Laserfiche WebLink
2018 Pavement Rehabilitation and Drainage Improvement Project <br /> Street From To Street Type of Work <br /> Length <br /> (Feet) <br /> Alejandro Drive St. Francis Road End 294 Microsurfacing <br /> Altamont Road Black Mountain Road Taaffe Road 2,979 Microsurfacing <br /> Ascension Drive St. Francis Road End 630 Microsurfacing <br /> Byrne Park Lane Altamont Road w.of 27269 Byrne Park Lane 1,050 2"A.C. Overlay <br /> De Bell Road Manuella Road Estacada Drive 1,750 Microsurfacing <br /> Deer Springs Way Byrne Park Lane End 1,170 4" A.C. Remove and Replace <br /> Edgerton Road Black Mountain Road End 1,800 Microsurfacing <br /> El Monte Road Moody Road Foothill College Entrance 1,890 1.5"A.C. Overlay <br /> Emerald Hill Lane Prospect Avenue End 450 2"A.C. Overlay <br /> Fremont Road St.Francis Road Concepcion Road 1,250 2"A.C. Overlay <br /> Julietta Lane S. of 27340 Julietta Lane End 400 Microsurfacing <br /> La Cresta Court La Cresta Drive End 870 Microsurfacing <br /> La Loma Court La Loma Drive End 315 4" A.C. Remove and Replace <br /> La Loma Drive Prospect Avenue Summit Wood Road 1,495 4" A.C. Remove and Replace <br /> Natoma Road Elena Road Black Mountain Road Utility Trench Settlement Repair <br /> O'Keefe Lane 350' w. of Vista Serena End 930 Microsurfacing <br /> Page Mill Road Balari Ranch Road Country Way 3,518 1.5"A.C. Overlay <br /> Purissima Road Concepcion Road Robleda Road 2,325 Microsurfacing <br /> Ravensbury Avenue Hillpark Lane End 2,700 2"A.C. Overlay <br /> Roble Veneno Lane Concepcion Road End 330 Microsurfacing <br /> Seven Acres Lane Fremont Road End 310 2"A.C. Overlay <br /> Viscaino Place Viscaino Road End 360 Microsurfacing <br /> TOTAL 26,816 <br /> TOTAL MILES OF 61.4 TOTAL MILES FOR 5.1 PERCENTAGE 8.3% <br /> PUBLIC ROAD PROJECT <br /> Microsurfacinn <br /> A thin maintenance treatment mixture of polymer modified emulsion,graded aggregates,mineral filler,water, <br /> additives. Approximately 5-year life span. <br /> 1.5"&2"A.C.Overlay <br /> Pave an additional 1.5"or 2"of asphalt concrete over existing road surface.Approximately 12 to 15-year life span. <br /> 4"Full grind and replacement <br /> Remove 4"of pavement section and replace with 4"of asphalt concrete pavement.Approximately 20-year life span. <br /> Utility trench settlement repair <br /> Remove failed pavement section,recompact road base,and replace with 6"asphalt concrete pavement(localize <br /> repair). <br /> Resolution 55-IB Page 2 <br />