Loading...
HomeMy WebLinkAbout39-16 RESOLUTION 39-16 A RESOLUTION OF THE CITY COUNCIL OF THE TOWN OF LOS ALTOS HILLS AWARDING A CONTRACT FOR CONSTRUCTION OF THE 2016 PAVEMENT REHABILITATION PROJECT WHEREAS,the City Engineer of the Town of Los Altos Hills did, in open session, duly examine and consider all bids submitted to it for the construction of the 2016 Pavement Rehabilitation Project. WHEREAS, the City Engineer recommends that the contract for said project be awarded to the lowest responsible bidder, O'Grady Paving Inc., for the amount of$716,710.60; WHEREAS, the City Engineer recommends that funds of $70,000.00 be made available for construction contingency; and WHEREAS, the City Manager recommends that funds of $40,000 be made available for inspection and testing of said project. NOW, THEREFORE, BE IT RESOLVED by the City Council of the Town of Los Altos Hills that: 1. The City Manager is hereby authorized and directed to execute the awarded contract to the above-named firm on behalf of the Town of Los Altos Hills 2. The Public Works Director is hereby authorized to approve contract change orders in an amount not to exceed $70,000.00. 3. The City Manager is hereby authorized to execute necessary contracts with an inspection and testing firms in an amount not to exceed$40,000. The above and foregoing Resolution was passed and adopted by the City Council of the Town of Los Altos Hills at a special meeting held on the 20th day of July, 2016 by the following vote: AYES: Harpootlian, Waldeck, Corrigan, Radford, Spreen NOES: None ABSTAIN: None ABSENT: None BY: o Harpootlian, Mayor ATTEST:, --Deborah Padovan, City Clerk Resolution 39-16 Page 1 2016 Pavement Rehabilitation Project Street Street From To Length Type of Work (Feet) Adobe Lane Tepa Way End of 3rd 690 Remove and Replace 4"A.C. and Install 3'wide Parcel (NE) A.C. swale Alejandro Drive St. Francis Road End (South) 393 Microsurfacing Almaden Court Altamont Road End of 4th Parcel 722 Remove and Replace 4"A.C. (Southern Side) Altamont Road Page Mill Road Black Mountain Road 2592 Microsurfacing Alta Tierra Road Robleda Road La Paloma Road 1610 Microsurfacing Ascencion Drive Anacapa Drive St. Francis Dr 1601 Microsurfacing Barton Court Fremont Road End 135 Microsurfacing Barley Hill Road Hilltop Drive End 1745 Microsurfacing Bledsoe Court Moody Road End 105 Microsurfacing Catherine Court Donelson Place End 480 2" Overlay Carillo Lane LA Cresta Drive End 450 Microsurfacing Dawn Lane Elena Road End 400 2" Overlay with Digouts Duval way Robleda Road End 1200 Microsurfacing Elena Road Robleda Road Moody Road 3980 Microsurfacing Esperanza Drive Concepcion End 2674 Microsurfacing with Digouts Road Fremont Road Miranda Road Burke Road 3705 Microsurfacing Liddicoat circle Liddicoat Drive Liddicoat Drive 2320 Microsurfacing Moody Road Elena Road Lane W/0 Murieta 7130 Microsurfacing Lan Orchard Hill Lane Robleda Road End 890 2" Overlay with Digouts and Replace 4'wide concrete valley gutter Robleda Road Fremont Road Elena Road 7685 Microsurfacing and Digout Snell Lane Fremont Road End 840 2" Overlay with Leveling Course Stonebrook EI Monte Road Teresa Way 3740 Microsurfacing Drive TOTAL 45,087 Resolution 39-16 Page 2 TOTAL MILES OF 60.3 TOTAL MILES FOR 8.S PERCENTAGE 14.2% PUBLIC ROAD PROJECT A thin maintenance treatment mixture of polymer modified emulsion, graded Microsurfacing aggregates, mineral filler, water, and additives. Approximately 5 year life-span. 4 Full Grind Remove 4" of pavement section and replace with 4" of asphalt concrete pavement. and Replacement Approximately 20 year life-span. 2 Overlay Pave an additional 2" of asphalt concrete over the existing road surface. Approximately 15 year life-span. Digout Remove 6" of failed pavement section and replace with 6" of asphalt concrete pavement (Localize.Repair). Resolution 39-16 Page 3