My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
78-23
LOSALTOSHILLS
>
City Clerk
>
Resolutions
>
2023
>
78-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 10:57:08 AM
Creation date
8/22/2023 10:47:50 AM
Metadata
Fields
Template:
Resolutions
Number
78-23
Date
08/17/2023
Description
Denying the Appeal (APL23-0003) of the Planning Commission's July 13, 2023 Decision and Upholding the Approval of a Conditional Development Permit (CDP23-0002), Site Development Permit (SD22-0066), and Variance (VAR23-0001) at 25851 Estacada Drive with Conditions of Approval Issued on July 13, 2023 Planning Commission Public Hearing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11. All construction shall comply with 2019 California Green Building Standards Code, Part 11, <br />Title 24 mandatory measures. The property owner shall provide a 2019 CalGreen Residential <br />Checklist demonstrating conformance with all applicable mandatory measures at time of <br />building permit submittal. <br />12. All construction shall comply with Section R337 of the 2019 California Residential Code <br />(Materials and Construction Methods for Exterior Wildfire Exposure). <br />13. The property owner shall remove all Stinkwort (Dittrichia graveolens) plants from the entire <br />property and in the road right-of-way by manual pulling or use of herbicide by October 1 st <br />of each year until the final approval of the project. <br />14. After completion of rough framing or at least six (6) months prior to scheduling a final <br />inspection, the applicant shall submit landscape screening and erosion control plans for <br />review by the Planning Commission. The application for landscape screening and erosion <br />control shall be accompanied by the applicable fee and deposit. The plans shall be reviewed <br />at a noticed public hearing. Attention shall be given to plantings which will be adequate to <br />break up the view of the new residence from surrounding properties and streets. All <br />landscaping required for screening purposes and for erosion control (as determined by the <br />City Engineer) must be installed prior to final inspection of the new residence. The landscape <br />screening plan shall comply with Section 10-2.809 (water efficient landscaping) of the Los <br />Altos Hills Municipal Code. <br />15. A $5,000 landscape maintenance and water usage deposit shall be paid to the Town prior to <br />final inspection of the new residence. Two years after the project has been completed, the <br />applicant shall furnish staff with the last 12 months of water usage for the property and <br />conduct a site inspection to ensure installed landscape screening is still present and has been <br />adequately maintained. Inadequate maintenance of installed landscape screening and/or <br />water usage greater than the annual usage indicated on the approved parcel water budget <br />worksheet, may result in complete forfeiture of this deposit. <br />16. Prior to beginning any grading operation, all significant trees, particularly any heritage oak <br />trees, are to be fenced at the drip line. The fencing shall be of a material and structure (chain- <br />link) to clearly delineate the drip line. Town staff must inspect the fencing and the trees to <br />be fenced prior to commencement of any grading. The property owner shall call for said <br />inspection at least three days in advance of the inspection. The fencing must remain <br />throughout the course of construction. No storage of equipment, vehicles or debris shall be <br />allowed within the drip lines of these trees. Existing perimeter plantings shall be fenced and <br />retained throughout the entire construction period. <br />17. Prior to requesting the final inspection, a registered civil engineer or licensed land surveyor <br />shall certify in writing and state that "the locations of the additions, are no less than 40 feet <br />from the front property line and 14'-11" from the easterly side property line." The pad <br />elevation of the additions shall be similarly certified in writing to state that "the pad elevation <br />of the new residence matches the elevation and location shown on the Site Development <br />plan." The applicant shall submit the stamped and signed letter(s) to the Planning <br />Department prior to requesting a final inspection. <br />Resolution 78-23 Page 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.