2013 California Green Building Standard Code (CGC)
Residential Checklist
New residential buildings shall be designed to include the green building mandatory measures specified in this
checklist. This checklist shall also apply to all additions or alterations of an existing residential building where the
addition or alteration increases the building's conditioned area, volume, or size (the requirements apply only to the
specific area of the addition or alteration).
BUILDING PERMIT NO.:
ADDRESS OF PROPERTY:
MANDATORY
MEASURES
SPECIFIED
(please check boxes
below)
I Feature or Measure I YES I
A plan has been developed and will be implemented to manage storm water drainage during construction per
CGC 4.106.2 & 4.106.3
Plumbing fixtures (Water closets and urinals) shall comply with the following:
The effective flush volume of all water closets shall not exceed 1.28 gal/flush (CGC 403.1.1). ❑
The effective flush volume of all urinals shall not exceed 0.5 gal/flush (CGC 403.1.2). ❑
Fittings (faucets and showerheads) have all required standards listed on plans and are in accordance to CGC 4.303.1.3 ❑
and CGC 403.1.4.
Automatic irrigation system controller for landscaping provided by the builder and installed at the time of final ❑
inspection shall comply with CGC 4.304.
Annular spaces around pipes, electric cables, conduits or other openings in sole/bottom plates at exterior walls
shall be rodent proofed by closing such openings with cement mortar, concrete masonry, or similar method ❑
acceptable_to the enforcing agency per CGC 4.406.1.
A minimum of 50% of the non -hazardous construction and demolition waste generated at the site shall be diverted to an ❑
offsite recycle, diversion or salvage facility per CGC 4.408.
An operation and maintenance manual will be provided to the building occupant or owner per CGC4.410.1. I ❑ I
Any gas fireplaces shall be a direct -vent sealed -combustible type. 1 ❑
Any wood stove or pellet stove shall comply with US EPA Phase H emission limits per CGC 4.503.1. 1 ❑
At the time of rough installation, during storage on the construction site and until final startup of the heating,
cooling and ventilating equipment, all duct and other related air distribution components openings shall be covered with ❑
tape, plastic, sheet metals, or other methods acceptable to the enforcing agency to reduce the amount of water, dust or
debris, which may enter the system per CGC 4.504.1.
Adhesive, sealants and caulks shall meet the VOC or other toxic compound limits per CGC 4.504.2.1. ❑
Feature or Measure YES
SITE DEVELOPMENT
Paints and coating shall comply with VOC limits per CGC 4.504.2.2. ❑
Aerosol paints and coatings shall meet the Product -weighted MIR limits for ROC and other requirements per
CGC 4.504.2.3. ❑
Documentation will be provided, at the request of the Building Dept. to verify compliance with VOC finish materials per ❑
CGC 4.504.2.4.
Carpet system installed in the building interior shall meet the testing and product requirement per CGC 4.504.3 ❑
Where resilient flooring is installed, at least 80% of the floor area receiving resilient flooring shall comply ❑
with the requirements per CGC 4.504.4.
Hardwood plywood, particleboard and medium density fiberboard composite wood products used on the interior
and exterior of the building shall comply with the low formaldehyde emission standards per CGC 4.504.5. ❑
a INTERIOR MUISTURE CONTROL
A capillary break shall be installed if a slab on grade foundation system is used. The use of a 4" thick base of 1/2 " or
larger clean aggregate under a 6 mil vapor retarder with joint lapped not less than 6" will be provided per CGC 4.505.2 ❑
and CRC R506.2.3.
Responsible Designer's Declaration Statement
I hereby certify that this project has been designed to meet the
requirements of the 2013 California Green Building Standards
Code
Contractor Declaration Statement
I hereby certify, as the builder or installer under the permit
listed herein, that this project will be constructed to meet the
the requirements of the California Green Building Standards
Code.
Name:
Name:
Signature:
Signature:
Date:
Date:
Company:
Company:
Address:
Address:
City: Sate: Zip:
City: Sate: Zip:
CGC Residential Checklist — Page 2