Laserfiche WebLink
PASSED BY CONSENSUS: To direct staff to implement Phase 1 of the website <br /> redesign and enhancement project. Council further directed that the short list of <br /> firms to be interviewed be brought back to Council for their review and input. <br /> 6. NEW BUSINESS <br /> 6.1 Analysis of Wilsey Ham expenses with in-house City Engineer <br /> The City Manager referred to the four year chart which had been prepared on the <br /> Wilsey Ham charges. This chart showed the total costs for the following Wilsey <br /> Ham services: applicant billings, engineering administration and Capital <br /> Improvement Projects. For FY97/98 the total was $157,758; for FY98-99 the <br /> total was $129,877; and for FY99-00 the total was $372,506. The proposed total <br /> for FY01-02 was $105,000 but this did not include Capital Improvement Projects <br /> as this budget has not yet been done. The Wilsey Ham engineering <br /> administration and applicant billing costs budgeted for the current year reflected <br /> a dramatic decrease from the two prior fiscal periods — more in line with FY97- <br /> 98 and FY98-99 expenses when Mr. Peterson was the Town's in-house City <br /> Manager/City Engineer. The City Manager further commented that these costs <br /> might be further reduced at mid-year as the new .City Engineer had an <br /> opportunity to analyze the most cost effective use of outside engineering <br /> consultants. It was likely that some project design would have to be outsourced <br /> along with some specialty engineering services like hydrology, surveying, <br /> • mapping, staking and inspection. <br /> Mayor Casey believed the outside consultant costs were still high and recommended <br /> this matter be reviewed again in the near future. Council agreed that this analysis <br /> should be looked at after the recently hired City Engineer has had a change to evaluate <br /> the analysis in view of workload. <br /> 6.2 Approval of contract with architect for Town Hall Project—Reso # <br /> This item was moved to the end of the meeting for discussion. <br /> 6.3 Ravensbury Pathway Status <br /> The Public Works Manager referred to his report which addressed the cost and <br /> construction options for constructing the extension of the existing pathway along <br /> the southwest side of Ravensbury Avenue from 25701 Lomita Linda Court to <br /> Camino Hermosa. This estimated cost was $137,000. $82,000 of this estimated <br /> cost was for the retainingwall, excavation and backfill that would be needed to <br /> put the path in this location. <br /> Council discussed this proposed project and related costs. Casey commented that <br /> it seemed very expensive for a relatively small project. Casey noted that she was <br /> going to be meeting with the Pathway Committee on September 20th and she <br /> • would discuss this project with them at that time. <br /> July 19, 2001 <br /> Regular City Council Meeting <br /> 5 <br />