HomeMy WebLinkAbout47-15 RESOLUTION 47-15
A RESOLUTION OF THE CITY COUNCIL OF THE
TOWN OF LOS ALTOS HILLS AWARDING A CONTRACT FOR CONSTRUCTION
OF THE 2015 PAVEMENT REHABILITATION
PROJECT
WHEREAS, the City Engineer of the Town of Los Altos Hills did, in open session, duly
examine and consider all bids submitted to it for the construction of the 2015 Pavement
Rehabilitation Project.
WHEREAS, the City Engineer recommends that the contract for said project be awarded to the
lowest responsible bidder, O'Grady Paving Inc., for the amount of$815,347.94;
NOW, THEREFORE, BE IT RESOLVED by the City Council of the Town of Los Altos Hills
that the City Manager is hereby authorized and directed to execute the awarded contract to the
above-named firm on behalf of the Town of Los Altos Hills.
The above and foregoing Resolution was passed and adopted by the City Council of the Town of
Los Altos Hills at a regular meeting held on the 20th day of August, 2015 by the following vote:
AYES: Corrigan, Harpootlian, Larsen, Radford, Waldeck
NOES: None
ABSTAIN: None
ABSENT: None
BY:
Corri ayor
ATTEST: .
Deborah Padovan, City Clerk
Resolution 47-15 Page 1
2015 Pavement Rehabilitation Project
Street From To Street Length (Feet) Type of Work
Altamont Road Corbetta Ln. Moody Rd. 2,226 Microsurfacing
Anacapa Court Anacapa Dr. End 140 Microsurfacing
Arastradero Road Horseshoe Ln. Stirrup Wy. 1,870 Microsurfacing
Aric Lane Fremont Rd. End 940 Microsurfacing and
Digouts
Briones Way Altamont Rd. Via Ventana Wy. 1,600 Microsurfacing
Camino Hermoso Ravensbury Ave. Ravensbury Ave (south) 3,190 Microsurfacing
Drive (North)
Christopher's Lane Page Mill Rd. End 1,730 4" Full Grind and
Replacement
Conception Road Fremont Rd. Purissima Rd. 4,604 Microsurfacing
Corbetta Lane Altamont Rd. End 1,190 Microsurfacing and
Digouts
EI Monte Road Moody Rd. Stonebrook Dr. 2,640 Microsurfacing
Eshner Court Altamont Rd. End 381 Microsurfacing
Fremont Road Arastradero Rd. St. Francis Dr. 3,620 Microsurfacing
Hilltop Drive Barley Hill Rd End 1,070 Microsurfacing
Kingsley Avenue Altadena Dr. End 838 Microsurfacing and
Digouts
La Paloma Road Fremont Rd. Purissima Rd. 5,465 Microsurfacing
Mandoli Drive Arastradero Rd. End 585 Microsurfacing
Manuella Road Fremont Rd. 400' North of Scarff 3,415 Microsurfacing
Miranda Court Miranda Dr. End 265 Microsurfacing
Ohlone Lane Fremont Rd. End 360 Microsurfacing
Old Ranch Lane Old Ranch Rd. End 403 Microsurfacing and
Digouts
Olive Tree Court Olive Tree Ln. End 378 4" Full Grind and
Replacement
Paseo Del Roble Paseo Del Roble Dr. End 250 2" overlay
Court
Ravensbury Avenue Magdalena Ave. Camino Hermoso Dr.(North) 962 Microsurfacing
Rebecca Lane Dawson Dr. End 900 Microsurfacing and
Digouts
Roble Blanco Court Paseo Del Roble Dr. End 900 Microsurfacing
Sholes Court Alexander Dr. End 405 Microsurfacing
Story Hill Lane Page Mill Rd. End 1,603 Microsurfacing
Resolution 47-15 Page 2
Street From To Street Length (Feet) Type of Work
Sunhills Drive Mora Dr. 245'West of W. Loyola 700 4" Full Grind and
DR. Replacement
Teresa Way Stonebrook Dr. Kate Dr. 250 Microsurfacing
Tracy Court Arastradero Rd. End 265 2" overlay with Digouts
Via Corita Way Natoma Rd. End 355 Microsurfacing and
Digouts
Winsor Court Black Mountain Rd. End 205 Microsurfacing
TOTAL 43,705
TOTAL MILES OF TOTAL MILES FOR
PUBLIC ROAD 60.3 PROJECT 8.3 PERCENTAGE 13.7%
A thin maintenance treatment mixture of polymer modified emulsion,
Microsurfacing graded aggregates, mineral filler, water, and additives.
Approximately 5 year life-span.
4" Full Grind Remove 4" of pavement section and replace with 4" of asphalt concrete
and Replacement pavement. Approximately 20 year life-span.
2" Overlay Pave an additional 2" of asphalt concrete over the existing road surface.
Approximately 15 year life-span.
Digout
Remove 6" of failed pavement section and replace with 6" of asphalt concrete
pavement (Localize Repair).
Resolution 47-15 Page 3