hills for the 1994-95 Fiscal Year.
REGULARLY passed and adopted this 17th day of October,
1994.
By:
Mayo
ATTEST:
City Cle
<SJ>H:\DATA\PB\MAS\14949000.W50
10/14/94
0 0
TABLE OF CONTENTS
Page
1993/94 CIP Project Status 1
1994/95 Capital Budget Funding Summary 2
1994/95 Capital Budget Detail Summary 3
Project Budgets
Byrne Preserve 4
Pathways 5
Pathways -Lupine to Elena 6
Pathways-Merrill 7
Pathways-Middlefork 8
Pathways-Switchbacks 9
Pathways -Via Ventana 10
Pathways -Zappettini 11
Pathways -Miscellaneous 12
Emergency Generator 13
Stonebrook Pathway 14
Page Mill Land Acquisition 15
Edith Park (Creek Park) 16
Town Hall Improvements 17
Storm Drain Management 93-94 18
Pavement Management 94 19
Road/Path Sign Repair/Upgrade 20
Moody Path/Shoulder Reconstruction 21
El Monte/Stonebrook Signal 22
Pavement Management 95 23
Robleda Road Shoulder/Path Reconstruction 24
Storm Drain Improvements 95 25
Driveway Roughening 95 26
El Monte Slough Wall 27
El Monte Median Project 28
McCulloch Path to Magdalena 29
Capital Improvement Budget of the Town of Los Altos Hills a proved 10/17/94
2
ATTEST Ma Dauber
cth..-3 )
___(111)22) ' ' 4-1-j.------
City Clerk
• •
1993/94 CIP PROJECT STATUS October 1, 1994
Project Status
Byrne Preserve Fence Complete
Pathways Complete (this was the Fernhill Path project)
Pathways-Lupine to Elena Staff and Council member will negotiate with
y p property owner for easement. Staff will redesign to
lower cost.
Pathways-Merrill Tabled—waiting for acquisition of easement
Pathways-Middlefork 90%complete--scheduled for completion in
October
Pathways-Switchbacks Must be surveyed—construction anticipated
FY95/96
Pathways-Via Ventana Complete
Pathways-Zappettini Tabled—waiting for acquisition of easement
Emergency Generator Complete
Stonebrook Pathway Project Complete
Driveway Roughening(FY92/93) Complete
Driveway Roughening(FY93/94) Complete
Page Mill Land Acquisition Dropped—property sold well above budget
Edith Park(Creek Park) Under negotiation with owner
Town Hall Improvements Space needs assessment is underway
Storm Drain Management FY 93/94 Under contract--construction scheduled for October
Pavement Management 93 Complete
Pavement Management 94 Construction underway-25%complete at this
writing
Road/Path Sign Repair/Upgrade Staff recommending deappropriation
Moody Path/Shoulder Reconstruction Under contract--construction scheduled for October
El Monte/Stonebrook Signal Equipment has arrived--construction in October
1
•
•
1994-95 CAPITAL BUDGET
FUNDING SUMMARY
In ($000)
GENERAL,STREET,AND DRAINAGE FUNDS
OPERATING BEGINNING
NET REVENUE RESERVES
$4,268
FY95 OPERATING BUDGET:
REVENUE $2,725
EXPENSE/TRANSFERS 2,187
NET REVENUE $538
TOTAL
NEW PROJECT APPROPRIATIONS
APPROPRIATIONS FROM: (538) (256) $794
REMAINDER $0 $4,012
GENERAL SERVICES FUND
OPERATING BEGINNING
NET REVENUE RESERVES
$0 $177
TOTAL
NEW PROJECT APPROPRIATIONS
APPROPRIATIONS FROM: (5 0) $50
REMAINDER $0 $127
o Beginning reserves exclude project carryovers.
2
• •
1994-95 CAPITAL BUDGET
DETAIL SUMMARY
Prior June 94-95 94-95 Total
OPEN PROJECTS: Approp. Carryover Approp. Spending Approp.
GENERAL FUND PROJECTS
Byrne Preserve 2-764 $29,975 $2,700 -$2,700 $0 $27,275
Pathways - Lupine to Elena 2-781 40,000 40,000 40,000 40,000
Pathways - Merrill 2-782 8,000 6,400 8,000
Pathways - Middlefork 2-783 8,000 7,856 20,000 27,856 28,000
Pathways - Switchbacks 2-784 3,000 3,000 3,000 3,000
Pathways - Via Ventana 2-785 2,000 1 ,943 -1 ,943 57
Pathways - Zappettini 2-786 6,000 4,302 6,000
Emergency Generator 2-771 35,000 6,820 -2,752 4,068 32,248
Stonebrook Pathway Project 2-772 97,000 691 -691 96,309
Driveway Roughening Path.93-94 c2-773 16,078 9,000 -600 8,400 15,478
Edith Park 2-787 50,000 49,980 -47,480 2,500 2,520
El Monte Median Project
Pathways - McCulloch to Magdalena 10,000 10,000 10,000
General Fund Projects 295,053 132,692 -26,166 95,824 268,887
GENERAL SERVICE PROJECTS
Town Hall Improvements 45-750 55,000 53,854 50,000 11 ,455 105,000
General Service Projects 55,000 53,854 50,000 11 ,455 105,000
DRAINAGE PROJECTS
Storm Drain Management 93 3-717 200,000 190,776 190,776 200,000
Storm Drain Improvements 95 125,000 125,000 125,000
Drainage Projects 200,000 190,776 125,000 315,776 325,000
STREET PROJECTS
Pavement Management-93 7-716 225,000 12 -12 224,988
Pavement Management-94 7-715 400,000 395,945 395,945 400,000
Road /Path Sign Repair/Upgrade 7-760 5,000 4,699 -4,699 301
Moody Path/Shoulder Reconstruct 7-775 130,000 117,408 117,408 130,000
El Monte/Stonebrook Signal 7-776 12,000 12,000 12,000 12,000
Pavement Management 95 500,000 500,000 500,000
Robleda Shoulder/Path Reconstr. 200,000 200,000 200,000
El Monte Slough Wall
Street Fund Projects 772,000 530,064 695,289 1 ,225,353 1 ,467,289
Total General Fund 295,053 132,692 -26,166 95,824 268,887
Total Drainage Fund 200,000 190,776 125,000 315,776 325,000
Total Street Fund 772,000 530,064 695,289 1 ,225,353 1 ,467,289
Subtotal 1 ,267,053 853,532 794,123 1 ,636,953 2,061 ,176
Total General Services Fund 55,000 53,854 50,000 11 ,455 105,000
ALL FUNDS $1 ,322,053 $907,386 $844,123 $1 ,648,408 $2,166,176
3
i •
1994-1995 CAPITAL BUDGET
CAPITAL PROJECT: BYRNE PRESERVE
TOTAL PROJECT COST: $27,275
ANTICIPATED YEAR OF CONSTRUCTION: Complete
SOURCE(S)OF FUNDING:
ACCOUNT NUMBER:
PROJECT DESCRIPTION:
This project has been complete for over a year. Staff recommends de-appropriation
of the remaining funds.
Funding Proposed Five Year
History Budget Funding Plan
Prior Appropriations 29,975 29,975
Prior Spending -27,275
June Carryover 2,700
Committed Funds 0
September Balance 2,700 2,700
Proposed Appropriations FY 94-95 -2,700 -2,700
New Spending 94-95
Expected Carryover September 1995 0
Anticipated Future Programming
FY 95-96
FY 96-97
FY 97-98
FY 98-99
Total Project Cost $27,275
4
i •
1994-1995 CAPITAL BUDGET
CAPITAL PROJECT: PATHWAYS
TOTAL PROJECT COST: $4,900
ANTICIPATED YEAR OF CONSTRUCTION: Complete
SOURCE(S)OF FUNDING:
ACCOUNT NUMBER:
PROJECT DESCRIPTION:
This project, which was the Fernhill to Frampton Court pathway project, is complete.
Funding Proposed Five Year
History Budget Funding Plan
Prior Appropriations 4,900 4,900
Prior Spending -4,900
June carryover 0
Committed Funds 0
September Balance 0 • •
Proposed Appropriations FY 94-95 0 0
New Spending FY94-95 0
Expected Carryover September 1995 0
Anticipated Future Programming
FY 95-96
FY 96-97
FY 97-98
FY 98-99
Total Project Cost $4,900
5
• •
1994-1995 CAPITAL BUDGET
CAPITAL PROJECT: PATHWAYS-LUPINE TO ELENA
TOTAL PROJECT COST: $40,000
ANTICIPATED YEAR OF CONSTRUCTION: FY 94-95
SOURCE(S)OF FUNDING: General Fund
ACCOUNT NUMBER: 781
PROJECT DESCRIPTION:
The design was completed this past summer and bids were solicited. The bids received
were substantially higher than programmed for the project. This is due to additional
construction items that were needed for the project (such as more retaining wall
and pavement) as well as the limited access for construction, making the project
difficult to build. Staff will negotiate with the affected property owner on the
necessary easement and will modify the project as discussed with the Council to
bring the project within budget. Therefore, no further appropriations are necessary.
Funding Proposed Five Year
History Budget Funding Plan
Prior Appropriations 40,000 40,000
Prior Spending 0
June Carryover 40,000
Committed Funds -3,900
Balance 36,100 36,100 •
Proposed Appropriations FY 94-95 0 0
New Spending 94-95 -36,100
Expected Carryover September 1995 0
Anticipated Future Programming
FY 95-96 0
FY 96-97 0
FY 97-98 0
FY 98-99 0
Total Project Cost $40,000
6
•
1994-1995 CAPITAL BUDGET
CAPITAL PROJECT: PATHWAYS-MERRILL
TOTAL PROJECT COST: $10,000
ANTICIPATED YEAR OF CONSTRUCTION: FY 95-96
SOURCE(S)OF FUNDING: General Fund
ACCOUNT NUMBER: 782
PROJECT DESCRIPTION:
This project has been tabled due to the lace' of a recorded pathway easement on the
property. Acquisition of the easement is being pursued by the City Attorney. The
Trail Center remains interested in constructing the path. Staff recommends that this
project remain on the program until the easement issue is resolved. Additional funds
may need to be appropriated in the future due to legal fees or additional survey needs.
Funding Proposed Five Year
History Budget Funding Plan
Prior Appropriations 8,000 8,000
Prior Spending -1,600
June carryover 6,400
Committed Funds 0
September Balance 6,400 6,400
Proposed Appropriations FY 94-95 0 0
New Spending FY94-95 0
Expected carryover September 1995 6,400
Anticipated Future Programming
FY 95-96 0
FY 96-97 2,000
FY 97-98 0
FY 98-99 0
Total Project Cost $10,000
7
i •
1994-1995 CAPITAL BUDGET
CAPITAL PROJECT: PATHWAYS-MIDDLEFORK
TOTAL PROJECT COST: $28,000
ANTICIPATED YEAR OF CONSTRUCTION: Capital year 93-94
SOURCE(S)OF FUNDING: General Fund
ACCOUNT NUMBER: 783
PROJECT DESCRIPTION:
This project is nearly complete with the exception of the driveway crossing and the
paving of the swale. The delay has been due to back ordered parts which have recently
arrived. The project is now scheduled to be complete by early October.
Funding Proposed Five Year
History Budget Funding Plan
Prior Appropriations 8,000 8,000
Prior Spending -144
June carryover 7,856
Committed Funds -24,135
September Balance -16,279 -16,279
Proposed Appropriations FY 94-95 20,000 20,000
New Spending FY94-95 -3,721
Expected carryover September 1995 0
Anticipated Future Programming
FY 95-96 0
FY 96-97 0
FY 97-98 0
FY 98-99 0
Total Project Cost $28,000
•
8
1994-1995 CAPITAL BUDGET
CAPITAL PROJECT: PATHWAYS-SWITCHBACKS
TOTAL PROJECT COST: $8,000
ANTICIPATED YEAR OF CONSTRUCTION: FY 95-96
SOURCE(S)OF FUNDING: General Fund
ACCOUNT NUMBER: 2-756
PROJECT DESCRIPTION:
Through field investigations, the Public Works Department has determined that
switchbacks in the Golden Hills Lane area would not be feasible. Further scoping of
the project with the Pathway Committee has shown that the remaining projects are
more extensive than previously known. Also, the Town's experience with survey
costs over the past year has shown that more dollars will be required to survey the
remaining three projects. Staff proposes to carry the project forward as much as
possible during FY 94-95 with the current funding, with additional funding
anticipated in FY 95-96.
Funding Proposed Five Year
History Budget Funding Plan
Prior Appropriations 3,000 3,000
Prior Spending 0
June carryover 3,000
Committed Funds 0
September Balance 3,000 3,000
Proposed Appropriations FY 94-95 0
New Spending FY94-95 -3,000
Expected carryover September 1995 0
Anticipated Future Programming
FY 95-96 5,000
FY 96-97 0
FY 97-98 0
FY 98-99 0
Total Project Cost $8,000
9
• •
•
1994-1995 CAPITAL BUDGET
CAPITAL PROJECT: PATHWAYS -VIA VENTANA
TOTAL PROJECT COST: $57
ANTICIPATED YEAR OF CONSTRUCTION: FY 93-94
SOURCE(S)OF FUNDING: General Fund
ACCOUNT NUMBER: 785
PROJECT DESCRIPTION:
This project was very successful and has been completed. The project was performed
by Staff with only a minor material cost in addition. No legal fees were necessary.
Staff recommends that the City Council de-appropriate the remaining $1,943 back
to the General Fund.
Funding Proposed Five Year
History Budget Funding Plan
Prior Appropriations 2,000 2,000
Prior Spending -57
June Carryover 1,943
Committed Funds
September Balance 1 ,943 1,943
Proposed Appropriations FY 94-95 -1 ,943 -1,943
New Spending 94-95
Expected Carryover September 1995 0
Anticipated Future Programming
FY 95-96
FY 96-97
FY 97-98
FY 98-99
Total Project Cost $57
10
• •
1994-1995 CAPITAL BUDGET
CAPITAL PROJECT: PATHWAYS-ZAPPETTINI
TOTAL PROJECT COST: $6,000
ANTICIPATED YEAR OF CONSTRUCTION: FY 95-96
SOURCE(S)OF FUNDING: General Fund
ACCOUNT NUMBER: 786
PROJECT DESCRIPTION:
During the design process it was discovered that a very small but critical, piece of
pathway easement to build this project had not been granted to the Town. It is not
known when it will be possible to acquire this easement. Staff will contact the
owners this winter in an effort to do so. In the meantime, it is anticipated that the
project could be constructed by the Trail Center with the remaining funds.
Funding Proposed Five Year
History Budget Funding Plan
Prior Appropriations 6,000 6,000
Prior Spending -1 ,698
June carryover 4,302
Committed Funds 0 •
September Balance 4,302 4,302
Proposed Appropriations FY 94-95 0 0
New Spending 94-95 0
Expected carryover September 1995 4,302
Anticipated Future Programming
FY 95-96 0
FY 96-97 0
FY 97-98 0
FY 98-99 0
Total Project Cost $6,000
11
• •
1994-1995 CAPITAL BUDGET
CAPITAL PROJECT: PATHWAYS-MISCELLANEOUS
TOTAL PROJECT COST: $35,000
ANTICIPATED YEAR OF CONSTRUCTION: FY 95-96
SOURCE(S)OF FUNDING: General Fund •
ACCOUNT NUMBER:
PROJECT DESCRIPTION:
The Pathway Committee has requested that the Town program two pathway projects
that may require survey work and the dedication of pathway easements by residents.
The largest of these projects would be an offroad pathway (below the roadway
embankment). between Moon Lane and Country Way. This project would require the
acquisition of easements from several property owners along the route. The other
project is the pathway between the new Middlefork path and Byrd Lane, which may
require survey prior to opening up the route. Staff recommends $10,000 for the
preliminary work, to be done during FY 95-96, with an additional appropriation in
the future anticipated at approximately $25,000 in FY 96-97.
Funding Proposed Five Year
History Budget Funding Plan
Prior Appropriations 0 0
Prior Spending 0
June carryover 0
Committed Funds 0
September Balance 0
Proposed Appropriations FY 94-95 0 0
New Spending FY94-95 0
Expected Carryover September 1995 0
Anticipated Future Programming
FY 95-96 10,000
FY 96-97 25,000
FY 97-98
FY 98-99
Total Project.Cost $35,000
12
• •
1994-1995 CAPITAL BUDGET
CAPITAL PROJECT: EMERGENCY GENERATOR
TOTAL PROJECT COST: $32,248
ANTICIPATED YEAR OF CONSTRUCTION: Complete
SOURCE(S)OF FUNDING:
ACCOUNT NUMBER:
PROJECT DESCRIPTION:
This project is complete.
Funding Proposed Five Year
History Budget Funding Plan
Prior Appropriations 35,000 35,000
Prior Spending -28,180
June Carryover 6,820
Committed Funds -4,068
September Balance 2,752 2,752
Proposed Appropriations FY 94-95 -2,752 -2,752
New Spending 94-95
Expected Carryover September 1995 0
Anticipated Future Programming
FY 95-96
FY 96-97
FY 97-98
FY 98-99
Total Project Cost $32,248
13
• •
1994-1995 CAPITAL BUDGET
CAPITAL PROJECT: STONEBROOK PATHWAY
TOTAL PROJECT COST: $96,309
ANTICIPATED YEAR OF CONSTRUCTION: Complete
SOURCE(S)OF FUNDING: General Fund •
ACCOUNT NUMBER:
PROJECT DESCRIPTION:
The project was completed in the fall of 1993. Staff recommends de-appropriation
of the remaining funds back to the General Fund.
Funding Proposed Five Year
History Budget Funding Plan
Prior Appropriations 97,000 97,000
Prior Spending -96,309
June Carryover 691
Committed Funds
September Balance 691 691
Proposed Appropriations FY 94-95 -691 -691
New Spending 94-95
Expected Carryover September 1995 0
Anticipated Future Programming
FY 95-96
FY 96-97
FY 97-98
FY 98-99
Total Project Cost $96,309
14
• •
1994-1995 CAPITAL BUDGET
CAPITAL PROJECT: PAGE MILL LAND ACQUISITION
TOTAL PROJECT COST: N/A
ANTICIPATED YEAR OF CONSTRUCTION: N/A
SOURCE(S)OF FUNDING:
ACCOUNT NUMBER:
PROJECT DESCRIPTION:
This project was dropped. The funds were transferred to the Edith Park project.
Funding Proposed Five Year
History Budget Funding Plan
Prior Appropriations 50,000 0
Prior Spending 0
June Carryover 0
Committed Funds
September Balance 0 0
Proposed Appropriations FY 94-95 0
New Spending 94-95
Expected Carryover September 1995 0
Anticipated Future Programming
FY 95-96
FY 96-97
FY 97-98
FY 98-99
Total Project Cost $0
15
i •
1994-1995 CAPITAL BUDGET
CAPITAL PROJECT: EDITH PARK
TOTAL PROJECT COST: $2,520
ANTICIPATED YEAR OF CONSTRUCTION: Not known
SOURCE(S)OF FUNDING: General Fund
ACCOUNT NUMBER:
PROJECT DESCRIPTION:
Prior appropriations of $50,000 have been made to this project. The Council has
negotiated with the property owner for possible purchase of the project, and has
not reached an agreement. Staff recommends the City Council de-appropriate the
remaining funds.
Funding Proposed Five Year
History Budget Funding Plan
Prior Appropriations 50,000 50,000
Prior Spending -20
June Carryover 49,980
Committed Funds -2,500
September Balance 47,480 47,480
Proposed Appropriations FY 94-95 -47,480 -47,480
New Spending 94-95
Expected Carryover September 1995 0
Anticipated Future Programming
FY 95-96
FY 96-97
FY 97-98
FY 98-99
Total Project Cost $2,520
16
i i
1994-1995 CAPITAL BUDGET
CAPITAL PROJECT: TOWN HALL IMPROVEMENTS
TOTAL PROJECT COST: Not known
ANTICIPATED YEAR OF CONSTRUCTION: FY 95-96 or FY 96-97
SOURCE(S)OF FUNDING: General Services Fund
ACCOUNT NUMBER: 45-750
PROJECT DESCRIPTION:
Town Staff is currently coordinating with the space planning architect on the space
needs assessments of Town Hall and how those needs might be addressed. Currently
there is not enough information to fix a budget for the project. Staff recommends
that the Council appropriate an incremental addition to the budget as deemed
appropriate.
Funding Proposed Five Year
History Budget Funding Plan
Prior Appropriations 55,000 55,000
Prior Spending -1 ,146
June Carryover 53,854
Committed Funds -11 ,455
September Balance 42,399 42,399
Proposed Appropriations FY 94-95 50,000 50,000
New Spending 94-95
Expected Carryover September 1995 92,399
Anticipated Future Programming
FY 95-96
FY 96-97
FY 97-98
FY 98-99
Total Project Cost $105,000
17
• O
1994-1995 CAPITAL BUDGET
CAPITAL PROJECT: STORM DRAIN MANAGEMENT(FY 93-94)
TOTAL PROJECT COST: $200,000
ANTICIPATED YEAR OF CONSTRUCTION: FY 94-95
SOURCE(S)OF FUNDING: Storm Drain In-Lieu/General Fund
ACCOUNT NUMBER: 3-717
PROJECT DESCRIPTION:
This previously authorized project has been awarded and the Town is awaiting return
of the signed contract and bonds. Construction will occur through October. The bids
on this project were quite low, which should result in a net savings to the Town. Some
of the remaining funds will be used for construction staking and inspection.
Funding Proposed Five Year
History Budget Funding Plan
Prior Appropriations 200,000 200,000
Prior Spending -9,224
June carryover 190,776
Committed Funds -129,501
September Balance 61 ,275 61 ,275
Proposed Appropriations FY 94-95 0 0 0
New Spending 94-95 -61 ,275
Expected carryover September 1995 0
Anticipated Future Programming
FY 95-96
FY 96-97
FY 97-98
FY 98-99
Total Project Cost $200,000
18
•
1994-1995 CAPITAL BUDGET
CAPITAL PROJECT: PAVEMENT MANAGEMENT 94
TOTAL PROJECT COST: $400,000
ANTICIPATED YEAR OF CONSTRUCTION: FY 94-95
SOURCE(S)OF FUNDING: Gas Taxes/General Fund
ACCOUNT NUMBER: 715
PROJECT DESCRIPTION:
After some contractor delays, this project is now underway. The focus this year is
on some of the Town's most heavily traveled streets including Page Mill, El Monte and
Fremont. With the additive alternates, the Town will utilize the majority of the
remaining budget on failed pavement areas throughout Town, taking advantage of the
very reasonable bid prices.
Funding Proposed Five Year
History Budget Funding Plan
Prior Appropriations 400,000 400,000
Prior Spending -4,055
June Carryover 395,945
Committed Funds _ -3.95,945
September Balance 0 0
Proposed Appropriations FY 94-95 0 0
New Spending 94-95 0
Expected carryover September 1995 0
Anticipated Future Programming
FY 95-96
FY 96-97
FY 97-98
FY 98-99
Total Project Cost $400,000
19
• •
1994-1995 CAPITAL BUDGET
CAPITAL PROJECT: ROAD/PATH SIGN REPAIR/UPGRADE
TOTAL PROJECT COST: N/A
ANTICIPATED YEAR OF CONSTRUCTION: N/A
SOURCE(S)OF FUNDING: General Fund •
ACCOUNT NUMBER: 760
PROJECT DESCRIPTION:
This project has been in existence for a number of years. The intent was to replace
street and pathway signs and sign posts, upgrading the signs and converting the
sign posts from steel to wood. Staff has realized that this project is a duplication
of the Town's ongoing maintenance efforts and budgets. The upgrades have been
charged to the supplies budget of the appropriate account. Staff recommends that
the Council de-appropriate the remaining $4,699.
Funding Proposed Five Year
History Budget Funding Plan
Prior Appropriations 5,000 5,000
Prior Spending -301
June Carryover 4,699
Committed Funds
September Balance 4,699 4,699
Proposed Appropriations FY 94-95 -4,699 -4,699
New Spending 94-95
Expected Carryover September 1995 0
Anticipated Future Programming
FY 95-96
FY 96-97
FY 97-98
FY 98-99
Total Project Cost $301
20
i
•
1994-1995 CAPITAL BUDGET
CAPITAL PROJECT: MOODY PATH/SHOULDER RECONSTRUCTION
TOTAL PROJECT COST: $130,000
ANTICIPATED YEAR OF CONSTRUCTION: FY 94-95
SOURCE(S)OF FUNDING: Gas taxes/General Transfer
ACCOUNT NUMBER: 7-775
PROJECT DESCRIPTION:
The contract for construction of this path and wall has been awarded, and the Town
is currently waiting for the return of the signed contract and bonds. Construction
will occur during the month of October. A portion ($5,000-$10,000) of the carryover
budget will be used for geotechnical construction inspection.
Funding Proposed Five Year
History Budget Funding Plan
Prior Appropriations 130,000 130,000
Prior Spending -12,592
June Carryover 117,408
Committed Funds -64,960
September Balance 52,448 52,448
Proposed Appropriations FY 94-95 0 0
New Spending 94-95 -52,448
Expected Carryover September 1995 0
Anticipated Future Programming
FY 95-96 0
FY 96-97 0
FY 97-98 0
FY 98-99 0
Total Project Cost $130,000
L 21
• •
1994-1995 CAPITAL BUDGET
CAPITAL PROJECT: EL MONTE/STONEBROOK SIGNAL
TOTAL PROJECT COST: $12,000
ANTICIPATED YEAR OF CONSTRUCTION: FY94-95
SOURCE(S)OF FUNDING: Gas Taxes/General Transfers
ACCOUNT NUMBER: 7-776
PROJECT DESCRIPTION:
The signal controller equipment has arrived at the Town. The Town's signal
maintenance contractor has scheduled the installation for October. Once the project
is complete, the Town will file a reimbursement claim with the State for the grant
money.
Funding Proposed Five Year
History Budget Funding Plan
Prior Appropriations 12,000 12,000
Prior Spending 0
June Carryover 12,000
Committed Funds -5,177
September Balance 6,823 6,823
Proposed Appropriations FY 94-95
New Spending 94-95 -6,823
Expected Carryover September 1995 0
Anticipated Future Programming
FY 95-96
FY 96-97
FY 97-98
FY 98-99
Total Project Cost $12,000
22
• •
1994-1995 CAPITAL BUDGET
CAPITAL PROJECT: PAVEMENT MANAGEMENT 95
TOTAL PROJECT COST: $500,000
ANTICIPATED YEAR OF CONSTRUCTION: FY 94-95
SOURCE(S)OF FUNDING: Gas Taxes/General Fund Transfer
ACCOUNT NUMBER:
PROJECT DESCRIPTION:
During the spring and summer of this year the Public Works Department successfully
administered and produced a Pavement Management Plan in-house. The results of the
plan show that the spending levels of recent years have not been adequate to maintain
even the current average level of street condition. A further decline in the street
conditions would eventually lead to a logarithmic increase in maintenance spending.
From recent analysis, Staff has determined that a minimum spending of $500,000 per
year for the next several years will net a slow but steady increase in the condition of
the streets. Considering other spending needs, Staff recommends a minimum spending
of $500,000 for next year. Street conditions will be assessed again in two years to
assess the rate of this funding approach.
Funding Proposed Five Year
History Budget Funding Plan
Prior Appropriations 0 0
Prior Spending 0
0
Committed Funds 0
September Balance 0
Proposed Appropriations FY 94-95 500,000 500,000
New Spending 94-95 -500,000
Expected carryover September 1995 0
Anticipated Future Programming
FY 95-96 0
FY 96-97 0
FY 97-98 0
FY 98-99 0
Total Project Cost $500,000
23
• •
1994-1995 CAPITAL BUDGET
CAPITAL PROJECT: ROBLEDA ROAD SHOULDER/PATH
RECONSTRUCTION
TOTAL PROJECT COST: $200,000
ANTICIPATED YEAR OF CONSTRUCTION: FY 94-95
SOURCE(S)OF FUNDING: Gas tax, General Fund
ACCOUNT NUMBER:
PROJECT DESCRIPTION:
This project is similar in nature and intent to the Moody Road Path/Shoulder Recon-
struction project that will be under construction shortly. The area to be reconstructed
is on the west side of Robleda Road, starting at the intersection of Chapin and continuing
north for approximately 600 feet. Along this section of road the shoulder/path has
been eroded away, sometimes up to the edge of pavement. This results in a missing
length of path as well as loss of road stability. Cracks are evident in the asphalt
indicating that the roadway is beginning to fail, migrating downhill. Staff recommends
that this portion of street and path be repaired prior to any major slipouts occurring.
Funding Proposed Five Year
History Budget Funding Plan
Prior Appropriations 0 0
Prior Spending 0
June Carryover 0
Committed Funds 0
September Balance 0
Proposed Appropriations FY 94-95 200,000 200,000
New Spending 94-95 -200,000
Expected Carryover September 1995 0
Anticipated Future Programming
FY 95-96 0
FY 96-97 0
FY 97-98 0
FY 98-99 0
Total Project Cost $200,000
24
• •
1994-1995 CAPITAL BUDGET
CAPITAL PROJECT: STORM DRAIN IMPROVEMENTS 95
TOTAL PROJECT COST: $275,000
ANTICIPATED YEAR OF CONSTRUCTION: FY94-95
SOURCE(S)OF FUNDING: Drainage In-Lieu Fees, General Fund
ACCOUNT NUMBER:
PROJECT DESCRIPTION:
This project proposes funding for miscellaneous storm drainage projects. The specific
projects will be brought back to the City Council at a later date prior to advertising
for bid.
Funding Proposed Five Year
History Budget Funding Plan
Prior Appropriations' 0 0
Proposed Appropriations FY 94-95 125,000 125,000
New Spending 94-95 -125,000
Expected Carryover September 1995 0
Anticipated Future Programming
FY 95-96 150,000
FY 96-97 0
FY 97-98 0
FY 98-99 0
Total Project Cost $275,000
25
• •
1994-1995 CAPITAL BUDGET
CAPITAL PROJECT: DRIVEWAY ROUGHENING 95
TOTAL PROJECT COST: $9,000
ANTICIPATED YEAR OF CONSTRUCTION: FY 94-95
SOURCE(S)OF FUNDING: General Fund
•
ACCOUNT NUMBER:
PROJECT DESCRIPTION:
The Pathway Committee has requested that a new appropriation be made for another
25 driveways for the upcoming capital budget. The list of driveways to be roughened
would be provided by the Pathway Committee at a later date.
Funding Proposed Five Year
History Budget Funding Plan
Prior Appropriations 0 0
Prior Spending 0
June Carryover 0
Committed Funds 0
September Balance 0 0
Proposed Appropriations FY 94-95 0 0
New Spending 94-95 0
Expected carryove September 1995 0
Anticipated Future Programming
FY 95-96 9,000
FY 96-97 0
FY 97-98 0
FY 98-99 0
Total Project Cost $9,000
26
•
•
1994-1995 CAPITAL BUDGET
CAPITAL PROJECT: EL MONTE SLOUGH WALL
(ALONG ST. NICHOLAS)
TOTAL PROJECT COST: $15,000
ANTICIPATED YEAR OF CONSTRUCTION: None proposed
SOURCE(S)OF FUNDING: Gas Taxes/General Loan
ACCOUNT NUMBER:
PROJECT DESCRIPTION:
This project has been requested by St. Nicholas School. The school has concern
regarding the potential failure of the slope along the sidewalk on the south side
of El Monte, between the St. Nicholas driveway at Voorhees and the former driveway,
approximately 600 feet to the east. The school has proposed that if the Town
• supplied the materials, the church would perform the work.
After monitoring the slope over the past two winters, the Public Works Department
believes that any potential sloughing may be a maintenance problem, but not one
requiring much time. Staff feels that this project should not be programmed at this
time, so that Staff can monitor the slope another winter. If additional problems
occur, Staff may then recommend a project at this location. •
Funding Proposed Five Year
History Budget Funding Plan
Prior Appropriations 0
Proposed Appropriations FY 94-95
New Spending 94-95 0
Expected carryover September 1995 0
Anticipated Future Programming
FY 95-96 0
FY 96-97 0
FY 97-98 0
FY 98-99 0
Total Project Cost $0
27
i
• •
1994-1995 CAPITAL BUDGET
CAPITAL PROJECT: EL MONTE MEDIAN PROJECT
TOTAL PROJECT COST: $15,000
ANTICIPATED YEAR OF CONSTRUCTION: FY 95-96
SOURCE(S)OF FUNDING: General Fund
ACCOUNT NUMBER:
PROJECT DESCRIPTION:
This project proposes to beautify the El Monte medians between Summerhill
Avenue and the Foothill College entrance by the placement of shredded redwood bark
in the median. The shredded bark is quite attractive and also inhibits weed growth,
minimizing maintenance costs. This project will be attempted by the Town's
Maintenance Crew. Due to the high speed traffic on each side of the median,
traffic control concerns may require the Town's Crew to be fortified by outside help.
Staff will keep the Council apprised on this project.
Funding Proposed Five Year
History Budget Funding Plan
Prior Appropriations 0 0
Proposed Appropriations FY 94-95 0 0
New Spending 94-95 0
Expected carryover September 1995 0
Anticipated Future Programming
FY 95-96
FY 96-97 0
FY 97-98 0
FY 98-99 0
Total Project Cost $0
28
1994-1995 CAPITAL BUDGET
CAPITAL PROJECT: MCCULLOCH PATH -TO MAGDALENA
TOTAL PROJECT COST: Not Known
ANTICIPATED YEAR OF CONSTRUCTION: FY 95-96
SOURCE(S)OF FUNDING: General Fund
ACCOUNT NUMBER:
PROJECT DESCRIPTION:
This project proposes to convert the sanitary access road through the McCulloch
Subdivision along 1-280, and the maintenance access road to Hale Creek along 1-280
from Magdalena to a pedestrian/bicycle facility. The proposed funding is intended
for acquisition of all necessary easements to accomplish this project. Future
funding will be necessary for construction of a creek crossing across Hale Creek.
It is not known at this time what the cost of this crossing may be.
Funding Proposed Five Year
History Budget Funding Plan
Prior Appropriations
Prior Spending
June Carryover 0
Committed Funds
September Balance
Proposed Appropriations FY 94-95 10,000 10,000
New Spending 94-95
Expected Carryover September 1995 10,000
Anticipated Future Programming
FY 95-96 0
FY 96-97 0
FY 97-98 0
FY 98-99 0
Total Project Cost $0
29