Laserfiche WebLink
PASSED BY CONSENSUS: To select Barry Nathan as a finalist and to include him in <br /> • the interview process. Nathan was selected because his Rural Style design had received <br /> the most votes and he is a local architect. <br /> PASSED BY CONSENSUS: To select Carter Warr, CJW Architecture, as a finalist and <br /> to include him in the interview process. After reviewing the CJW proposal, the <br /> Committee noted his experience in designing local public buildings and the location of <br /> his firm in Portola Valley as reasons for his inclusion. <br /> PASSED BY CONSENSUS: To select Peter Duxbury, Duxbury Architects, as a finalist <br /> and to include him in the interview process. The Committee noted the residents positive <br /> comments to his Craftsman Style design, his experience in designing homes in Los Altos <br /> Hills and working with the Town's building requirements and the location of his firm in <br /> Los Altos as reasons for selecting him as a finalist. The Committee expressed concerns <br /> that Duxbury had limited experience in designing public facilities. <br /> 3.2 Discussion of Architect Interviews Tentatively Scheduled for May 13, 2003 <br /> Following Committee discussion, it was decided to schedule the three architect finalists <br /> for interviews of thirty minutes, with a break of fifteen minutes between interviews to <br /> allow for Committee comments. <br /> The interview schedule is as follows: CJW Architecture 6:30 — 7:00 pm, Barry Nathan <br /> 7:15—7:45 pm and Duxbury Architects 8:00—8:30 pm. <br /> PASSED BY CONSENSUS: To advise each candidate to be prepared to discuss the <br /> following: <br /> 1. FEES: The Committee wishes to view the costs related to the design of the <br /> building as a complete package of services. Please provide a hard number <br /> estimate for all architect fees; consultant bills (with markup); reimbursables; <br /> travel time and expenses; construction consultation visits; etc. This number <br /> should reflect the total project related billings the Town can expect from your <br /> firms participation in the project. Use a construction cost of$2.5 Million for the <br /> purposes of preparing this estimate. <br /> 2. RURAL DESIGN: Be prepared to comment on the Rural Design(the <br /> design preferred by the largest number of Town residents) and how you propose <br /> to build it for the $2.5 Million(construction cost) figure. What challenges do <br /> you see with the project? <br /> 3. QUALIFICATIONS: Let us know why you feel you are qualified for this <br /> project. What, in particular makes it likely that you can successfully design a <br /> cost effective, economical solution for this important civic building? <br /> 4. TIMELINE: Be prepared to discuss you schedule and how the design <br /> process can be completed in a timely manner. <br />