My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
77-23
LOSALTOSHILLS
>
City Clerk
>
Resolutions
>
2023
>
77-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 10:57:00 AM
Creation date
8/22/2023 10:43:03 AM
Metadata
Fields
Template:
Resolutions
Number
77-23
Date
08/17/2023
Description
Updating the FY 2023-24 Planning, Building, and Engineering Fee Schedules to Add and Update Deposit Amounts Related to: NPDES Permit C.3 Review and Inspection; Sewer Capacity/Impact/Rate Analysis; Sight Distance and Traffic Study Peer Review; Traffic Control Plan Review, Miscellaneous Engineering Staff Review, and Peer Review; and Town Attorney Land Use Review, and Determination that the Proposed Amendments are Not Subject to the California Environmental Quality Act
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Building Fees <br />Building Permit Fees <br />All Projects Base Fee <br />$240 <br />All Projects - Modifier <br />0.9% of project valuation <br />The project valuation is provided by the applicant at time of submittal and confirmed by Building <br />Dept staff during initial plan review. <br />Mechanical, Electrical and Plumbing Permits <br />All Projects Base Fee <br />$180 <br />All Projects - Modifier <br />0.9% of project valuation <br />The project valuation is provided by the applicant at time of submittal and confirmed by Building <br />Dept staff during initial plan review. <br />Furnace <br />$ 82 <br />Gas Lines <br />$82 <br />Water Heater <br />$82 <br />Reroof (< $50,000 valuation) <br />$375 <br />Reroof (> $50,000 valuation) <br />$375 + 0.9% of project valuation over <br />$50,000 <br />Solar energy system (set by State law) <br />$450 + $15/kW (above 15kW) <br />This fee is set per California Government Code Section 66015. <br />Demolition <br />$180 <br />Plan Review Fee <br />65% of Permit Fee <br />Plan Retention Fee <br />$25/page <br />Plan Retention Fee (electronic plans) <br />$75 <br />Planning and Engineering Review and Inspection Fees <br />Site Development Review <br />$830 <br />Site Development Compliance Inspections <br />$980 <br />ADU Plan Review <br />$725 <br />ADU Compliance Inspections <br />$830 <br />These review and inspection fees are assessed to all building permits that are subject to Planning <br />and Engineering review and compliance inspections. If more than three reviews are required to <br />issue a permit or more than six inspections required final a permit, additional review/inspections <br />fees may be assessed. <br />Green Building Fee <br />$4/$100,000 of assessed valuation, (Minimum <br />$1/$25,000 of valuation) <br />This fee is set per California Health and Safety Code Section 18931.6 and goes into the Building <br />Standards Administration Special Revolving Fund established under Section 19831.7 <br />Strong Motion Instrumentation & Seismic <br />Hazard Mapping Fee <br />$0.13/$1,000 of assessed valuation (Minimum <br />fee is $0.50) <br />Energy Fee (State Imposed) <br />Formula = 1.65 x (0.15 x building permit fee) <br />15% of Building Permit <br />Resolution 77-23 Page 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.