Laserfiche WebLink
Engineering Fees <br />Site Development Fee Deposit <br />Miscellaneous Engineering Staff and Third- $500.00 to $5,000.00 <br />Party Peer Review (varies based on scope <br />and actual cost <br />Street and Pathway Excavation Permit Fee Deposit <br />Permit Fee <br />$159.00 <br />Other Street Charges, where applicable <br />minimum $520)$11.00/sq.ft. <br />Other Pathway Charges, where applicable <br />minimum $520)$1.28/sq.ft. <br />Encroachment i Deposit <br />Application Fee <br />$326.00 <br />Inspection Deposit <br />$1,000.00 <br />Trenching Fee (minimum $400) <br />$17.00/lf <br />Fence; Wall; Irrigation; Driveway Cuts <br />$17.00/lf <br />maximum $595 <br />Sight Distance and Traffic Study Peer Review <br />$3,000.00 plus 10% <br />admin fee <br />$300.00 per sheet for <br />Traffic Control Plan Review (Traffic <br />standard lane closures; <br />$900 per sheet for long- <br />Consultant) <br />term (over one-week) <br />closures <br />Engineering Staff and Consultant Fee Rate <br />Public Works Director/City Engineer <br />$278 <br />Senior Engineer/Utility Engineering Manager <br />$234 <br />Associate Engineer <br />$219 <br />Assistant Engineer <br />$194 <br />Contracted Associate Engineer <br />$215.00 <br />Sewer Disposal Fee Deposit <br />Sewer Connection Fee (Residence) <br />$11,236.00 <br />Sewer Connection Fee (Church) <br />$11,236.00 <br />Sewer Connection Fee (Country Club) <br />$30,112.00 <br />Sewer Connection Fee (Office) <br />$20,674.00 <br />Sewer Connection Fee (Fire Station) <br />$33,708.00 <br />Sewer Reimbursement Fee <br />Varies based on reimbursement agreement <br />When connecting to privately developed sewer line <br />Annual Sewer Charge <br />See Sewer Assessment Fee Schedule <br />Appeal — Filing Fee and Deposit <br />$585.00 <br />1 $875.00 <br />Industrial Waste Discharge Permit <br />Full Cost to Town <br />Resolution 77-23 Page 8 <br />